HousePrecheckCheck an address

710 Markham RdToronto · zoning, lot size and permit records

IPW 0.8 (x9)≈ 51.1 × 73.1 m3,094 m²on Greenbrae Crctcorner, also on Markham Rd

Not a home

A place of worship

The zoning by-law sets this parcel aside for a place of worship. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A place of worshipParking and traffic around services, often at weekends.
  • Permits or applications open on this parcelStill open in the City's records: 20 116782 (replace concrete landing & steps at front of church, 2020, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N20 m
≈ 51.1 m frontage≈ 73.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2020

    Needs a closer look

    Still open in the City's records: 20 116782 (replace concrete landing & steps at front of church, 2020, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • By-law investigation25 185305 WST 00 IRClosed

    Waste

    Jun 28, 2025 · 710 MARKHAM RD
  • Building permit20 225471Cancelled

    Proposal to construct a handicapped ramp for an existing place of worship.

    Dec 3, 2020 · 710 MARKHAM RD
  • Building permit20 116782Inspection

    replace concrete landing & steps at front of church

    Jun 25, 2020 · 710 MARKHAM RD
  • Building permit09 115466Closed

    Revision to add two (2) towers at either side of the front facade of the building. (Interior alterations; construct podium (86 sq.m) and finish the ceiling (200 sq.m).)

    Nov 9, 2009 · 710 MARKHAM RD
  • Development application09 163837 ESC 38 SAClosed

    Proposed decorative towers attached to east face of existing place of worship.

    Aug 31, 2009 · 710 MARKHAM RD
  • Zoning review06 191971 ZPUClosed
    Nov 17, 2006 · 710 MARKHAM RD
  • Zoning review06 191025 ZPUClosed
    Nov 13, 2006 · 710 MARKHAM RD
  • Building permit01 140861Closed

    INSTALL 7 MAGNETIC HOLD OPEN DEVICES ON EXISTING FIRE RATED DOORS

    May 28, 2001 · 710 MARKHAM RD

Check before you build

  • Site-specific exception 900.34.10(9)

    Needs a closer look

    3 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.34.10(9)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The maximum height of an existing place of worship is the height of the existing building as it existed on the date of the enactment of this By-law

  2. Rule B

    The maximum lot coverage is the percentage of the lot area covered by buildings as they existed on the lot on the date of the enactment of this By-law

  3. Rule C

    The minimum building setback from a lot line is the building setback from each respective lot line to the main wall of the building s on the lot as they existed on the date of the enactment of this By-law.

By-law 569-2013, Chapter 900

Lot facts

Area
3,094 m²
Frontage
51.1 mestimated, irregular lot
Depth
73.1 mestimated, irregular lot
Street
Greenbrae Crct
Corner lot
Yes, also on Markham Rd73.1 m along it
Public lane
None
House footprint
905 m²roof up to 10.6 m
Back yard
12.1 mhouse to rear lot line
Side yards
7.7 m and 10.7 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone IPW 0.8 (x9) (Institutional Place of Worship). Chapter 80, section 80.50 of the by-law. Source
  • 9 City trees in front of this lot. The City's street tree inventory lists 9 trees at this address: linden, littleleaf (96 cm), linden, littleleaf (84 cm), honey locust (57 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Notice Sent

    133 ROCHMAN BLVD · Aug 11, 2026 · 222 m away
  • Building permitsecondary suite

    PROPOSED SECOND DWELLING UNIT

    51 SHARBOT AVE · May 1, 2026 · 261 m away
  • Zoning review

    Cancelled

    20 ABBEVILLE RD · Mar 31, 2026 · 249 m away
  • Zoning review

    Closed

    675 MARKHAM RD · Mar 3, 2026 · 196 m away
  • Zoning review

    Closed

    20 ABBEVILLE RD · Feb 6, 2026 · 249 m away
  • Minor varianceDeferred

    To construct a new three-storey detached dwelling and a two-storey Garden Suite. There will be a total of 5 dwelling units located on the property. The existing one-storey dwelling will be demolished.

    133 ROCHMAN BLVD · Feb 2, 2026 · 222 m away
  • Zoning review

    Closed

    671 MARKHAM RD · Dec 12, 2025 · 215 m away
  • Building permit

    Building permit for a liquor license at the existing restaurant. The building layout will remain unchanged.

    633 MARKHAM RD · Nov 20, 2025 · 297 m away
  • Zoning review

    Closed

    693 MARKHAM RD · Oct 13, 2025 · 143 m away
  • Zoning review

    Closed

    633 MARKHAM RD · Sep 25, 2025 · 297 m away

Neighbourhood: Woburn North

About the area around the lot, not the lot itself.

Nearest station
Guildwood GO Station37 min walk
Nearest TTC stop
Markham Rd at Greenbrae Circt1 min walk
Nearest cycling route
Cedarbrook Park TrlMulti-Use Trail - Entrance, 12 min walk
Nearest traffic count
26,547 vehicles in 14 hMarkham Rd / Greenbrae Crct / Greenholm Crct, 70 m away, Jul 3, 2024
Serious collisions within 500 m
62021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 1 with cyclists
Parks
Greenbrae Parkette5 min walk
Lusted Park5 min walk
Densgrove Park6 min walk

Schools within 1 km

  • AL-QASIM ACADEMY Private 4 min walk
  • AL-MADRASAH AL-INAMIYYAH PRIVATE SCHOOL Private 9 min walk
  • ST BARBARA CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • CEDARBRAE COLLEGIATE INSTITUTE English Public 11 min walk
  • TREDWAY WOODSWORTH PUBLIC SCHOOL English Public 12 min walk
  • CORNELL JR PUBLIC SCHOOL English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWoburn NorthMedian neighbourhood
Median household income (2020)$74,500$84,500
Households that own their home54%54%
Population (2021)26,58016,813
Homes built in 1960 or before23%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWoburn NorthCity median
Assault768.9636.3
Robbery76.569.5
Shootings13.910.5
Auto theft316.6192.6
Theft over $5,00062.646.1
Break and enter180.9172.8
Theft from vehicles281.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.