Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: in a Heritage Conservation District (Part V)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage RegisterBuilding permit open since 2008
Needs a closer lookStill open in the City's records: 08 198499 (HVAC - Interior alterations to existing restaurant greater than 30 seats - Cyrano's, 2008, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 26 150717 (Deferred Fees from folder 25 150717 (RSN-5622903) ZoningProcess RSN 77111777, 2026); 25 150717 (Proposed conversion of existing second and third floor to 11 residential and 3 commerci..., 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications3 Committee of Adjustment files on this lot
Good to know3 approved. A0755/24TEY (To alter the development standards (as approved under Site Specific Zoning By-law 552-2..., 2024); B0039/18TEY (To obtain consent to sever the land for the purpose of lot additions and to create vari..., 2018); B0036/18TEY (To obtain consent to sever the land for the purpose of lot additions and to create vari..., 2018).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)17 development applications open within 300 m
Good to know17 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
23 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 150717Open
Deferred Fees from folder 25 150717 (RSN-5622903) ZoningProcess RSN 77111777
Apr 30, 2026 · 71 KING ST E - Building permit25 150717Under Review
Proposed conversion of existing second and third floor to 11 residential and 3 commercial units for existing four-storey commercial/office building.
Apr 29, 2025 · 71 KING ST E - Minor varianceA0755/24TEYApproved
To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on the second level, and 4 dwelling units and 2 commercial units on the third level) within this mixed-use building.
Dec 11, 2024 · 71 KING ST E - Zoning review24 137747 ZAPApplication On HoldApr 18, 2024 · 71 KING ST E
- Building permit23 129994Closed
Proposal for interior alterations to a base building shell retail unit (3 / G-01D) to be converted into a new premises used for providing botox, lip injections & face filler treatments - 'The Pout Clinic'. This new tenant will be located on the ground floor level / Level 1 of this non-res. building.
Sep 7, 2023 · 89 KING ST E - Building permit23 156164Cancelled
Proposal for interior alterations to base building shell retail unit #1 to be converted into a new premises used for a real estate office tenant - 'Angelo D'Elia'. This new office tenant will be located on the ground floor level / Level 1 of this non-res. building. Scope includes adding new partition walls & suspended ceiling.
Jun 5, 2023 · 71 KING ST E - Building permit23 121755Cancelled
Proposal for construction of demising wall between leasable units.
Mar 9, 2023 · 71 KING ST E - Consent (lot split)B0039/18TEYApproved
To obtain consent to sever the land for the purpose of lot additions and to create various easements/rights-of-way. This application is associated with consent applications B0036/18TEY, B0037/18TEY, B0040/18TEY and B0060/18TEY which collectively facilitate the creation of three stratified parcels for a commercial and office redevelopment scheme.
Sep 20, 2018 · 75 KING ST E
Show 15 older records
- Consent (lot split)B0036/18TEYApproved
To obtain consent to sever the land for the purpose of lot additions and to create various easements/rights-of-way. This application is associated with consent applications B0037/18TEY, B0039/18TEY, B0040/18TEY and B0060/18TEY which collectively facilitate the creation of three stratified parcels for a commercial and office redevelopment scheme.
Sep 20, 2018 · 79 KING ST E - Building permit18 192877Closed
Heritage facade retention and shoring along 71-83 King Street East, refer to permit application 17-279357 BA.
Aug 17, 2018 · 71 KING ST E - Development application17 260753 STE 28 SAClosed
Site Plan Control application for a proposed 18-storey office development with retail uses at-grade, with a total gross floor area of 37,985.76 square metres, which will have frontage on both King Street East and Colborne Street. The proposal includes a new 6 metre wide private lane that will connect to the existing private lane located to the east of the Site. A total of 199 parking spaces will be provided on the Site below grade, and a total of 168 bicycle parking spaces will be provided.
