740 Progress AveToronto · zoning, lot size and permit records

≈ 161.1 × 325.4 m31,110 m²on Corporate Drcorner, also on Progress Ave

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 226430 (Addition of a new wall within existing Switchboard B1 Electrical Room on the second flo..., 2026); 25 184527 (Revision 1: Revision is to include addition of new walls on the 2nd floor for conduits..., 2026); 26 128680 (Proposal to Install one (1) maglock on ground floor, 2026); and 1 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 7 development applications open within 300 m, up to 54 storeysNew buildings may go up around here in the next years. More change nearby than at 91% of Toronto houses.
N50 m
≈ 161.1 m frontage≈ 325.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (22% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (6% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (16% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 226430 (Addition of a new wall within existing Switchboard B1 Electrical Room on the second flo..., 2026); 25 184527 (Revision 1: Revision is to include addition of new walls on the 2nd floor for conduits..., 2026); 26 128680 (Proposal to Install one (1) maglock on ground floor, 2026); and 1 more.

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 7 development applications open within 300 m

    Good to know

    7 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 54 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

69 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 226430Permit Issued

    Addition of a new wall within existing Switchboard B1 Electrical Room on the second floor to accommodate new equipment layout

    Sep 1, 2026 · 740 PROGRESS AVE
  • Building permit25 184527Revision Issued

    Revision 1: Revision is to include addition of new walls on the 2nd floor for conduits to pass through. Proposal to construct interior alterations for 3 new Electrical rooms on the 1st floor a and new wall to accommodate equipment removal.

    Aug 10, 2026 · 740 PROGRESS AVE
  • Building permit26 128680Inspection

    Proposal to Install one (1) maglock on ground floor.

    Mar 16, 2026 · 740 PROGRESS AVE
  • Building permit26 116099Cancelled

    1st floor infrastructure Upgrades - CDC Replacement. Proposal to Install total of one (1) maglock, on1st floor. Please see the attached Dwg. # E4-02.

    Feb 11, 2026 · 740 PROGRESS AVE
  • Building permit25 116228Closed

    Proposed replacement of existing sprinkler system on first and second-floor In data centre white tile space (total of four sprinkler zones) and installation of new nitrogen generator system.

    Feb 20, 2025 · 740 PROGRESS AVE
  • Building permit22 192646Closed

    Proposal to install total of 5 maglocks on 2nd floor. See attached sheet. 4 of 6 dwg. # E4-02.Revision Drwgs; Excluded Area Hash marked

    Jun 1, 2023 · 740 PROGRESS AVE
  • Building permit22 156365Closed

    New sprinkler at he skylight related to permit # 20 155168

    Jun 22, 2022 · 740 PROGRESS AVE
  • Building permit22 106794Closed

    Proposed installation of the protection system including pre-action sprnklers and VESDA system in the tape storage library.

    Feb 25, 2022 · 740 PROGRESS AVE
Show 61 older records
  • Building permit21 224500Closed

    Proposal for interior alteration for an addition of CDCs, STS-PDUs, and RPPs. Construction of 3 new electrical rooms within existing 2nd floor white tile space.

    Dec 8, 2021 · 740 PROGRESS AVE
  • Building permit20 217978Closed

    Installation of three electromagnetic maglocks on the second floor

    Jan 6, 2021 · 740 PROGRESS AVE
  • Building permit20 211071Closed

    Proposal for interior alterations for existing office building

    Dec 3, 2020 · 740 PROGRESS AVE
  • Building permit20 204264Closed

    Proposal for interior alterations to add a cage partition on the second floor.

    Nov 9, 2020 · 740 PROGRESS AVE
  • Building permit20 189566Closed

    Proposal for the replacement of the existing heating boilers and associated heating system.

    Nov 3, 2020 · 740 PROGRESS AVE
  • Building permit20 155168Closed

    Proposal to replace building envelope, reroofing, recladding and skylight replacement on ground, 2nd, 3rd and 4th of existing office building

    Jul 27, 2020 · 740 PROGRESS AVE
  • Building permit19 231089Closed

    Interior alterations to 3rd floor

    Nov 8, 2019 · 740 PROGRESS AVE
  • Building permit19 203296Closed

    Proposal to install 1 electromagnetic lock on basement.

