HousePrecheckCheck an address

744 Danforth AveToronto · zoning, lot size and permit records

Also 742 Danforth Ave, 746 Danforth Ave, 748 Danforth Ave

Commercial residential · CR 3.0 (c2.5; r2.5) SS2 (x2426)12.1 × 27.4 m332 m²on Danforth Ave

Not a home

A commercial or mixed-use building

4 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 3 development applications open within 300 m, up to 49 storeysNew buildings may go up around here in the next years. More change nearby than at 91% of Toronto houses.
  • Major Transit Station Area: PapeThe City plans more homes around the station: good for transit, and more building over time.
N10 m
12.1 m frontage27.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 49 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • By-law investigation26 127843 GRA 00 IVClosed

    Notice Issued Graffiti

    Nov 26, 2025 · 744-746 DANFORTH AVE
  • By-law investigation25 258999 GRA 00 IRClosed

    Graffiti

    Nov 26, 2025 · 744-746 DANFORTH AVE
  • By-law investigation25 242455 GRA 00 IVClosed

    Notice Issued Graffiti

    Jul 24, 2025 · 744-746 DANFORTH AVE
  • By-law investigation25 199398 GRA 00 IRClosed

    Graffiti

    Jul 24, 2025 · 744 DANFORTH AVE
  • Zoning review04 187863 LTOClosed
    Nov 3, 2004 · 744-746 DANFORTH AVE
  • Zoning review01 013118 LTOClosed
    Aug 9, 2001 · 744-746 DANFORTH AVE
  • Zoning review99 021834 LTOClosed
    Jan 25, 1999 · 744-746 DANFORTH AVE

Check before you build

  • Site-specific exception 900.11.10(2426)

    Needs a closer look

    2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2426)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands, the maximum interior floor area used for an amusement arcade , recreation use , eating establishment , or any combination of these uses is 400 square metres; and [TO: 438-86; 12(2) 199]

  2. Rule B

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270 (a) of former City of Toronto By-law 438-86; (B) On 80 Danforth Ave., former City of Toronto by-laws 392-76 and 487-76

  3. Older by-law A

    On the lands, the maximum interior floor area used for an amusement arcade , recreation use , eating establishment , or any combination of these uses is 400 square metres; and [TO: 438-86; 12(2) 199]

  4. Older by-law B

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270 (a) of former City of Toronto By-law 438-86; (B) On 80 Danforth Ave., former City of Toronto by-laws 392-76 and 487-76

4 parts for other addresses
  • C On the lands municipally known as 411 Danforth Ave. in 1996, Section 12(1) 429 (i) of former City of Toronto By-law 438-86
  • D On the lands municipally known as 535 Danforth Ave. in 1996, Section 12(1) 429 (ii) of former City of Toronto By-law 438-86.
  • C On the lands municipally known as 411 Danforth Ave. in 1996, Section 12(1) 429 (i) of former City of Toronto By-law 438-86
  • D On the lands municipally known as 535 Danforth Ave. in 1996, Section 12(1) 429 (ii) of former City of Toronto By-law 438-86.
By-law 569-2013, Chapter 900

Lot facts

Area
332 m²
Frontage
12.1 m
Depth
27.4 m
Street
Danforth Ave
Corner lot
No
Public lane
None
House footprint
217 m²roof up to 12.4 m
Back yard
6.4 mhouse to rear lot line
Side yards
0 m and 0.1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
16 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Pape. The lot is inside the Pape Major Transit Station Area approved by the Province (Site and Area Specific Policy 616). Source
  • Zone CR 3.0 (c2.5; r2.5) SS2 (x2426) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: elm (15 cm), maple (9 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%56 of 60 decisions
Garden suite permits
0
Laneway suite permits
10
Multiplex permits
6
Development applications
7

Within 300 m, last 10 years. 16 suite and multiplex permits: more than at 84% of Toronto houses (median 3). 60 variance decisions: more than at 92% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by constructing a rear one-storey addition (for additional ground floor commercial space) with a rear exit and landing. The existing dental office use will occupy the entire ground floor of this building as well as the adjacent building to the west (municipally known as 641 Danforth Avenue). The two existing residential dwelling units on the second and third storeys will be maintained and unaltered.

    643 DANFORTH AVE · Jun 5, 2024 · 220 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by constructing a rear one-storey addition (for additional ground floor commercial space) with a rear exit and landing. Also, to construct a new rear fire escape staircase on the west side of the new addition. The existing dental office use will occupy the entire ground floor of this building as well as the adjacent building to the east (municipally known as 643 Danforth Avenue). The two existing residential dwelling units on the second and third storeys will be maintained and unaltered.

