HousePrecheckCheck an address

700 Markham RdToronto · zoning, lot size and permit records

Commercial residential · CR 0.5 (c0.5; r0.0) SS3 (x424)48.8 × 101.7 m4,230 m²on Markham Rdcorner, also on Greenbrae Crct

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 22 116432 (Proposal to construct an accessory building for use as an enclosed garbage room, yard s..., 2022, status Permit Issued); 20 100799 (Proposal for the replacement of the fire alarm control panel, 2020, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 4 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
N20 m
48.8 m frontage101.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2020

    Needs a closer look

    Still open in the City's records: 22 116432 (Proposal to construct an accessory building for use as an enclosed garbage room, yard s..., 2022, status Permit Issued); 20 100799 (Proposal for the replacement of the fire alarm control panel, 2020, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 3 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0204/20SC (To permit the construction of a new enclosed area for the storage of refuse and recycli..., 2021); A164/07SC (The owner proposes to expand the existing medical centre in the one-storey commercial b..., 2007); B094/05SC (The applicant is proposing to sever the property at 700 Markham Road as shown on the at..., 2005).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

21 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review25 154679 ZAPApplication On Hold
    May 6, 2025 · 700 MARKHAM RD
  • Zoning review25 129167 ZSVClosed
    Mar 14, 2025 · 700 MARKHAM RD
  • Building permit22 116432Permit Issued

    Proposal to construct an accessory building for use as an enclosed garbage room, yard storage, and emergency power generator room, updage facade on north & east elevations

    Mar 24, 2022 · 700 MARKHAM RD
  • Minor varianceA0204/20SCApproved

    To permit the construction of a new enclosed area for the storage of refuse and recycling material and yard equipment. NOTE: This application was deferred on October 14, 2020 in order for the applicant to address Ontario Building Code requirements.

    Jul 22, 2021 · 700 MARKHAM RD
  • Building permit20 100799Permit Issued

    Proposal for the replacement of the fire alarm control panel.

    Jan 30, 2020 · 700 MARKHAM RD
  • Zoning review19 208580 ZZCClosed
    Aug 20, 2019 · 700 MARKHAM RD
  • Building permit14 129678Closed

    Proposed renovations (167.2m2) to unit 3-4 for a proposed Medical Clinic.

    Apr 16, 2014 · 700 MARKHAM RD
  • Zoning review14 105379 ZPRClosed
    Jan 16, 2014 · 700 MARKHAM RD
Show 13 older records
  • Building permit13 135702Closed

    install two RP backflow preventors, 1 1/2" diameter c/w expansion tank

    Apr 10, 2013 · 700 MARKHAM RD
  • Zoning review12 275017 ZPRClosed
    Nov 7, 2012 · 700 MARKHAM RD
  • Building permit10 228102Closed

    Interior alterations for a new doctor's office

    Aug 10, 2010 · 700 MARKHAM RD
  • Zoning review09 125854 LTOClosed
    Apr 14, 2009 · 700 MARKHAM RD
  • Building permit08 113467Closed

    INTERIOR RENOVATION TO MEDICAL OFFICE HVAC AND PLUMBING

    Mar 7, 2008 · 700 MARKHAM RD
  • Building permit08 108982Closed

    interior alterations "animal hospital"

    Mar 6, 2008 · 700 MARKHAM RD
  • Building permit07 261055Closed

    HVAC - interior alterations to a medical office

    Oct 12, 2007 · 700 MARKHAM RD
  • Minor varianceA164/07SCPending

    The owner proposes to expand the existing medical centre in the one-storey commercial building by constructing a second storey addition.

    Jun 27, 2007 · 700 MARKHAM RD
  • Building permit06 169077Closed

    interior alteration to create medical office revisions to interior layout.

    Oct 5, 2006 · 700 MARKHAM RD
  • Consent (lot split)B094/05SCApproved

    The applicant is proposing to sever the property at 700 Markham Road as shown on the attached lot division plan. Also proposed is an easement for Right-of-Way to access the property to the west (the parcel to be conveyed). There is no proposed development for the parcel to be conveyed. The existing commercial building on the retained parcel will remain.

    Dec 14, 2005 · 700 MARKHAM RD
  • Building permit05 168385Closed

    interior alterations to change the existing unit to a dental office

    Sep 14, 2005 · 700 MARKHAM RD
  • Building permit03 197153Closed

    INTERIOR ALTERATIONS TO UNITS 3 & 4

    Dec 22, 2003 · 700 MARKHAM RD
  • Zoning review03 198320 LTOClosed
    Dec 4, 2003 · 700 MARKHAM RD

Check before you build

  • Site-specific exception 900.11.10(424)

    Needs a closer look

    4 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(424)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from a lot line that abuts a street is 3.0 metres

  2. Rule B

    A place of worship is permitted

  3. Rule C

    Parking space must be provided at a minimum rate of (i) 10 parking spaces for each 100 square metres of interior floor area used for eating establishment , recreational use and place of entertainment; and (ii) 2.6 parking spaces for each 100 square metres of interior floor area used for all other uses

  4. Rule D

    If the total gross floor area of all uses exceeds 1356 square metres, then the gross floor area of all uses other than offices must not exceed 75% of the total built gross floor area .

