HousePrecheckCheck an address

707 Yonge StToronto · zoning, lot size and permit records

Also 11 Hayden St, 13 Hayden St, 15 Hayden St, 17 Hayden St, 5 Hayden St and 4 more

Commercial residential · CR 3.0 (c2.0; r3.0) SS1 (x2546)≈ 25.5 × 47.7 m782 m²on Yonge Stcorner, also on Hayden St

Not a home

A commercial or mixed-use building

10 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 22 205973 STE 11 OZ (Zoning By-law Amendment application to permit a 64-storey mixed-use building, containin..., 2022). Larger work can mean noise and trucks next door; read what each one is for.
  • 20 development applications open within 300 m, up to 94 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: Bloor-YongeThe City plans more homes around the station: good for transit, and more building over time.
N20 m
≈ 25.5 m frontage≈ 47.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Building permit open since 2021

    Needs a closer look

    Still open in the City's records: 20 154726 (Restoration of a fire damaged building, (non-structural limited to shell building eleme..., 2021, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 22 205973 STE 11 OZ (Zoning By-law Amendment application to permit a 64-storey mixed-use building, containin..., 2022).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 20 development applications open within 300 m

    Good to know

    20 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 94 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

40 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation25 251695 GRA 00 IVClosed

    Notice Issued Graffiti

    Sep 26, 2025 · 707 YONGE ST
  • By-law investigation25 231617 GRA 00 IRClosed

    Graffiti

    Sep 26, 2025 · 707 YONGE ST
  • Development application22 205973 STE 11 OZAppeal Received

    Zoning By-law Amendment application to permit a 64-storey mixed-use building, containing 514 dwelling units and 1,000 square metres of non-residential gross floor area. The proposal includes heritage conservation on the site.

    Sep 20, 2022 · 707 YONGE ST · City file
  • Zoning review22 131762 ZZUClosed
    Apr 7, 2022 · 7 HAYDEN ST
  • Building permit20 154726Permit Issued

    Restoration of a fire damaged building, (non-structural limited to shell building elements only)

    Mar 19, 2021 · 707 YONGE ST
  • Building permit19 202823Closed

    To erect and display two static illuminated wall signs and one projecting sign. The projecting sign and a wall sign erected on the north and a wall sign erected on the west elevation of the building, all at the first storey.**PIZZAIOLO**

    Aug 22, 2019 · 707 YONGE ST
  • Zoning review19 185742 LPRClosed
    Jul 9, 2019 · 707 YONGE ST
  • Zoning review17 114292 LTOClosed
    Feb 8, 2017 · 703 YONGE ST
Show 32 older records
  • Building permit17 111732Cancelled

    In conjunction with a multi-storey building on the premises, proposal to erect and display one illuminated projecting sign located on the first storey west elevation. The proposed sign contains two sign faces in a back-to-back configuration, each measuring 1.0 metres vertically by 1.0 metres horizontally at a height of 3.95 metres above grade.**H MART**

    Feb 1, 2017 · 703 YONGE ST
  • Building permit16 257794Closed

    To erect and display two illuminated wall signs displaying static copy on the first storey of the easterly elevation, measuring 3.99 m by 0.89 m and 1.96 m by 0.25 m. **HMart**

    Jan 10, 2017 · 707 YONGE ST
  • Building permit16 237569Closed

    In conjunction with a multi-storey building on the premises, proposal to erect and display one illuminated wall sign displaying static copy on the first storey north elevation wall. The proposed sign is 0.9 metres vertically by 9.2 metres horizontally at a height of 3.6 metres above grade.**LIVING**

    Nov 28, 2016 · 707 YONGE ST
  • Building permit16 233124Closed

    interior alteration for new retail store - Home & Home

    Oct 24, 2016 · 707 YONGE ST
  • Building permit16 211300Closed

    Proposal for interior alterations to a real estate office. Tenant is 1170989 ONTARIO LTD.