Nov 10, 2017 · 71 KING ST E · City file - Development application15 258720 STE 28 OZClosed
Proposed 18-storey office development with retail uses at-grade, with a total gross floor area of 37,775 square metres including 1,629 square metres of retail space at grade, which will have frontage on both King Street East and Colborne Street. The main pedestrian entrance to the building will be located at the corner of King Street East and Leader Lane. The proposal includes a new 6 metre wide private lane that will connect to the existing private lane located to the east of the Site. A total of 220 parking spaces will be provided on the Site below grade, and a total of 161 bicycle parking spaces will be provided.
Nov 30, 2015 · 75 KING ST E · City file - Building permit13 110337Closed
In conjunction with a comprehensive Signage Master Plan to realize multiple locations for third party wall signs, city-wide, to erect and display one illuminated wall sign on the westerly elevation of the existing designated heritage building. The wall sign is to display static copy and be 5.20 metres wide by 8.50metres long and at a height of 12.80 metres. **Strategic Media Leasing** **Strategic Media Outdoor**
Oct 10, 2013 · 71 KING ST E - Development application12 145905 STE 28 OZClosed
Application update and partial resubmission on September 26, 2016: Rezoning application for 79-91 King St E to permit a 25-storey (77m in height excluding mechanical penthouse) mixed-use building with a 4-storey podium and 3 levels of underground parking. The podium component occupies the entire footprint of the site. Tower floorplate is 625 sq. metres. The proposal includes 169 dwelling units on floors 5-25, a private club (Albany Club) spanning floors 1-4, and ground floor retail.
Mar 29, 2012 · 85 KING ST E - Zoning review12 105805 ZPUClosedJan 13, 2012 · 75 KING ST E
- Building permit11 288005Closed
This is for the interior alterations to the ground floor and basement washroom for a new hair salon on the ground floor. The ground floor will be the hair salon and the basement will be for the washrooms and storage. This is a multi use building.
Oct 20, 2011 · 75 KING ST E - Zoning review11 241451 ZSVClosedJul 19, 2011 · 71 KING ST E
- Building permit08 198499Inspection
HVAC - Interior alterations to existing restaurant greater than 30 seats - Cyrano's
Sep 8, 2008 · 71 KING ST E - Zoning review08 118751 ZPRClosedMar 12, 2008 · 71 KING ST E
- Building permit07 239244Closed
Proposal to reconstruct store front.
Jul 26, 2007 · 75 KING ST E - Building permit04 189524Closed
Interior alterations to Basement, 1st , 2nd and 3rd floors
Dec 6, 2004 · 79 KING ST E - Zoning review83 025704 LTOClosedMar 15, 1983 · 75 KING ST E
- Zoning review82 025939 LTOClosedApr 8, 1982 · 71 KING ST E
Check before you build
Site-specific exception 900.11.10(135)
Needs a closer look19 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On 65, 71, 73, 75, 77, 79, 83, 85 and 89 King Street East and 46 Colborne Street, if the requirements of Section 10 and Schedule A of By-law 552-2019(LPAT) are complied with, the erection or use of a building, structure , addition or enlargement that meets the requirements of
- Rule B
to (S) below is permitted; (B) Despite Regulation 40.10.20.10(1), a dwelling unit is not a permitted use
- Rule C
Despite Regulation 40.10.40.40, the maximum gross floor area is 38,500 square metres
- Rule D
Despite Regulation 40.5.40.10(1), the height of a building or structure is measured as the distance from a Canadian Geodetic Datum elevation of 82.15 metres to the highest point of the building or structure
- Rule E
Despite Regulations 40.10.40.10 and 40.5.40.10(4), the height of the building or structure or portion, including a mechanical penthouse, must not exceed the height in metres specified by the numbers following HT as shown on Diagram 6 of By-law 552-2019(LPAT)
- Rule F
Despite Regulation 40.5.40.10(4) and Despite (E) above: (1) lightning rods may project above the height limits shown as 83.00 metres on Diagram 6; (ii) guardrails, safety railings, elements of a green roof, roofing materials including elements of exterior flooring, parapets may project above the height limits shown on Diagram 6 by no more than 2.0 metres; and (iii) vents, stacks, mechanical elements, heating/cooling towers, stair enclosures, lighting fixtures, elevator overrun and window washing equipment may project above the height limits shown on Diagram 6 by no more than 5.0 metres
