HousePrecheckCheck an address

71 Charles St EToronto · zoning, lot size and permit records

Also 599 Church St, 603 Church St, 605 Church St, 609 Church St, 73 Charles St E and 1 more

Residential · R (d1.0) (x874)30.5 × 55.7 m1,698 m²on Charles St Ecorner, also on Church Stbacks onto Al Sparrow Lane

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 26 166842 (Proposed repairs to the underground parking facility, performing localized concrete rep..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 12 development applications open within 300 m, up to 75 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: Bloor-YongeThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
30.5 m frontage55.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 building permits open, the oldest since 2018

    Needs a closer look

    Still open in the City's records: 22 212061 (Proposed isolated garage roof deck restoration and protection, 2022, status Permit Issued); 19 132745 (Construct interior altertions (138m2) to unit #1601, 2019, status Inspection); 18 131010 (Propose restoration work for swimming pool located on the 2nd and 3rd floor of the exis..., 2018, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 109468 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 166842 (Proposed repairs to the underground parking facility, performing localized concrete rep..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

21 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 166842Permit Issued

    Proposed repairs to the underground parking facility, performing localized concrete repairs to the property parking garage ramp, as well as waterproofing repairs

    Jul 15, 2026 · 71 CHARLES ST E
  • By-law investigation25 109468 PRS 00 IRClosed

    Property Standards

    Jan 27, 2025 · 71 CHARLES ST E
  • Building permit22 212061Permit Issued

    Proposed isolated garage roof deck restoration and protection.

    Oct 27, 2022 · 71 CHARLES ST E
  • Building permit21 112673Closed

    Fire Alarm Panel replacement and modifications to the existing Apartment Building.

    Feb 26, 2021 · 71 CHARLES ST E
  • Building permit19 132745Inspection

    Construct interior altertions (138m2) to unit #1601

    Apr 3, 2019 · 71 CHARLES ST E
  • Building permit19 124004Cancelled

    Proposal for the installation of a barrier free ramp for access to the 4th floor terrace in existing apartment.

    Mar 11, 2019 · 71 CHARLES ST E
  • Zoning review18 227068 LTOClosed
    Sep 18, 2018 · 71 CHARLES ST E
  • Building permit18 162941Closed

    Proposal for interior alterations to existing multi unit building. Unit 1 tenant- Penguin Pick-Up & Penguin Fresh

    May 23, 2018 · 71 CHARLES ST E
Show 13 older records
  • Building permit18 131010Permit Issued

    Propose restoration work for swimming pool located on the 2nd and 3rd floor of the existing building.

    Apr 5, 2018 · 71 CHARLES ST E
  • Zoning review16 208079 ZZUClosed
    Aug 16, 2016 · 599 CHURCH ST
  • Zoning review16 177534 LTOClosed
    Jun 21, 2016 · 71 CHARLES ST E
  • Zoning review16 147119 LTOClosed
    Apr 28, 2016 · 599 CHURCH ST
  • Zoning review10 306638 LTOClosed
    Dec 1, 2010 · 71 CHARLES ST E
  • Building permit10 147925Closed

    Proposal to install 1 backflow prevention device in an existing apartment building with ground floor retail.

    Apr 14, 2010 · 71 CHARLES ST E
  • Building permit10 146880Closed

    permit for interior alterations to existing apartment unit - suite 1402 - please note notice from Georgina in Heritage stating that address is not a heritage property.

    Apr 14, 2010 · 71 CHARLES ST E
  • Building permit09 142331Closed

    Proposal for interior alterations to remove two walls in an existing second floor residential condo unit, suite 204.

    Jun 2, 2009 · 71 CHARLES ST E
  • Building permit06 174018Closed

    repairs to the waterproofing and concrete slab on the garage roof deck and the intermediate slab

    Oct 18, 2006 · 71 CHARLES ST E
  • Zoning review06 123820 LTOClosed
    Apr 6, 2006 · 71 CHARLES ST E
  • Building permit01 162608Closed

    carry out parking garage repairs. site plan to follow.

    Oct 18, 2001 · 71 CHARLES ST E
  • Zoning review86 028310 LTOClosed
    Aug 13, 1986 · 603 CHURCH ST
  • Zoning review82 026296 LTOClosed
    Jul 16, 1982 · 599 CHURCH ST

Check before you build

  • Site-specific exception 900.2.10(874)

    Needs a closer look

    3 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(874)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4)

  2. Rule B

    On a lot , a tourist home is permitted

  3. Rule C

    Any lot used as a tourist home must provide one parking space for the principal dwelling unit on the lot if such parking space existed on the lot either prior to or during the use of the building as a tourist home .

