HousePrecheckCheck an address

705 King St WToronto · zoning, lot size and permit records

≈ 60.9 × 123.4 m4,053 m²on King St W

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.4 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 26 223617 (Proposal to expand existing generator room on level P1, 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 7 development applications open within 300 m, up to 31 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 60.9 m frontage≈ 123.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 building permits open, the oldest since 2000

    Needs a closer look

    Still open in the City's records: 23 201545 (Fire pump replacement, 2024, status Inspection); 23 182977 (Proposal for cladding repairs including shelf angle replacement in an existing mixed us..., 2023, status Inspection); 14 196391 (Proposal to replace existing fire alarm panel, 2014, status Inspection); and 1 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 223617 (Proposal to expand existing generator room on level P1, 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 7 development applications open within 300 m

    Good to know

    7 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 31 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • 2 short-term rental registrations here

    Good to know

    2 active short-term rental registrations at this address (Condominium).

    What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.

    How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details

    City of Toronto, Short-term Rental Registrations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

16 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 223617Permit Issued

    Proposal to expand existing generator room on level P1.

    Sep 23, 2026 · 705 KING ST W
  • Building permit23 201545Inspection

    Fire pump replacement

    Jan 4, 2024 · 705 KING ST W
  • Zoning review23 211018 LTOClosed
    Oct 5, 2023 · 705 KING ST W
  • Building permit23 182977Inspection

    Proposal for cladding repairs including shelf angle replacement in an existing mixed use building.

    Aug 30, 2023 · 705 KING ST W
  • Zoning review21 220270 LTOClosed
    Oct 1, 2021 · 705 KING ST W
  • Building permit15 199479Closed

    Proposal for structural alterations to the roof deck for new cooling tower replacement in existing multiple unit building.

    Aug 24, 2015 · 705 KING ST W
  • Zoning review15 178865 LTOClosed
    Jun 23, 2015 · 705 KING ST W
  • Zoning review14 262052 LTOClosed
    Dec 9, 2014 · 705 KING ST W
Show 8 older records
  • Building permit14 196391Inspection

    Proposal to replace existing fire alarm panel.

    Aug 8, 2014 · 705 KING ST W
  • Building permit11 104581Closed

    Proposal to install 1 backflow prevention device in an existing residential condo with ground floor retail.

    Jan 13, 2011 · 705 KING ST W
  • Zoning review10 249083 ZPRClosed
    Aug 30, 2010 · 705 KING ST W
  • Building permit10 133866Cancelled

    Proposal for localized repairs to the walls of the ventilation shafts located in the underground parking structure of an existing apartment building with ground floor retail.

    Mar 25, 2010 · 705 KING ST W
  • Building permit07 240352Closed

    Consturcion of 9.29m2 shelter and installation of 2 new antena mounts. Roof of existing mixed use building.

    Jul 18, 2007 · 705 KING ST W
  • Building permit00 171770Inspection

    Install antennas on the roof for telecommunications equipment.

    Oct 20, 2000 · 705 KING ST W
  • Zoning review92 025775 LTOClosed
    Jul 21, 1992 · 705 KING ST W
  • Zoning review85 026702 LTOClosed
    Jun 14, 1985 · 705 KING ST W

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,053 m²
Frontage
60.9 mestimated, irregular lot
Depth
123.4 mestimated, irregular lot
Street
King St W
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    93%26 of 28 decisions
    Garden suite permits
    0
    Laneway suite permits
    1
    Multiplex permits
    5
    Development applications
    21

    Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 28 variance decisions: more than at 60% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceRefused

      To alter the development standards for the mixed-use building (stepping up to 14-storeys (45 m), as approved under Site Specific Zoning By-law 1247-2022 (OLT), by increasing the building height, the number of storeys (stepping up to 17-storeys (54.5 m), the total gross floor area (for residential and non-residential uses), and the total number of residential dwelling units (including a reduction in the proportion of three-bedroom units). Also, to reduce the minimum required outdoor amenity space, the number of required residential and visitor parking spaces, the number of parking spaces equipped with an energized outlet, the number of oversized bicycle parking spaces, and the minimum width of two short-term bicycle parking spaces. The altered mixed-use building will contain commercial uses on the first and second storeys, indoor and outdoor amenity spaces on the second storey, and a total of 162 residential dwelling units.

      485 WELLINGTON ST W · Oct 7, 2026 · 486 m away
    • Minor varianceApproved

      To construct a new one-storey detached ancillary building (one-car garage) in the rear yard, abutting the laneway.

      736 RICHMOND ST W · Apr 15, 2026 · 452 m away
    • Minor varianceApproved

      To construct a new one-storey detached commercial (retail) building with a mezzanine level at the rear portion of the building.