- Rule G
Despite Regulations 40.5.40.70 and 40.10.40.70 (1) and 600.10.10(1)(A): (i) the required building setbacks must be provided as shown on Diagram 6 of By-law 552-2019(LPAT); and (ii) with the exception of elements permitted by 9(F) and 9(H) of this by-law, a setback of at least 2.7 metres from the west side lot line adjacent to Leader Lane and a setback of at least 4.0 metres from the north lot line adjacent to King Street East is required within the Lower Setback Zone as illustrated on Diagram 6, for storeys 4 and 5 of the building, excluding the mezzanine level
- Rule H
Despite (G) above: (i) canopies, awnings, building cornices, lighting fixtures, ornamental elements, parapets, trellises, eaves, window sills, guardrails, balustrades, railings, stairs, stair enclosures, wheel chair ramps, vents, underground garage ramps, landscape and green roof elements, wind mitigation, architectural cladding and design features, window washing equipment and public art features may project beyond the building envelope shown in Diagram 6
- Rule I
Despite Regulation 40.5.40.10(5), a mechanical penthouse may occupy the entire Mechanical Penthouse Area as illustrated on Diagram 6
- Rule J
Despite Regulation 40.10.40.10(5), the minimum height of the first storey may be less than 4.5 metres
- Rule K
Despite Regulation 40.10.20.10, the only permitted uses on the ground floor facing King Street East or Colborne Street are retail store, retail service, eating establishment , take-out eating establishment, personal service shop, financial institution, wellness centre, recreation use , art gallery, and automated banking machine, artist studio, massage therapy, day nursery, and office lobby, provided such uses located in the space facing King Street East are divided into a minimum of two units, not including the lobby for the office tower or any such uses within the office lobby
- Rule L
Despite Regulation 40.10.20.100(17), the maximum interior floor area of all retail services may exceed 400 square metres
- Rule M
Despite Regulations 200.5.10.1 and 200.15.10, parking spaces must be provided and maintained below grade in accordance with the following: (i) a minimum of 125 parking spaces ; (ii) a maximum of 211 parking spaces ; and (iii) a minimum of 6 accessible parking spaces
- Rule N
Despite Regulation 230.5.10.1(1), bicycle parking spaces must be provided and maintained on the lands in accordance with the following: (i) a minimum of 85 short-term bicycle parking spaces ; (ii) a minimum of 78 long-term bicycle parking spaces ; and (iii) the required long-term bicycle parking spaces must be located either on the ground floor or on parking level 1 (P1)
- Rule O
Despite Regulation 230.5.1.10(10), "short-term" bicycle parking spaces may also be located in a stacked bicycle parking space
- Rule P
Despite Regulation 200.5.1.10(2), 11 parking spaces may have a minimum width of 2.6 metres when obstructed on one side
- Rule Q
Despite Regulation 40.10.100.10(1), two vehicle accesses are permitted
- Rule R
Despite Regulation 40.10.90.40(3), loading spaces located in a building may have their vehicle access through a main wall that faces a street
- Rule S
Despite Regulation 40.10.40.50(2), a minimum of 159 square metres of outdoor amenity space must be provided
- Older by-law A
Section 12(1) 397 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 132 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 557 m²
- Frontage
- 35.9 mestimated, irregular lot
- Depth
- 18.5 mestimated, irregular lot
- Street
- King St E
- Corner lot
- No
- Public lane
- None
- House footprint
- 169 m²
- Back yard
- 12.9 mhouse to rear lot line
- Side yards
- 0.3 m and 0.3 mhouse to side lot lines
- Buildings on the lot
- 5house, garage, sheds
- Max height
- 23 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Queen. The lot is inside the Queen Major Transit Station Area approved by the Province (Site and Area Specific Policy 605). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: King Street East. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c3.0; r4.0) SS1 (x135) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 91%10 of 11 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 33
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).