By-law 569-2013, Chapter 900

Lot facts

Area
4,230 m²
Frontage
48.8 m
Depth
101.7 m
Street
Markham Rd
Corner lot
Yes, also on Greenbrae Crct101.7 m along it
Public lane
None
House footprint
1,445 m²roof up to 6.7 m
Back yard
26.2 mhouse to rear lot line
Side yards
1.5 m and 15.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
11 m
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone CR 0.5 (c0.5; r0.0) SS3 (x424) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
6

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Interior alteration to combine existing retail units into a supermarket, including construction of a new 199m² mezzanine and associated structural modifications.

    3434 LAWRENCE AVE E · Oct 22, 2026 · 224 m away
  • Building permit

    Application for a permit to erect and display one first party two wall signs, illuminated, displaying static copy and erected at the second storey. Dimensions:Wall sign 1:1.12m L x5.54m WX 0.14m D at a height of 8.44m, on the south elevation.Wall sign 1:1.12m L x5.54m WX 0.14m D at a height of 8.44m, on the East elevation***ANGARA INDIAN & HAKKA CUISINE***

    3478 LAWRENCE AVE E · Sep 9, 2026 · 228 m away
  • Zoning review

    Cancelled

    133 ROCHMAN BLVD · Aug 11, 2026 · 276 m away
  • Zoning review

    Notice Sent

    133 ROCHMAN BLVD · Aug 11, 2026 · 276 m away
  • Zoning review

    Closed

    3434 LAWRENCE AVE E · Jul 16, 2026 · 224 m away
  • Building permit

    Proposal for interior alterations to lower level.

    629 MARKHAM RD · Jun 30, 2026 · 265 m away
  • Zoning review

    Cancelled

    20 ABBEVILLE RD · Mar 31, 2026 · 255 m away
  • Development application

    ZBA for Lifting the Hold to permit a development containing two L-shaped buildingswith heights ranging from 10-23 storeys, as well as a new public park and a new publicroad.

    3434 LAWRENCE AVE E · Mar 26, 2026 · 259 m away
  • Zoning review

    Closed

    675 MARKHAM RD · Mar 3, 2026 · 177 m away
  • Development application

    Official Plan Amendment to amend the Official Plan, as amended by OPA 778, to facilitate the proposed development for two towers of 34 and 35 storeys, providing retail and medical office uses at-grade/ 2nd storey and residential above. The proposed development provides a total GFA of 61,583 square metres, 2,540 square metres of which is non-residential GFA, and a Floor Space Index (FSI) of 8.69. The proposal provides 661 residential units.The application is associated with Zoning By-law Amendment Application (25 126138 ESC 24 OZ).

    3583 LAWRENCE AVE E · Feb 24, 2026 · 285 m away · City file

Neighbourhood: Woburn North

About the area around the lot, not the lot itself.

Nearest station
Guildwood GO Station37 min walk
Nearest TTC stop
Markham Rd at Greenholm Circt1 min walk
Nearest cycling route
Cedarbrook Park TrlMulti-Use Trail - Entrance, 11 min walk
Nearest traffic count
26,547 vehicles in 14 hMarkham Rd / Greenbrae Crct / Greenholm Crct, 70 m away, Jul 3, 2024
Serious collisions within 500 m
62021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 1 with cyclists
Parks
Greenbrae Parkette4 min walk
Lusted Park5 min walk
Densgrove Park8 min walk

Schools within 1 km

  • AL-QASIM ACADEMY Private 3 min walk
  • AL-MADRASAH AL-INAMIYYAH PRIVATE SCHOOL Private 9 min walk
  • CEDARBRAE COLLEGIATE INSTITUTE English Public 10 min walk
  • ST BARBARA CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • CORNELL JR PUBLIC SCHOOL English Public 12 min walk
  • TREDWAY WOODSWORTH PUBLIC SCHOOL English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWoburn NorthMedian neighbourhood
Median household income (2020)$74,500$84,500
Households that own their home54%54%
Population (2021)26,58016,813
Homes built in 1960 or before23%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWoburn NorthCity median
Assault768.9636.3
Robbery76.569.5
Shootings13.910.5
Auto theft316.6192.6
Theft over $5,00062.646.1
Break and enter180.9172.8
Theft from vehicles281.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.