    Oct 7, 2019 · 740 PROGRESS AVE
  • Building permit16 154061Closed

    REV. #1 - revised slabrenovation of existing office space into electrical rooms

    Aug 24, 2016 · 740 PROGRESS AVE
  • Building permit16 139283Closed

    Proposal to install 2 maglocks on the ground floor

    Apr 18, 2016 · 740 PROGRESS AVE
  • Building permit16 116862Closed

    Proposal for interior alterations to construct new openings within existing server room (G-02), and to construct a new electrical room for the installation of new electrical and mechanical support equipment for the existing data centre

    Apr 5, 2016 · 740 PROGRESS AVE
  • Building permit16 118601Closed

    HVAC - Proposal for an interior demolition to the basement plan to prepare for new electrical rooms (under separate permit application)

    Mar 17, 2016 · 740 PROGRESS AVE
  • Building permit15 246932Closed

    install 1 maglock on ground floor

    Nov 13, 2015 · 740 PROGRESS AVE
  • Building permit15 130810Closed

    Install four maglocks two on ground and 2 on second floor

    Apr 29, 2015 · 740 PROGRESS AVE
  • Building permit14 232117Closed

    Proposal for interior alterations to the 3rd and 4th floors of existing office - "TD Bank"

    Nov 19, 2014 · 740 PROGRESS AVE
  • Building permit14 207844Closed

    Proposal to install a grease trap on the 3rd floor fo the existing office building.

    Aug 21, 2014 · 740 PROGRESS AVE
  • Building permit14 202533Closed

    Interior alterations to install security turnstyles on first and second floor of existing office.

    Aug 20, 2014 · 740 PROGRESS AVE
  • Building permit14 168747Closed

    Proposed renovations to third floor washrooms (36m2) for Toronto Dominion Bank Financial Group.

    Jun 17, 2014 · 740 PROGRESS AVE
  • Building permit14 125192Closed

    Interior alterations to install new chiller units, cooling tower, generator and replacement of existing UPS & switch boards

    Jun 3, 2014 · 740 PROGRESS AVE
  • Building permit13 278816Closed

    Installation of one electromagnetic lock on the second floor

    Jan 13, 2014 · 740 PROGRESS AVE
  • Building permit13 240305Closed

    renovations to existing washrooms

    Oct 7, 2013 · 740 PROGRESS AVE
  • Zoning review12 280229 LPRClosed
    Nov 16, 2012 · 740 PROGRESS AVE
  • Building permit12 229939Closed

    upgrade exisitng fire alarm panel on 6 storeis & new pre-action system

    Sep 6, 2012 · 740 PROGRESS AVE
  • Building permit12 154831Closed

    install 26 maglocks, 5 on ground level, 10 in basement, 5 on 2nd flr, 2 on 5th flr, 4 at PH level

    May 15, 2012 · 740 PROGRESS AVE
  • Building permit11 287242Closed

    installation of 9 maglocks

    Oct 24, 2011 · 740 PROGRESS AVE
  • Building permit11 174781Closed

    non-structural re-roofing

    Oct 19, 2011 · 740 PROGRESS AVE
  • Building permit11 203346Application On Hold

    FS - Sprinkler Shop Drawing - interior alterations of office suite to accomodate new data centre

    Jun 28, 2011 · 740 PROGRESS AVE
  • Building permit11 214983Closed

    Repair walls damaged by flooding

    Jun 23, 2011 · 740 PROGRESS AVE
  • Building permit10 275429Closed

    interior alterations to 3rd floor

    Nov 9, 2010 · 740 PROGRESS AVE
  • Building permit10 264587Closed

    Alterations to washrooms on basement level and third floor

    Oct 8, 2010 · 740 PROGRESS AVE
  • Building permit10 258653Closed

    Install 5 mag locks on 5th and 6th floors

    Sep 23, 2010 · 740 PROGRESS AVE
  • Building permit08 224162Closed

    Install one maglock on 6th floor

    Feb 18, 2010 · 740 PROGRESS AVE
  • Building permit09 115370Cancelled

    1 Electromagnetic lock - move existing location.

    Oct 6, 2009 · 740 PROGRESS AVE
  • Building permit09 142085Closed

    interior alterations 3 rd & 4th floors

    Jun 19, 2009 · 740 PROGRESS AVE
  • Building permit09 119877Closed

    Rev #1 - Temporary exterior shoring for installation of three diesel tanks and seven water storage tanks using the shotcrete method of shoring (Previous method Caissons)Shoring permit for installation of underground fuel tanks and water storage units (emergency power supply)

    Jun 12, 2009 · 740 PROGRESS AVE
  • Building permit09 129354Closed

    add 1 mag locks in office area 2nd floor

    May 14, 2009 · 740 PROGRESS AVE
  • Building permit09 115357Closed

    HVAC - Interior office expansion and renovation.