20 KING ST W · Jun 17, 2026 · 302 m away - Minor varianceApproved
To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.
89 CHURCH ST · Jan 15, 2025 · 280 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on the second level, and 4 dwelling units and 2 commercial units on the third level) within this mixed-use building.
71 KING ST E · Dec 11, 2024 · 12 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-laws 218-2021 and 219-2021), for a new 34-storey mixed-use building (which is currently under construction), by reducing the minimum number of vehicular parking spaces. There will be a total of 369 residential dwelling units on this lot.
90 QUEEN ST E · Oct 23, 2024 · 462 m away - Minor varianceApproved
To alter the development standards for the 33-storey mixed-use building (approved under Site Specific Zoning By-Law 1195-2022), by converting the required office use space into hotel use space (for 142 hotel suites and related facilities) on floors 1 through 10. The site is subject to a current Site Plan Control Application (File 2017 235087 STE 28 SA).
34 KING ST E · Sep 25, 2024 · 118 m away
Latest activity nearby
- Building permit
Revision #1 to layout changes and hvac changes due to site conditions.Proposal for interior alterations for restaurant use.
1 ADELAIDE ST E · Nov 25, 2026 · 243 m away - Zoning review
Application On Hold
91 FRONT ST E · Nov 24, 2026 · 274 m away - Building permit
Proposal for interior alteration to existing office suites 208, 216, 230 and 306
56 THE ESPLANADE · Nov 23, 2026 · 277 m away - Building permit
Modification of the existing sprinkler system for a new tenant layout (Cubecom) on the 6th floor. Related Permit no. 26 223212 BLD 00 BA
4 KING ST W · Nov 23, 2026 · 260 m away - Building permit
Revision No.1: New Fire Shutter Window
30 ADELAIDE ST E · Nov 20, 2026 · 209 m away - Building permit
Installation of 2 Double (9th Floor) and 3 Double (10th Floor) Electromagnetic locks using a power supply system
1 ADELAIDE ST E · Nov 18, 2026 · 243 m away - Building permit
Proposed interior alterations for washroom and elevator lobby finish upgrades.
4 KING ST W · Nov 18, 2026 · 260 m away - Building permit
Proposed cooling Tower Replacement scope on the roof and mechanical room, along with one heating coil replacement.
33 YONGE ST · Nov 17, 2026 · 248 m away - Building permit
Proposal for additions and interior alterations to existing Nightclub at 17-19 Toronto St.
19 TORONTO ST · Nov 16, 2026 · 124 m away - Building permit
Revision 01 - Revisions to address clarify structural concerns and complete phase 2 of heating system retrofit.----------------------------------------------------------Replacement of existing heating system with Air Source Heat Pumps and a back up condensing boiler. Mechanical room update to renew building pumps.
6 ADELAIDE ST E · Nov 9, 2026 · 263 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- King Station4 min walk
- Nearest TTC stop
- King St East at Church St West Side1 min walk
- Nearest cycling route
- Adelaide St ECycle Track, 3 min walk
- Nearest traffic count
- 6,090 vehicles in 8 hKing St E / Church St, 80 m away, Jun 29, 2023
- Serious collisions within 500 m
- 172021–2026, killed or seriously injured: 2 fatal, 8 with pedestrians, 4 with cyclists
- Parks
- Courthouse Square Park1 min walk
- Toronto Sculpture Garden2 min walk
- Berczy Park2 min walk
Schools within 1 km
- KEYSTONE INTERNATIONAL SCHOOLS Private 2 min walk
- VICTORIA STREET LINC English Public 4 min walk
- DOWNTOWN ALTERNATIVE SCHOOL English Public 7 min walk
- GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 7 min walk
- ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 8 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.