HousePrecheckCheck an address

70 Ruddington DrToronto · zoning, lot size and permit records

Residential apartment commercial · RAC (f30.0; a1375; d1.5)62.7 × 82.4 m5,146 m²on Cummer Avecorner, also on Ruddington Dr

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 18 storeys, 107 rental units, built 1986More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 16 224740 (Replacement of the fire alarm panel and annunciator only on basement and main floors, 2016, status Permit Issued); 08 206167 (New Panel Antennas and Roof top telecommunication facility, 2008, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
  • City upkeep score: 95 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
62.7 m frontage82.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2008

    Needs a closer look

    Still open in the City's records: 16 224740 (Replacement of the fire alarm panel and annunciator only on basement and main floors, 2016, status Permit Issued); 08 206167 (New Panel Antennas and Roof top telecommunication facility, 2008, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 234538 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 95 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (18 storeys, 107 units, built 1986).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • By-law investigation25 234538 PRS 00 IRClosed

    Property Standards

    Oct 2, 2025 · 70 RUDDINGTON DR
  • Building permit21 178620Closed

    Proposal to install 3 Sprinkler Heads in Lobby.

    Aug 4, 2021 · 70 RUDDINGTON DR
  • Building permit16 224740Permit Issued

    Replacement of the fire alarm panel and annunciator only on basement and main floors

    Oct 6, 2016 · 70 RUDDINGTON DR
  • Building permit14 242034Closed

    Install 3" backflow preventer

    Oct 28, 2014 · 70 RUDDINGTON DR
  • Building permit08 206167Inspection

    New Panel Antennas and Roof top telecommunication facility.

    Oct 22, 2008 · 70 RUDDINGTON DR

Lot facts

Area
5,146 m²
Frontage
62.7 m
Depth
82.4 m
Street
Cummer Ave
Corner lot
Yes, also on Ruddington Dr82.4 m along it
Public lane
None
House footprint
794 m²roof up to 59.4 m
Back yard
30.2 mhouse to rear lot line
Side yards
5.9 m and 26 mhouse to side lot lines
Buildings on the lot
4house, garage, sheds
Max height
—
Max lot coverage
35%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Minimum frontage 30 m. Frontage is about 62.7 m: meets the zone minimum. Source
  • Minimum lot area 1375 m². Lot area is 5,146 m²: meets the minimum. Source
  • Zone RAC (f30.0; a1375; d1.5) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: lilac, japanese (17 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
1

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal for rooftop solar collectors

    23 ARGONNE CRES · Nov 23, 2026 · 212 m away
  • Building permit

    Proposed supply and install (4) Replacement like for like HVAC roof top units

    3253-3337 BAYVIEW AVE · Aug 11, 2026 · 243 m away
  • Zoning review

    Closed

    3351 BAYVIEW AVE · Mar 26, 2026 · 192 m away
  • Minor varianceApproved

    To permit a loading space in a rear yard of the property. Related Site Plan Control Application No. 25 120045 NNY 17 SA.

    3351 BAYVIEW AVE · Mar 26, 2026 · 192 m away
  • Building permit

    Proposal for a below grade entrance on the rear yard

    16 WYVERN RD · Jun 27, 2025 · 245 m away
  • Development application

    Site Plan Control Application proposes the redevelopment of the existing Petro Canada gasstation. The proposed development includes the construction of a new gas station with an integrated convenience store, a quick service restaurant, outdoor patio seating, pedestrian sidewalk connections linking the site to the street, and comprehensive landscaping throughout the property.

    3351 BAYVIEW AVE · Feb 21, 2025 · 207 m away · City file
  • Zoning review

    Closed

    3253-3337 BAYVIEW AVE · Dec 19, 2024 · 243 m away
  • Building permitdemolition

    Demolish the existing two storey dwelling.

    34 ARGONNE CRES · Aug 14, 2024 · 292 m away
  • Building permitnew building, new house

    Two storey dwelling with attached garage, rear deck and balcony

    34 ARGONNE CRES · Aug 14, 2024 · 292 m away
  • Building permitsecondary suite

    Add a second unit in the basement, and add a below grade separate entrance in the rear yard, interior alterations to the basement, ground floor and second floor

    2 CENTURION CRT · Jun 4, 2024 · 199 m away

Neighbourhood: Bayview Woods-Steeles

About the area around the lot, not the lot itself.

Nearest station
Old Cummer GO Station28 min walk
Nearest TTC stop
Cummer Ave at Ruddington Dr1 min walk
Nearest cycling route
Finch Corridor TrlMulti-Use Trail, 5 min walk
Nearest traffic count
5,331 vehicles in 8 hCummer Ave / Ruddington Dr, 60 m away, Nov 28, 2023
Serious collisions within 500 m
22021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
Parks
Ruddington Park1 min walk
Bowan Court Parkette6 min walk
Bayview Arena Park8 min walk

Schools within 1 km

  • DORA EDUCATION CENTRE Private 3 min walk
  • LESTER B PEARSON ELEMENTARY SCHOOL English Public 4 min walk
  • ST JOSEPH'S MORROW PARK CATHOLIC SECONDARY SCHOOL English Separate 5 min walk
  • ST ANNE CATHOLIC ACADEMY, SCHOOL OF VIRTUAL LEARNING English Separate 5 min walk
  • TYNDALE UNIVERSITY COLLEGE AND SEMINARY SCHOOL - BAYVIEW Private 8 min walk
  • BLESSED TRINITY CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBayview Woods-SteelesMedian neighbourhood
Median household income (2020)$93,000$84,500
Households that own their home56%54%
Population (2021)12,08516,813
Homes built in 1960 or before12%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBayview Woods-SteelesCity median
Assault285.9636.3
Robbery57.269.5
Homicide7.15.3
Auto theft142.9192.6
Theft over $5,00035.746.1
Break and enter228.7172.8
Theft from vehicles200.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.