HousePrecheckCheck an address

700 Ontario StToronto · zoning, lot size and permit records

Residential · R (d1.0) (x104)105.4 × 60.1 m5,707 m²on Ontario St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 14 storeys, 279 rental units, built 1967More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 16 146625 (Proposal for concrete repairs to the hydro vault on the ground floor, 2016, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 6 development applications open within 300 m, up to 69 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 24 207128 ZON 00 IR (Zoning, 2024, status Rescheduled).
  • City upkeep score: 76 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Castle FrankThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
105.4 m frontage60.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 24 207128 ZON 00 IR (Zoning, 2024, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Building permit open since 2016

    Needs a closer look

    Still open in the City's records: 16 146625 (Proposal for concrete repairs to the hydro vault on the ground floor, 2016, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 7 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards, Zoning): 26 225433 ZON 00 IR (Zoning, 2026); 26 220479 PRS 00 IR (Property Standards, 2026); 26 172169 000 00 IR (Adequate Heat, 2026); and 4 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 69 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • 2 short-term rental registrations here

    Good to know

    2 active short-term rental registrations at this address (Apartment).

    What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.

    How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details

    City of Toronto, Short-term Rental Registrations
  • Rental building evaluation: 76 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (14 storeys, 279 units, built 1967).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

14 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 225433 ZON 00 IRClosed

    Zoning

    Aug 25, 2026 · 700 ONTARIO ST
  • By-law investigation26 220479 PRS 00 IRClosed

    Property Standards

    Aug 16, 2026 · 700 ONTARIO ST
  • By-law investigation26 172169 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 700 ONTARIO ST
  • By-law investigation26 172168 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 700 ONTARIO ST
  • By-law investigation26 153060 PRS 00 IRClosed

    Property Standards

    Apr 30, 2026 · 700 ONTARIO ST
  • By-law investigation26 144952 ZON 00 IRClosed

    Zoning

    Apr 16, 2026 · 700 ONTARIO ST
  • By-law investigation26 140894 PRS 00 IRClosed

    Property Standards

    Apr 9, 2026 · 700 ONTARIO ST
  • By-law investigation24 207128 ZON 00 IRRescheduled

    Zoning

    Sep 3, 2024 · 700 ONTARIO ST
Show 6 older records
  • Building permit16 146625Permit Issued

    Proposal for concrete repairs to the hydro vault on the ground floor

    Aug 25, 2016 · 700 ONTARIO ST
  • Zoning review11 137426 ZPUClosed
    Mar 3, 2011 · 700 ONTARIO ST
  • Building permit09 135941Closed

    Proposal to install 1 backflow prevention device to the existing water line.

    May 26, 2009 · 700 ONTARIO ST
  • Building permit03 201525Closed

    Installation of exterior wall cladding. Existing and proposed: apartment building.

    Jan 29, 2004 · 700 ONTARIO ST
  • Building permit99 107390Cancelled

    install canopy over driveway ramp to parking access

    Nov 3, 1999 · 700 ONTARIO ST
  • Building permit97 012815Closed

    CARRY OUT REMEDIAL WORK REQUIRED TO BE TAKEN IN ORDER TO COMPLY WITH RETROFIT PROVISIONS OF THE FIRECODE. (2 TOWERS) SS

    Feb 17, 1997 · 700 ONTARIO ST

Check before you build

  • Site-specific exception 900.2.10(104)

    Needs a closer look

    3 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(104)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    An apartment building is a permitted building type, if: (i) the floor space index does not exceed 3.5; [TO: 438-86; 12(1) 24] (ii) the building lot coverage does not exceed 50%; (iii) the building setback to the side lot lines is no less than 3.0 metres; (iv) the building setback to the front lot line is no less than 6.0 metres; and (v) parking for an apartment building must be provided at a minimum rate of 1 parking space for each two dwelling units ; and [TO: 438-86; 12(1) 25]

  2. Rule B

    The requirements of (A), above, do not apply on or between the odd numbered addresses of 545-565 Sherbourne St.

  3. Rule C

    The lands must comply with exception 900.2.10(4).

