Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (52% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (49% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 6582 building permits open, the oldest since 2004
Needs a closer lookStill open in the City's records: 11 291836 (installation of one backflow prevention device, 2011, status Permit Issued); 03 107702 (Two Storey Addition to Existing School. "BISHOP ALLEN"CM= S.T, 2004, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (52% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 9Work or applications in progress
Good to knowRecent records on this lot: 25 261592 (Demolition of existing two-storey secondary school. [Relocation of twenty four (24)port..., 2026); 25 114077 (Proposal to construct a new 3 storey school, replacing the existing school on the same..., 2025); 23 114992 WET 03 SA (Site Plan Control Application - Proposed new school, Bishop Allen Academy Catholic Seco..., 2023).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications2 Committee of Adjustment files on this lot
Good to know2 approved. A0260/23EYK (To construct a new school, 2024); A283/05EYK (To construct a two-storey addition containing a cafeteria and four classrooms to the ex..., 2005).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
29 records on file: more than at 100% of Toronto houses (median 0).
- Building permit25 261592Permit Issued
Demolition of existing two-storey secondary school. [Relocation of twenty four (24)portable classrooms by owner and not part of this application.]
Jan 6, 2026 · 721 ROYAL YORK RD - Building permit25 114077Under Review
Proposal to construct a new 3 storey school, replacing the existing school on the same site. The new building will be comprised of a 3 storey academic wing to the north, and a double height athletic/social wing to the south - Bishop Allen Academy Catholic Secondary SchoolSee also 23 114992 WET 03 SA and 23 164158 MV.
Feb 7, 2025 · 721 ROYAL YORK RD - Minor varianceA0260/23EYKApproved
To construct a new school.
Apr 11, 2024 · 721 ROYAL YORK RD - Zoning review23 114992 PSPClosedMar 22, 2023 · 721 ROYAL YORK RD
- Development application23 114992 WET 03 SAUnder Review
Site Plan Control Application - Proposed new school, Bishop Allen Academy Catholic Secondary School, replacing the existing school on the same site. The new building will be comprised of a 3 storey academic wing to the north, and a double height athletic/social wing to the south.***Resubmission removing scope of work within Berry Road and Southern Property (September 2026)
Feb 17, 2023 · 721 ROYAL YORK RD · City file - Zoning review22 185507 ZAPNotice SentAug 3, 2022 · 721 ROYAL YORK RD
- Building permit16 203881Closed
add 4 new portables
Dec 2, 2016 · 721 ROYAL YORK RD - Building permit16 248486Closed
Interior renovations to male and female washrooms including adding of 12 waterclosets to an existing School.
Nov 17, 2016 · 721 ROYAL YORK RD
Show 21 older records
- Building permit08 211400Closed
HVAC - Replace and relocate 20 certified portables to sodded area.
Nov 7, 2016 · 721 ROYAL YORK RD - Building permit11 314691Closed
installation of roof solar panel
Jan 26, 2012 · 721 ROYAL YORK RD - Building permit11 291836Permit Issued
installation of one backflow prevention device
Nov 21, 2011 · 721 ROYAL YORK RD - Zoning review08 230138 ZALCancelledDec 16, 2008 · 721 ROYAL YORK RD
- Building permit07 252083Closed - Dormant
placement of four portable classrooms-Bishop Allan Academy Catholic School
Jun 24, 2008 · 721 ROYAL YORK RD - Building permit06 107379Closed
Interior alterations to convert 4 existing classrooms into 2 science labs & 1 art room
Jul 24, 2006 · 721 ROYAL YORK RD - Building permit05 192881Closed
demolish a free standing portable classroom in existing school parking lot
Oct 27, 2005 · 721 ROYAL YORK RD - Minor varianceA283/05EYKApproved
To construct a two-storey addition containing a cafeteria and four classrooms to the existing school (Bishop Allen Academy). The south east portable will be replaced with 11 parking stalls.
Jun 23, 2005 · 721 ROYAL YORK RD - Zoning review04 198204 ZPRClosedDec 6, 2004 · 721 ROYAL YORK RD
- Building permit03 107702Inspection
Two Storey Addition to Existing School. "BISHOP ALLEN"CM= S.T.
May 12, 2004 · 721 ROYAL YORK RD - Zoning review03 178282 PSPClosedSep 24, 2003 · 721 ROYAL YORK RD
- Zoning review03 142531 PSPClosedJun 10, 2003 · 721 ROYAL YORK RD
- Zoning review02 182264 ZPRClosedOct 18, 2002 · 721 ROYAL YORK RD
- Zoning review02 146556 LTOClosedJun 14, 2002 · 721 ROYAL YORK RD
- Zoning review02 138568 LTOClosedMay 24, 2002 · 721 ROYAL YORK RD
- Building permit01 192220Closed
Washrooms, Interior alterations etc. to *Bishop Allen Secondary School*
Dec 3, 2001 · 721 ROYAL YORK RD - Building permit01 146122Closed
Plumbing fixtures to Bishop Allen Academy
Jun 13, 2001 · 721 ROYAL YORK RD - Building permit97 085604Closed
''BISHOP ALLEN SCHOOL'' 3 PORTABLES
Jun 27, 1997 · 721 ROYAL YORK RD - Building permit96 085725Closed
''BISHOP ALLEN SCHOOL'' RELOCATE PORTABLES
Jan 31, 1997 · 721 ROYAL YORK RD - Building permit91 083509Closed - Dormant
''BISHOP ALLEN'' HVAC TO ADDITION
Dec 16, 1991 · 721 ROYAL YORK RD - Building permit90 083503Closed - Dormant
HVAC TO EXISTING LABS & SCHOOL BUILDING
Jul 19, 1990 · 721 ROYAL YORK RD
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 39,212 m²
- Frontage
- 208.2 mestimated, irregular lot
- Depth
- 330.1 mestimated, irregular lot
- Street
- Royal York Rd
- Corner lot
- Yes, also on Coney Rd330.1 m along it
- Public lane
- None
- House footprint
- Not showna new house or demolition permit since the City's 3D survey
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 90%9 of 10 decisions
- Garden suite permits
- 1
- Laneway suite permits
- 0
- Multiplex permits
- 4
- Development applications
- 1
Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 10 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct a new detached dwelling with an attached garage.
