Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
4 Committee of Adjustment files on this lot
Good to know3 approved. B0041/25EYK (To obtain consent to a lease for a term in excess of 21 years, 2025); B0047/20EYK (Section 57(1) of The Planning Act allows the assignment of authority to the Secretary-T..., 2021); B68/07EYK (To create various easements/rights-of-way, 2007); and 1 more.
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
17 records on file: more than at 100% of Toronto houses (median 0).
- Consent (lot split)B0041/25EYKPending
To obtain consent to a lease for a term in excess of 21 years.
Aug 25, 2025 · 700 CLAYSON RD - Building permit24 240649Closed
First party ground sign **see related variance approval 24-193454**
Nov 22, 2024 · 700 CLAYSON RD - Zoning review24 193454 ZSVClosedAug 6, 2024 · 700 CLAYSON RD
- Zoning review24 163503 ZPRClosedJun 12, 2024 · 700 CLAYSON RD
- Building permit24 155331Cancelled
1 ground sign**IRVING Shipping & Receiving****TTC Distribution Centre****Riverside Natural Foods Ltd Shipping & Receiving**
May 28, 2024 · 700 CLAYSON RD - Zoning review23 160759 ZPRClosedJun 14, 2023 · 700 CLAYSON RD
- Consent (lot split)B0047/20EYKApproved
Section 57(1) of The Planning Act allows the assignment of authority to the Secretary-Treasurer, Committee of Adjustment or his/her designate to approve a Validation of Title.
Jan 12, 2021 · 700 CLAYSON RD - Zoning review20 224485 ZZCClosedDec 1, 2020 · 700 CLAYSON RD
Show 9 older records
- Building permit19 240962Closed
Proposed structural repair to columns that are damaged
Nov 26, 2019 · 700 CLAYSON RD - Building permit16 245101Closed
Removal of existing precast panels for the installation of three overhead doors. The precast panels were designed to allow the exsiting precast wall panels to receive future overhead doors.
Nov 8, 2016 · 700 CLAYSON RD - Building permit16 213245Closed
To Erect and display two illuminated wall signs displaying static copy on the ____ storey of the easterly elevation, each measuring 4.62 m by 2.95 m at a height of 11.30 m. ** IG investment Management**
Sep 16, 2016 · 700 CLAYSON RD - Building permit13 104140Closed
To install 1 Backflow Prevention Device to a ground floor of an existing industrial building, by the water meter room area.
Feb 11, 2013 · 700 CLAYSON RD - Consent (lot split)B68/07EYKApproved
To create various easements/rights-of-way.
Jul 26, 2007 · 700 CLAYSON RD - Building permit06 138011Closed
Part Permit - Foundation - Construct a new industrial building to facilitate a warehouse, shipping and logistics operation at a site located on the west side of Claydon and Bartor Road
Jul 21, 2006 · 700 CLAYSON RD - Consent (lot split)B23/05EYKApproved
To obtain consent to sever the land into two industrial lots.
Mar 17, 2005 · 700 CLAYSON RD - Zoning review05 101472 ZPRClosedJan 11, 2005 · 700 CLAYSON RD
- Zoning review05 101466 ZPRClosedJan 11, 2005 · 700 CLAYSON RD
Lot facts
- Area
- 67,802 m²
- Frontage
- 281 mestimated, irregular lot
- Depth
- 408.4 mestimated, irregular lot
- Street
- Bartor Rd
- Corner lot
- Yes, also on Clayson Rd408.4 m along it
- Public lane
- None
- House footprint
- 36,812 m²
- Back yard
- 71.9 mhouse to rear lot line
- Side yards
- 0 m and 36.4 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
Around this lot
- Minor variances approved
- 100%1 of 1 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 2
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct a two-storey addition along the south side of the existing dwelling.
300 BARTOR RD · Jul 14, 2022 · 191 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to a lease for a term in excess of 21 years.
700 CLAYSON RD · Aug 25, 2025 · 68 m away - Building permit
Proposal for interior alterations to an exisitng shell space for new data centre "Server Farm"
300 BARTOR RD · Feb 24, 2025 · 191 m away - Building permit
The Project is to fit out an exisitng shell space, to be data centre.
300 BARTOR RD · Dec 24, 2024 · 191 m away - Building permit
First party ground sign **see related variance approval 24-193454**
700 CLAYSON RD · Nov 22, 2024 · 68 m away - Building permit
Proposal to repair the vehicle impacted wall of a detached garage
87 ISAAC DEVINS BLVD · Oct 21, 2024 · 185 m away - Building permit
REVISION 01: Windows Changed and room use changed.[SECOND UNIT WITHIN BASEMENT WITH NEW SIDE DOOR ENTRANCE AND 2 SIDE WINDOWS]
25 ISAAC DEVINS BLVD · Sep 17, 2024 · 294 m away - Zoning review
Closed
700 CLAYSON RD · Aug 6, 2024 · 68 m away - Building permit
Proposal to install a new drinking fountain in an existing park.
55 ISAAC DEVINS BLVD · Jul 11, 2024 · 218 m away - Zoning review
Closed
700 CLAYSON RD · Jun 12, 2024 · 68 m away - Building permit
1 ground sign**IRVING Shipping & Receiving****TTC Distribution Centre****Riverside Natural Foods Ltd Shipping & Receiving**
700 CLAYSON RD · May 28, 2024 · 68 m away
Neighbourhood: Oakdale-Beverley Heights
About the area around the lot, not the lot itself.
- Nearest station
- Signet Arrow Station44 min walk
- Nearest TTC stop
- Clayson Rd at Bartor Rd (North) West Side5 min walk
- Nearest cycling route
- Humber River Recreational TrlMulti-Use Trail - Entrance, 10 min walk
- Nearest traffic count
- 2,608 vehicles in 8 hClayson Rd / Bartor Rd (North), 340 m away, Sep 26, 2013
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- Isaac Devins Park3 min walk
- Joseph Bannon Park8 min walk
- West Humber Parkland10 min walk
Schools within 1 km
- ST BASIL THE GREAT COLLEGE SCHOOL English Separate 6 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Oakdale-Beverley Heights | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $71,500 | $84,500 |
| Households that own their home | 43% | 54% |
| Population (2021) | 21,420 | 16,813 |
| Homes built in 1960 or before | 33% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Oakdale-Beverley Heights | City median |
|---|---|---|
| Assault | 1162.2 | 636.3 |
| Robbery | 159 | 69.5 |
| Homicide | 4.1 | 5.3 |
| Shootings | 16.3 | 10.5 |
| Auto theft | 452.7 | 192.6 |
| Theft over $5,000 | 77.5 | 46.1 |
| Break and enter | 155 | 172.8 |
| Theft from vehicles | 273.2 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.