  4. Older by-law A

    Section 12(1) 434 of former City of Toronto By-law 438-86

1 part for other addresses
  • B On 555 Sherbourne St., former City of Toronto by-laws 258-71, 693-80, 258-85, 94-0612, and 94-0727 and City of Toronto by-law 1044-06.
By-law 569-2013, Chapter 900

Lot facts

Area
5,707 m²
Frontage
105.4 m
Depth
60.1 m
Street
Ontario St
Corner lot
No
Public lane
None
House footprint
1,318 m²roof up to 46.9 m
Back yard
7.7 mhouse to rear lot line
Side yards
6.7 m and 34.9 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Castle Frank. The lot is inside the Castle Frank Major Transit Station Area approved by the Province (Site and Area Specific Policy 649). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x104) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
100%9 of 9 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
2
Development applications
15

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new three-storey office building with a third storey roof terrace.

    555 BLOOR ST E · Aug 30, 2023 · 222 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey townhouse by constructing a rear third storey addition (dormer) with a rear third storey deck.

    18 LAURIER AVE · Nov 17, 2021 · 424 m away
  • Minor varianceApproved

    To alter the existing three-storey detached dwelling by constructing a rear one storey addition, a rear two-storey addition, a rear ground floor terrace, a rear second storey terrace, and a front second storey terrace.

    44 GLEN RD · Nov 3, 2021 · 474 m away
  • Minor varianceApproved

    To convert a semi-enclosed storage area on the ground floor of the existing apartment building to a commercial kitchen.

    50 EARL ST · Sep 15, 2021 · 212 m away
  • Minor varianceApproved

    To construct new rear exterior stairs and add the use "Rooming House".

    600 PARLIAMENT ST · Jul 22, 2021 · 330 m away

Latest activity nearby

  • Building permit

    Fire Damage in a High-rise Residential Building: Removing and replacing all damaged interior finishes and partition walls, balcony windows and doors, and balcony railings in the affected unit. If further investigation confirms damage to the concrete balcony slab, it will be repaired or replaced.

    666 ONTARIO ST · Nov 25, 2026 · 64 m away
  • Building permit

    Proposal for interior alteration to fit the nails salon

    4 HOWARD ST · Oct 30, 2026 · 241 m away
  • Building permit

    Replacement of existing fire damaged balcony railings and repair of existing balconies for unit 2307 & 2407.

    375 BLEECKER ST · Oct 30, 2026 · 117 m away
  • Zoning review

    Closed

    100 HOWARD ST · Oct 29, 2026 · 217 m away
  • Building permit

    Interior alterations for a new nail salon in unit 4

    6 HOWARD ST · Oct 27, 2026 · 240 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    37 LINDEN ST · Oct 9, 2026 · 231 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units

    29 LINDEN ST · Oct 9, 2026 · 257 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    574 SHERBOURNE ST · Oct 9, 2026 · 225 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    572 SHERBOURNE ST · Oct 9, 2026 · 223 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    570 SHERBOURNE ST · Oct 9, 2026 · 218 m away

Neighbourhood: North St.James Town

About the area around the lot, not the lot itself.

Nearest station
Sherbourne Station5 min walk
Nearest TTC stop
Sherbourne St at Earl St North Side3 min walk
Nearest cycling route
Sherbourne StCycle Track, 3 min walk
Nearest traffic count
1,965 vehicles in 8 hHoward St / Ontario St, 150 m away, May 7, 2015
Serious collisions within 500 m
72021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 3 with cyclists
Parks
St. James Town West Park2 min walk
Dr. Gordon Chong Park3 min walk
Rosedale Ravine Lands4 min walk

Schools within 1 km

  • ROSE AVENUE JR PUBLIC SCHOOL English Public 1 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 4 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 5 min walk
  • OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • WINCHESTER JR & SR PUBLIC SCHOOL English Public 8 min walk
  • JARVIS COLLEGIATE INSTITUTE English Public 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNorth St.James TownMedian neighbourhood
Median household income (2020)$59,200$84,500
Households that own their home11%54%
Population (2021)18,53516,813
Homes built in 1960 or before19%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNorth St.James TownCity median
Assault1281.6636.3
Robbery76.969.5
Shootings4.310.5
Auto theft85.4192.6
Theft over $5,00038.446.1
Break and enter153.8172.8
Theft from vehicles136.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.