    Sep 7, 2016 · 703 YONGE ST
  • Zoning review09 140674 LPRClosed
    May 22, 2009 · 707 YONGE ST
  • Zoning review06 183480 ZPUClosed
    Oct 13, 2006 · 707 YONGE ST
  • Building permit02 177981Closed

    Installing magnetic lock on receiving door on ground floor

    Oct 4, 2002 · 707 YONGE ST
  • Building permit02 123599Closed

    Make interior alters to 1st floor existing retail store by removing wall between two units and also altering storefront. Hold for Survey Approval. (Convenience address is 703 Yonge St)

    Apr 23, 2002 · 707 YONGE ST
  • Zoning review00 013191 LTOClosed
    Dec 5, 2000 · 7 HAYDEN ST
  • Zoning review99 022325 LTOClosed
    May 3, 1999 · 7 HAYDEN ST
  • Zoning review98 026061 LTOClosed
    Apr 27, 1998 · 7 HAYDEN ST
  • Building permit97 014645Closed

    MAKE INTERIOR ALTERATOINS TO PORTION OF GROUND FLOOR FOR RETAIL USE

    May 6, 1997 · 703 YONGE ST
  • Zoning review97 025778 LTOClosed
    Jan 9, 1997 · 13 HAYDEN ST
  • Zoning review96 025393 LTOClosed
    Aug 26, 1996 · 13 HAYDEN ST
  • Zoning review96 025104 LTOClosed
    Jun 10, 1996 · 9 HAYDEN ST
  • Zoning review96 024769 LTOClosed
    Apr 1, 1996 · 7 HAYDEN ST
  • Zoning review95 025894 LTOClosed
    Dec 5, 1995 · 7 HAYDEN ST
  • Zoning review95 025181 LTOClosed
    May 29, 1995 · 17 HAYDEN ST
  • Zoning review94 025352 LTOClosed
    Sep 14, 1994 · 7 HAYDEN ST
  • Zoning review94 024889 LTOClosed
    May 5, 1994 · 7 HAYDEN ST
  • Zoning review93 025736 LTOClosed
    Oct 28, 1993 · 703 YONGE ST
  • Zoning review92 026049 LTOClosed
    Oct 8, 1992 · 707 YONGE ST
  • Zoning review92 025746 LTOClosed
    Jul 14, 1992 · 17 HAYDEN ST
  • Zoning review90 028619 LTOClosed
    Jun 29, 1990 · 707 YONGE ST
  • Zoning review89 030178 LTOClosed
    Jul 5, 1989 · 15 HAYDEN ST
  • Zoning review89 030017 LTOClosed
    May 12, 1989 · 5 HAYDEN ST
  • Zoning review88 030034 LTOClosed
    Jan 8, 1988 · 13 HAYDEN ST
  • Zoning review87 030132 LTOClosed
    May 14, 1987 · 17 HAYDEN ST
  • Zoning review84 026470 LTOClosed
    Jun 1, 1984 · 13 HAYDEN ST
  • Zoning review83 025755 LTOClosed
    Mar 28, 1983 · 7 HAYDEN ST
  • Zoning review82 025851 LTOClosed
    Mar 16, 1982 · 707 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(2546)

    Needs a closer look

    4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2546)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(2) 132 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 208 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(2) 260 of former City of Toronto By-law 438-86

  4. Older by-law D

    City of Toronto by-law 466-2005

7 parts for other addresses
  • E On 35 Balmuto St., 764 Yonge St., City of Toronto by-law 466-05
  • F On 75 St. Nicholas St., 692 Yonge St., City of Toronto by-law 103-10
  • G On the lands municipally known as 501-523 Yonge St. in 1981, Section 12 (2) 160 of former City of Toronto By-law 438-86
  • H On 501 Yonge St., being former City of Toronto by-law 511-82
  • I On 555 Yonge St., former City of Toronto by-law 284-68
  • J On 619 Yonge St., former City of Toronto by-law 436-75
  • K On 730 Yonge St., former City of Toronto by-laws 22910 and 223-67.
By-law 569-2013, Chapter 900

Lot facts

Area
782 m²
Frontage
25.5 mestimated, irregular lot
Depth
47.7 mestimated, irregular lot
Street
Yonge St
Corner lot
Yes, also on Hayden St47.7 m along it
Public lane
None
House footprint
704 m²roof up to 15 m
Back yard
2.4 mhouse to rear lot line
Side yards
0 m and 0.2 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
4house, garage, sheds
Max height
18 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Yonge Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 3.0 (c2.0; r3.0) SS1 (x2546) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
96%23 of 24 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
51

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.