    Apr 8, 2009 · 740 PROGRESS AVE
  • Building permit08 196406Cancelled

    FS - Sprinkler Shop Drawing - addition of diesel penthouse, new shillers & cooling tower

    Mar 19, 2009 · 740 PROGRESS AVE
  • Building permit09 105803Closed

    Install 2 maglocks on the ground floor

    Mar 4, 2009 · 740 PROGRESS AVE
  • Building permit08 181289Closed

    phase 1 upgrade, interalterations to basement, 3rd &4th floor

    Feb 10, 2009 · 740 PROGRESS AVE
  • Building permit08 226461Closed

    Install two 4" RP backflow preventers - premise isolation.

    Dec 2, 2008 · 740 PROGRESS AVE
  • Building permit08 199972Closed

    Install 5 maglocks

    Nov 7, 2008 · 740 PROGRESS AVE
  • Building permit08 193808Closed

    construct pad for exterior cooling tower

    Oct 16, 2008 · 740 PROGRESS AVE
  • Zoning review08 200469 PSPClosed
    Sep 4, 2008 · 740 PROGRESS AVE
  • Building permit08 171013Closed

    interior alterations to data processing area main floor

    Aug 21, 2008 · 740 PROGRESS AVE
  • Building permit08 195666Cancelled

    CONSTRUCT PARTITION WALL ON GROUND FLOOR & BASEMENT IN MEETING ROOM

    Aug 20, 2008 · 740 PROGRESS AVE
  • Building permit08 191066Closed

    Bathrooms on 2nd and 4th floors are being renovated- no partitioning

    Aug 14, 2008 · 740 PROGRESS AVE
  • Development application08 180128 ESC 38 SAClosed

    Applicant is proposing upgrades to their fuel, chiller plant and storm water storage systems. A new, 6th storey, 850 m2 roof top penthouse is proposed.

    Jul 9, 2008 · 740 PROGRESS AVE
  • Building permit07 278737Cancelled

    removal of existing fire alarm system, and complete installation of new fire alarm syste with all detection, sprinkler modification

    Dec 11, 2007 · 740 PROGRESS AVE
  • Building permit07 256999Closed

    interior alteration - "TD bank"

    Sep 24, 2007 · 740 PROGRESS AVE
  • Building permit07 241449Closed

    minor interior alterations to first and third floor

    Aug 8, 2007 · 740 PROGRESS AVE
  • Building permit07 235648Closed

    renovate existing washrooms on ground floor and third floor

    Jul 19, 2007 · 740 PROGRESS AVE
  • Building permit05 190792Closed

    interior alterations to basement and 4th floor for TD Canada Trust

    May 10, 2007 · 740 PROGRESS AVE
  • Building permit06 199260Closed

    HVAC - Interior alterations to basement

    Jan 5, 2007 · 740 PROGRESS AVE
  • Building permit06 118937Closed

    ADDITION OF THREE AIR HANDLING UNITS AND TWO AIRCONDITIONING UNITS

    Apr 18, 2006 · 740 PROGRESS AVE
  • Zoning review06 113589 PSPClosed
    Mar 1, 2006 · 740 PROGRESS AVE
  • Building permit05 211222Closed

    Interior alterations for office space floors 3 & 4, relocate sprinklers

    Jan 16, 2006 · 740 PROGRESS AVE
  • Building permit04 174710Closed

    work description: interior alterations existing use: office proposed use: office

    Nov 30, 2004 · 740 PROGRESS AVE
  • Building permit04 184361Closed

    1 MAGLOCK IN BASEMENT

    Oct 25, 2004 · 740 PROGRESS AVE
  • Building permit04 159799Closed

    interior alterations, build out offices, ground floor partitions, new carpet

    Oct 7, 2004 · 740 PROGRESS AVE
  • Building permit04 175131Closed

    1 MAGLOCK

    Sep 20, 2004 · 740 PROGRESS AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
31,110 m²
Frontage
161.1 mestimated, irregular lot
Depth
325.4 mestimated, irregular lot
Street
Corporate Dr
Corner lot
Yes, also on Progress Ave325.4 m along it
Public lane
None
House footprint
5,651 m²roof up to 39.1 m
Back yard
89.3 mhouse to rear lot line
Side yards
29.7 m and 178.3 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    7

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a total of 439 parking spaces for a development which contains two mixed-use buildings, 38 and 44-storeys in height, containing a total of 778 residential units. Cross-reference Site Plan Control Application 19 256766 ESC 24 SA.