47 GRENVIEW BLVD S · Nov 19, 2026 · 244 m away - Minor varianceApproved
To convert the existing attached garage into habitable space.
33 GLENELLEN DR W · Oct 8, 2026 · 457 m away - Minor varianceRefused
To construct a new detached dwelling with an attached garage.
3 NORSEMAN ST · Oct 8, 2026 · 334 m away - Minor varianceRefused
To permit a front yard parking pad.
96 PRINCE EDWARD DR S · Sep 24, 2026 · 355 m away - Minor varianceApproved
To construct a two-storey rear addition. A previous Committee of Adjustment application (A0600/22EYK) approved variances related to lot coverage, side yard setback and building length.
18 GREENMOUNT CRT · Jul 30, 2026 · 499 m away
Latest activity nearby
- Minor varianceApproved
To construct a new detached dwelling with an attached garage.
47 GRENVIEW BLVD S · Nov 19, 2026 · 244 m away - Building permit
1 Ground Sign ** ECOLE ELEMENTAIRE CATHOLIQUE ** ** SAINTE-MARGUERITE-D'YOUVILLE **
755 ROYAL YORK RD · Nov 2, 2026 · 207 m away - Building permit
Proposal for interior alterations including remove a load bearing wall.
1 OAKFIELD DR · Sep 17, 2026 · 277 m away - Building permit
Proposal to demolish existing detached garage.
29 OAKFIELD DR · Sep 14, 2026 · 266 m away - Building permit
PROPOSED REAR YARD COVERED DECK (Unit # 1)
26 OAKFIELD DR · Sep 3, 2026 · 223 m away - Building permit
Revision 02: West side wood deck for existing basement entrance to unit #2. REV 01: Revision to stucture and layout.Proposed demolition of existing house. Proposed construction of 2 storey house - duplex.
8 CASTLEBAR RD · Aug 18, 2026 · 258 m away - Zoning review
Closed
47 GRENVIEW BLVD S · Aug 13, 2026 · 244 m away - Zoning review
Closed
755 ROYAL YORK RD · Jul 25, 2026 · 207 m away - Building permit
1 Ground Sign ** ECOLE ELEMENTAIRE CATHOLIQUE ** ** SAINTE-MARGUERITE-D'YOUVILLE **
755 ROYAL YORK RD · Jun 10, 2026 · 207 m away - Building permit
Demolition of existing two-storey secondary school. [Relocation of twenty four (24)portable classrooms by owner and not part of this application.]
721 ROYAL YORK RD · Jan 6, 2026 · 22 m away
Neighbourhood: Stonegate-Queensway
About the area around the lot, not the lot itself.
- Nearest station
- Royal York Station26 min walk
- Nearest TTC stop
- Royal York Rd at Coney Rd North Side2 min walk
- Nearest cycling route
- Royal York RdBike Lane, 2 min walk
- Nearest traffic count
- 5,696 vehicles in 8 hRoyal York Rd / Coney Rd, 140 m away, Aug 17, 2022
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- Berry Road Park2 min walk
- Reid Manor Park2 min walk
- Jeff Healey Park10 min walk
Schools within 1 km
- BISHOP ALLEN ACADEMY English Separate 1 min walk
- ST MARGUERITE D'YOUVILLE CATHOLIC ELEMENTARY SCHOOL French Separate 3 min walk
- ETOBICOKE SCHOOL OF THE ARTS English Public 7 min walk
- KAREN KAIN SCHOOL OF THE ARTS English Public 8 min walk
- PARK LAWN JR MDL SCHOOL English Public 12 min walk
- CASTLEBAR JR SCHOOL English Public 14 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Stonegate-Queensway | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $104,000 | $84,500 |
| Households that own their home | 63% | 54% |
| Population (2021) | 25,650 | 16,813 |
| Homes built in 1960 or before | 55% | 29% |
| Homes needing major repairs | 6% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Stonegate-Queensway | City median |
|---|---|---|
| Assault | 465.6 | 636.3 |
| Robbery | 40.8 | 69.5 |
| Homicide | 3.4 | 5.3 |
| Shootings | 13.6 | 10.5 |
| Auto theft | 193.7 | 192.6 |
| Theft over $5,000 | 68 | 46.1 |
| Break and enter | 217.5 | 172.8 |
| Theft from vehicles | 129.2 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.