Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (29% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (22% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 6582 building permits open, the oldest since 2010
Needs a closer lookStill open in the City's records: 23 103023 (Proposal to construct interior alterations due to water damage, 2023, status Permit Issued); 09 175784 (Revision: Add 3 backflow preventors, 2010, status Revision Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (84% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 91 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 16 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
6 records on file: more than at 95% of Toronto houses (median 0).
- By-law investigation26 147904 WST 00 IVClosed
Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to garbage, litter, papaer, plastic.
Apr 18, 2026 · 70 HUMBERLINE DR - By-law investigation26 146289 WST 00 IRClosed
Waste
Apr 18, 2026 · 70 HUMBERLINE DR - Building permit23 103023Permit Issued
Proposal to construct interior alterations due to water damage.
Mar 7, 2023 · 70 HUMBERLINE DR - Building permit09 175784Revision Issued
Revision: Add 3 backflow preventors
Apr 26, 2010 · 70 HUMBERLINE DR - Building permit01 120301Closed
Mag locks to *Leisureworld* long term care facility. Refer: 99-108140
May 30, 2001 · 70 HUMBERLINE DR - Building permit99 108140Closed
3 Storey care facility with partial basement & surface parking. Plumbing & HVAC included
Apr 26, 2000 · 70 HUMBERLINE DR
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 8,092 m²
- Frontage
- 101.1 mestimated, irregular lot
- Depth
- 94.3 mestimated, irregular lot
- Street
- Humberline Dr
- Corner lot
- No
- Public lane
- None
- House footprint
- 2,570 m²roof up to 15.8 m
- Back yard
- 24.6 mhouse to rear lot line
- Side yards
- 8.5 m and 21.4 mhouse to side lot lines
- Buildings on the lot
- 5house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: pear chanticleer (10 cm), pear chanticleer (10 cm), pear chanticleer (10 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 1
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 1
Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct a basement entrance through the garage, which will result in reduced garage dimensions.
6 COLLANUS CRT · May 4, 2017 · 404 m away - Minor varianceApproved
To construct a second storey addition above the existing garage.
4 BANKVIEW CRCL · Sep 29, 2016 · 301 m away - Minor varianceApproved
To create a secondary suite in the basement.
44 HOLYOAKE CRES · May 12, 2016 · 385 m away - Minor varianceRefused
To create a second suite in the basement through interior alterations.
65 HOLYOAKE CRES · Mar 10, 2016 · 390 m away - Minor varianceApproved
To legalize and to maintain a rear sunroom and a rear basement walk-out that is currently under construction.
72 BANKVIEW CRCL · Dec 11, 2014 · 307 m away
Latest activity nearby
- Building permit
localized concrete and waterproofing repairs to the underground parking garage
20 HUMBERLINE DR · Nov 3, 2026 · 282 m away - Zoning review
Cancelled
5 BANKVIEW CRCL · Jul 24, 2026 · 247 m away - Zoning review
Closed
20 HUMBERLINE DR · Sep 23, 2025 · 282 m away - Development application
Proposal to permit the redevelopment of the underutilized eastern portion of the subject site with a 16-storey rental apartment building with a total of 164 units.
30 HUMBERLINE DR · Jul 21, 2025 · 202 m away · City file - Building permit
PROPOSED CONSTRUCTION OF NEW 1-STOREY GARDEN SUITE
60 WOODLOT CRES · Dec 11, 2024 · 215 m away - Building permit
Proposed multiple projects to convert existing single family dwelling into two-unit dwelling and construct new below grade staircase from the garage.
69 WOODLOT CRES · Nov 5, 2024 · 242 m away - Building permit
Proposed multiple projects to convert existing single family dwelling into two-unit dwelling and construct new below grade staircase from the garage.
69 WOODLOT CRES · Oct 15, 2024 · 242 m away - Zoning review
Application On Hold
60 WOODLOT CRES · Oct 8, 2024 · 215 m away - Building permit
Temporary tent is going to be put up for the duration of 1 week (July 21, 2024 - July 28th, 2024). The tent will be used for wedding events throughout the week. The location of the tent would be the area behind the backyard fence - which is the property of the City of Toronto.
73 WOODLOT CRES · Apr 6, 2024 · 222 m away - Zoning review
Closed
20 HUMBERLINE DR · Oct 30, 2023 · 282 m away
Neighbourhood: West Humber-Clairville
About the area around the lot, not the lot itself.
- Nearest station
- Humber College Station21 min walk
- Nearest TTC stop
- Humberline Dr at Viewcrest Cir East Side1 min walk
- Nearest cycling route
- West Humber TrlMulti-Use Trail, 2 min walk
- Nearest traffic count
- 12,523 vehicles in 14 hHumberwood Blvd / Humberline Dr, 200 m away, Oct 1, 2024
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Humber Arboretum1 min walk
- Humberline Park1 min walk
- Finch - Humberline Sportsfields1 min walk
Schools within 1 km
- HUMBERWOOD DOWNS JR MDL ACADEMY English Public 6 min walk
- HOLY CHILD CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
- HUMBER COLLEGE SCHOOL - NORTH CAMPUS College 15 min walk
- SOLID ROCK ACADEMY Private 16 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | West Humber-Clairville | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $92,000 | $84,500 |
| Households that own their home | 65% | 54% |
| Population (2021) | 33,300 | 16,813 |
| Homes built in 1960 or before | 13% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | West Humber-Clairville | City median |
|---|---|---|
| Assault | 933 | 636.3 |
| Robbery | 152.4 | 69.5 |
| Homicide | 2.7 | 5.3 |
| Shootings | 26.7 | 10.5 |
| Auto theft | 1320.6 | 192.6 |
| Theft over $5,000 | 245.9 | 46.1 |
| Break and enter | 347.5 | 172.8 |
| Theft from vehicles | 545.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.