    235 BLOOR ST E · Nov 4, 2026 · 462 m away
  • Minor varianceApproved

    To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located at the southern limits of this subject site) will be maintained and unaltered. There will be a total of 329 residential dwelling units on this lot.

    1235 BAY ST · Oct 14, 2026 · 343 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-Law 697-2021(OLT), for a new 50-storey mixed-use building (as approved under Committee of Adjustment Files A0612/23TEY and A0231/25TEY), by increasing the maximum total gross floor area, maximum building height (60.2 m to 61.25 m at the east side portion of the building), altering the minimum building setbacks, and reducing the required bicycle parking spaces. There will be a total of 267 residential dwelling units on this lot.

    874 YONGE ST · Aug 5, 2026 · 383 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1050-2015) for the 68-storey mixed-use building (north-east Tower) by increasing the building height from 215 m to 218.6 m (including the height of the mechanical penthouse). Also, to reduce the total number of commercial parking spaces (managed by the Toronto Parking Authority) from 800 to 795 within Parking Levels 1 to 6 (with five parking spaces located on the south-east portion of Parking Level 6 being converted into car wash bays). The existing 196 residential parking spaces on Parking Levels 3 and 4 will be maintained and unaltered.

    27-29 YORKVILLE AVE · Jul 15, 2026 · 320 m away
  • Minor varianceApproved

    To alter the development standards for the 50-storey residential building (approved under Site Specific Zoning By-Law 697-2021(OLT)), by increasing the permitted gross floor area, and the permitted encroachment of cladding and other similar façade treatments into the required minimum building setbacks.

    874 YONGE ST · May 28, 2025 · 383 m away

Latest activity nearby

  • Zoning review

    Application Acceptable

    12 CUMBERLAND ST · Nov 24, 2026 · 257 m away
  • Zoning review

    Application On Hold

    649 YONGE ST · Nov 23, 2026 · 152 m away
  • Building permit

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies.

    40 ASQUITH AVE · Nov 20, 2026 · 294 m away
  • Building permit

    Proposal for new Sprinklers System on the 3rd floor public corridor.

    60 BLOOR ST W · Nov 19, 2026 · 261 m away
  • Building permit

    Proposed interior alterations to an existing office

    2 BLOOR ST E · Nov 18, 2026 · 158 m away
  • Building permit

    One wall sign.***SIGNATURE HAIR STUDIO***

    665 YONGE ST · Nov 18, 2026 · 103 m away
  • Building permit

    Proposal for interior alterations to an existing office.

    2 BLOOR ST E · Nov 17, 2026 · 158 m away
  • Zoning review

    Not Started

    12 CUMBERLAND ST · Nov 12, 2026 · 257 m away
  • Building permit

    Proposal for interior alterations to an existing office space

    121 BLOOR ST E · Nov 10, 2026 · 215 m away
  • Building permit

    1 Wall Sign*****RUDSAK******

    55 BLOOR ST W · Nov 10, 2026 · 222 m away

Neighbourhood: Church-Wellesley

About the area around the lot, not the lot itself.

Nearest station
Bloor Station3 min walk
Nearest TTC stop
Yonge St at Charles St West1 min walk
Nearest cycling route
Yonge StCycle Track, 1 min walk
Nearest traffic count
6,984 vehicles in 8 hYonge St / Charles St W, 70 m away, Nov 5, 2016
Serious collisions within 500 m
102021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 3 with cyclists
Parks
George Hislop Park1 min walk
St. Mary Street Parkette3 min walk
Norman Jewison Park3 min walk

Schools within 1 km

  • HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 3 min walk
  • THE ABELARD CENTRE FOR EDUCATION Private 7 min walk
  • ROSEDALE DAY SCHOOL Private 8 min walk
  • MCDONALD INTERNATIONAL ACADEMY SCHOOL Private 9 min walk
  • ST JOSEPH'S COLLEGE SCHOOL English Separate 10 min walk
  • CAREER QUEST - TORONTO Private 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureChurch-WellesleyMedian neighbourhood
Median household income (2020)$60,400$84,500
Households that own their home24%54%
Population (2021)22,32016,813
Homes built in 1960 or before15%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleChurch-WellesleyCity median
Assault1264.6636.3
Robbery93.269.5
Homicide3.35.3
Auto theft46.6192.6
Theft over $5,000106.546.1
Break and enter146.4172.8
Theft from vehicles206.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.