      686 QUEEN ST W · Feb 18, 2026 · 491 m away
    • Minor varianceApproved

      To legalize and maintain the conversion of the row house into a townhouse with two dwelling units, as well as a portion of the rear second storey deck (while removing/reducing a portion of the existing deck depth) which was constructed without an authorized building permit on the existing two-storey dwelling (maintaining the third storey loft). There will be a total of two residential dwelling units on this lot (one unit occupying the first level, and one unit occupying the second level and third level loft area.

      5 STANLEY AVE · Jan 28, 2026 · 357 m away
    • Minor varianceApproved

      To construct a new one-storey ancillary building (to contain a yoga studio), in the rear yard of the existing two-storey townhouse dwelling. This new ancillary building will not be used for habitable space. The existing rear storage shed will be demolished.

      734 ADELAIDE ST W · Nov 12, 2025 · 331 m away

    Latest activity nearby

    • Minor variancePending

      To construct a new three-storey semi-detached dwelling with a front basement walkout, a front porch with stairs, a front third storey covered balcony, and a rear third storey juliette balcony. Also, a rear yard parking pad (abutting the laneway) will be constructed.

      12 WHITAKER AVE · Dec 16, 2026 · 195 m away
    • Minor variancePending

      To permit a self-storage facility (Storage Warehouse, Class A) within the existing 10-storey commercial building by converting portions of the second floor, and the full fourth and sixth floors into a self-storage facility, with a co-working space occupying the remaining portion of the second floor. The remaining portions of the building will continue to be used for commercial and office uses. There will be a total of 125 parking spaces provided (89 within the underground parking garage and 36 in the rear surface level lot).

      720 KING ST W · Dec 9, 2026 · 96 m away
    • Building permit

      Interior alterations - Unit 505

      720 KING ST W · Nov 20, 2026 · 96 m away
    • Building permit

      Proposed alternative solution for standpipe (related to 24 253021 BLD 00 NB)

      2 TECUMSETH ST · Nov 17, 2026 · 290 m away
    • Building permit

      Proposed alternative solution for pool (related to 24 253021 BLD 00 NB)

      2 TECUMSETH ST · Nov 17, 2026 · 290 m away
    • Building permit

      Shoring for soil remediation

      2 TECUMSETH ST · Nov 6, 2026 · 290 m away
    • Building permit

      1 Wall Sign****ORCHARD KITCHEN****

      700 KING ST W · Oct 28, 2026 · 146 m away
    • Building permit

      Installation of 2 maglocks on amenity floors

      701 KING ST W · Oct 26, 2026 · 39 m away
    • Zoning review

      Closed

      689 KING ST W · Oct 23, 2026 · 85 m away
    • Development application

      Proposed 30-storey mixed-use development, comprised of hotel uses on the first 13-storeys, including a restaurant and 251 hotel suites, and residential uses above, between levels 14-30, including a total of 160 purpose-built rental units.

      689 KING ST W · Oct 1, 2026 · 69 m away · City file

    Neighbourhood: West Queen West

    About the area around the lot, not the lot itself.

    Nearest station
    Exhibition GO Station23 min walk
    Nearest TTC stop
    King St West at Tecumseth St1 min walk
    Nearest cycling route
    Tecumseth StCycle Track - Contraflow, 1 min walk
    Nearest traffic count
    6,262 vehicles in 14 hKing St W / Tecumseth St, 90 m away, Jul 23, 2024
    Serious collisions within 500 m
    92021–2026, killed or seriously injured: 0 fatal, 6 with pedestrians, 3 with cyclists
    Parks
    Victoria Memorial Square Park4 min walk
    Adelaide Place Parkette5 min walk
    Stanley Park South - Toronto5 min walk

    Schools within 1 km

    • ST MARY CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
    • NIAGARA STREET JR PUBLIC SCHOOL English Public 5 min walk
    • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 9 min walk
    • DISCOVERING MINDS MONTESSORI SCHOOL Private 10 min walk
    • CHARLES G FRASER JR PUBLIC SCHOOL English Public 12 min walk
    • JEAN LUMB PUBLIC SCHOOL English Public 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureWest Queen WestMedian neighbourhood
    Median household income (2020)$101,000$84,500
    Households that own their home54%54%
    Population (2021)13,17016,813
    Homes built in 1960 or before14%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleWest Queen WestCity median
    Assault588.7636.3
    Robbery51.869.5
    Shootings6.510.5
    Auto theft84.1192.6
    Theft over $5,00019.446.1
    Break and enter258.8172.8
    Theft from vehicles181.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.