    641 DANFORTH AVE · Jun 5, 2024 · 224 m away
  • Minor varianceApproved

    To alter the existing two-storey mixed-use building by constructing: a rear second-storey addition; a third storey addition; a front and rear rooftop patio; and a rear staircase leading to the second and third levels. A total of four one-bedroom dwelling units will be installed within the building.

    673 DANFORTH AVE · Apr 27, 2022 · 147 m away
  • Minor varianceApproved

    To legalize and to maintain the existing secondary suite in the basement of the existing two-and-one-half-storey semi-detached dwelling as well as the front and rear basement walkouts, constructed without the benefit of a building permit.

    774 PAPE AVE · Mar 23, 2022 · 325 m away
  • Minor varianceApproved

    To construct a new second storey rear addition.

    843 PAPE AVE · Jun 2, 2021 · 447 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent for the technical severance of the property for the purpose of re-establishing two lots which merged on title.

    721 DANFORTH AVE · Dec 16, 2026 · 67 m away
  • Minor variancePending

    To construct a new three-storey detached building (houseplex) with front and rear basement walkouts, first storey front and rear covered porches, and front and rear second storey decks. Also, to construct a new rear two-storey ancillary building (containing one laneway suite), abutting the public laneway. There will be a total of five residential dwelling units on this lot (four units occupying the main building, and one unit occupying the ancillary building).

    43 EATON AVE · Dec 2, 2026 · 146 m away
  • Zoning review

    Not Started

    743 PAPE AVE · Nov 25, 2026 · 187 m away
  • Building permit

    Change of use of commercial main floor to a coffee store. Alterations on first floor. Built new fire exist stairs for the residential units at the rear of the coffee store from the flat roof.

    681 DANFORTH AVE · Nov 4, 2026 · 131 m away
  • Building permit

    EXISTING PLACE OF WORSHIP CHANGED TO RESIDENTIAL DWELLING. NO EXTERIOR WORK BEING PROPOSED. SANCTUARY AT MAIN FLOOR LEVEL TO BE CONVERTED TO KITCHEN/LIVING AND BEDROOM SPACE.

    562 JONES AVE · Nov 4, 2026 · 266 m away
  • Building permit

    Back water valve installation

    51 HARCOURT AVE · Nov 3, 2026 · 257 m away
  • Building permit

    Back water valve and sump pump installation

    34 EATON AVE · Nov 3, 2026 · 127 m away
  • Building permit

    Supply and install main sanitary back water valve

    45 HARCOURT AVE · Nov 3, 2026 · 262 m away
  • Zoning review

    Closed

    735 DANFORTH AVE · Oct 23, 2026 · 56 m away
  • Building permitmultiplex

    Proposed interior alterations to legalize existing rental units.

    12 GERTRUDE PL · Oct 21, 2026 · 200 m away

Neighbourhood: Danforth

About the area around the lot, not the lot itself.

Nearest station
Pape Station2 min walk
Nearest TTC stop
Danforth Ave at Woodycrest Ave1 min walk
Nearest cycling route
Danforth AveCycle Track, 1 min walk
Nearest traffic count
10,727 vehicles in 8 hDanforth Ave / Eaton Ave, 40 m away, Jul 6, 2017
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 2 with cyclists
Parks
Langford Parkette2 min walk
24 Dewhurst Boulevard Park4 min walk
Carlaw Avenue Parkette5 min walk

Schools within 1 km

  • EARL GREY SR PUBLIC SCHOOL English Public 6 min walk
  • JONES AVENUE ADULT CENTRE English Public 6 min walk
  • HOLY NAME CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • KAPAPAMAHCHAKWEW - WANDERING SPIRIT SCHOOL & SUBWAY ACADEMY ONE English Public 8 min walk
  • WILKINSON JR PUBLIC SCHOOL English Public 8 min walk
  • FRANKLAND COMMUNITY SCHOOL English Public 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDanforthMedian neighbourhood
Median household income (2020)$98,000$84,500
Households that own their home63%54%
Population (2021)9,30516,813
Homes built in 1960 or before76%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDanforthCity median
Assault1561.7636.3
Robbery68.369.5
Homicide9.85.3
Auto theft263.5192.6
Theft over $5,0009.846.1
Break and enter185.5172.8
Theft from vehicles312.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.