  4. Older by-law A

    Section 12(5)(h) of former City of Toronto By-law 438-86

  5. Older by-law B

    On 71 Charles St. E., 589 Church St., 72 Isabella St., former City of Toronto by-laws 506-77 and 507-77

7 parts for other addresses
  • C On 77 Charles St. E., former City of Toronto by-law 580-89
  • D On the odd numbered addresses of 99-103 Charles St. E., 568 Jarvis St. City of Toronto by-law 577-09
  • E On 561 Church St., former City of Toronto by-laws 26-76 and 28-76
  • F On the odd numbered addresses of 577-585 Church St., the even numbered addresses of 86-96 Gloucester St., 79 Isabella St., former City of Toronto by-law 28-76
  • G On 19 Dundonald St., former City of Toronto by-law 532-83
  • H On 36 Dundonald St., former City of Toronto by-law 363-80
  • I On the even numbered addresses of 90-92 Isabella St., former City of Toronto by-laws 362-78 and 363-78.
By-law 569-2013, Chapter 900

Lot facts

Area
1,698 m²
Frontage
30.5 m
Depth
55.7 m
Street
Charles St E
Corner lot
Yes, also on Church St55.7 m along it
Public lane
Al Sparrow Lane, 62.2 m along it
Max height
30 m
Max lot coverage
—
  • Site and Area Specific Policy 382. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x874) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: honey locust (31 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
81%13 of 16 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
4
Development applications
26

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a complete third storey addition and a rear rooftop terrace. The existing home occupation will be maintained.

    63 ST NICHOLAS ST · Feb 15, 2023 · 404 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey townhouse dwelling by enlarging the front third storey dormer and rear third storey terrace.

    137 COLLIER ST · Aug 31, 2022 · 395 m away
  • Minor varianceApproved

    To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.

    92 ISABELLA ST · Jun 30, 2021 · 105 m away
  • Minor varianceApproved

    To alter the existing three-storey townhouse by constructing side one-storey additions, a rear attached garage with rooftop deck and a side third storey addition.

    10 ST JOSEPH ST · Jan 20, 2021 · 458 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed use building by converting a portion of the basement into a dwelling unit.

    66 GLOUCESTER ST · Oct 8, 2020 · 194 m away

Latest activity nearby

  • Building permit

    Revision 01 - fire alarm upgrade to P1, P2, P3, P4, P5 and first and second floorFire Alarm Upgrade: to add strobes in the required area to address accessibility requirement, the rest existing fire alarm to remain.

    1 MOUNT PLEASANT RD · Nov 18, 2026 · 249 m away
  • Building permit

    Proposal for interior alterations to an existing office space

    121 BLOOR ST E · Nov 10, 2026 · 212 m away
  • Minor varianceRefused

    To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.

    235 BLOOR ST E · Nov 4, 2026 · 251 m away
  • Building permit

    REV 01: Revision to permit to include two risers Proposal to replace heating riser.

    110 CHARLES ST E · Oct 20, 2026 · 157 m away
  • Building permit

    Office new fit out to accommodate new tenant. HVAC to reflect new ceiling.

    175 BLOOR ST E · Oct 15, 2026 · 170 m away
  • Building permit

    Proposed make-up air replacements

    55 BLOOR ST E · Oct 13, 2026 · 284 m away
  • Building permit

    PROPOSED EXTERIOR WALL REPAIRS

    620 CHURCH ST · Oct 5, 2026 · 56 m away
  • Zoning review

    Cancelled

    584 CHURCH ST · Sep 22, 2026 · 250 m away
  • Building permit

    Maglock Installation

    100 HAYDEN ST · Sep 9, 2026 · 151 m away
  • Building permit

    1 ILLUMINATED WALL SIGN ** ST. ANDREWS UNITED CHURCH **

    117 BLOOR ST E · Aug 28, 2026 · 195 m away

Neighbourhood: Church-Wellesley

About the area around the lot, not the lot itself.

Nearest station
Bloor Station7 min walk
Nearest TTC stop
Bloor St East at Church St4 min walk
Nearest cycling route
Bloor St ECycle Track, 4 min walk
Nearest traffic count
13,605 vehicles in 14 hCharles St E / Church St, 40 m away, Sep 9, 2025
Serious collisions within 500 m
112021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 5 with cyclists
Parks
Charles Street Parkette1 min walk
George Hislop Park4 min walk
Norman Jewison Park4 min walk

Schools within 1 km

  • HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 3 min walk
  • THE ABELARD CENTRE FOR EDUCATION Private 4 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 7 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 7 min walk
  • JARVIS COLLEGIATE INSTITUTE English Public 8 min walk
  • NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureChurch-WellesleyMedian neighbourhood
Median household income (2020)$60,400$84,500
Households that own their home24%54%
Population (2021)22,32016,813
Homes built in 1960 or before15%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleChurch-WellesleyCity median
Assault1264.6636.3
Robbery93.269.5
Homicide3.35.3
Auto theft46.6192.6
Theft over $5,000106.546.1
Break and enter146.4172.8
Theft from vehicles206.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.