      5 CORPORATE DR · Sep 10, 2025 · 480 m away
    • Minor varianceApproved

      Interior alterations to the north wing to convert the existing church space into a day nursery.

      801 PROGRESS AVE · Sep 10, 2025 · 276 m away
    • Minor varianceApproved

      To permit the construction of two rental residential towers with heights of 38 and 44-storeys joined by a 4-storey podium at the south-west corner of Consilium Place and Corporate Drive. The proposal will include 778 dwelling units, 731 square metres of commercial gross floor area, two levels of underground parking, indoor & outdoor amenity areas and surface parking areas (for visitors, car-share & retail). Cross Reference Site Plan Control Application 19 256766 ESC 24 SA and Official Plan Amendment Application 20 160281 ESC 24 OZ (to establish a cap on parkland dedication for the site).

      5 CORPORATE DR · Mar 10, 2022 · 480 m away
    • Minor varianceApproved

      The applicant is seeking relief from the provisions of the Zoning By-law to permit manufacturing uses in units number 1 and 11 (359 square metres) and units number 2 to 10 inclusive for vehicle service and repair use (1835 square metres).

      1120 BELLAMY RD N · Feb 28, 2019 · 464 m away
    • Minor varianceApproved

      The applicant is seeking relief from the provisions of the Zoning By-law to permit the growing of micro greens in the existing organic food processing company, Crown Sprouts.

      1147 BELLAMY RD N · Dec 13, 2018 · 473 m away

    Latest activity nearby

    • Building permit

      Interior alterations to existing industrial unit to establish a food processing operation.

      700 PROGRESS AVE · Nov 23, 2026 · 224 m away
    • Zoning review

      Closed

      108 CORPORATE DR · Nov 11, 2026 · 108 m away
    • Building permit

      Addition of a new wall within existing Switchboard B1 Electrical Room on the second floor to accommodate new equipment layout

      740 PROGRESS AVE · Sep 1, 2026 · 120 m away
    • Building permit

      To erect and display one illuminated wall sign***SHONAN SANDWICH & SWEET***

      26 LEE CENTRE DR · Aug 31, 2026 · 137 m away
    • Zoning review

      Closed

      700 PROGRESS AVE · Aug 11, 2026 · 224 m away
    • Building permit

      Revision 1: Revision is to include addition of new walls on the 2nd floor for conduits to pass through. Proposal to construct interior alterations for 3 new Electrical rooms on the 1st floor a and new wall to accommodate equipment removal.

      740 PROGRESS AVE · Aug 10, 2026 · 120 m away
    • Zoning review

      Notice Sent

      733-735 PROGRESS AVE · Jun 29, 2026 · 139 m away
    • Zoning review

      Cancelled

      801 PROGRESS AVE · Jun 15, 2026 · 276 m away
    • Building permit

      Proposal for localized repairs to site features, waterproofing and concrete foundation.

      36 LEE CENTRE DR · May 19, 2026 · 207 m away
    • Building permit

      Proposal to install a new fire alarm system.

      36 LEE CENTRE DR · Apr 16, 2026 · 207 m away

    Neighbourhood: Woburn North

    About the area around the lot, not the lot itself.

    Nearest station
    McCowan Rt Station12 min walk
    Nearest TTC stop
    Corporate Dr at Lee Centre Dr (West)1 min walk
    Nearest traffic count
    6,890 vehicles in 14 hLee Centre Dr / Corporate Dr / Lee Centre Park Trl, 80 m away, Apr 21, 2024
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Lee Centre Park1 min walk
    Hillsborough Park2 min walk
    White Haven Park11 min walk

    Schools within 1 km

    • MADINATUL ULOOM ACADEMY INC Private 3 min walk
    • MADINATUL ULOOM ISLAMIC GIRLS ACADEMY Private 4 min walk
    • AL HAADI SCHOOL Private 4 min walk
    • MADINATUL ULOOM ISLAMIC ACADEMY & OXFORD COLLEGE & FH INTERNATIONAL Private 6 min walk
    • ADVANCED CHRISTIAN ACADEMY Private 8 min walk
    • ADVANCED CHRISTIAN ACADEMY (Renamed) Private 8 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureWoburn NorthMedian neighbourhood
    Median household income (2020)$74,500$84,500
    Households that own their home54%54%
    Population (2021)26,58016,813
    Homes built in 1960 or before23%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleWoburn NorthCity median
    Assault768.9636.3
    Robbery76.569.5
    Shootings13.910.5
    Auto theft316.6192.6
    Theft over $5,00062.646.1
    Break and enter180.9172.8
    Theft from vehicles281.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.