Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
17 development applications open within 300 m
Good to know17 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
8 records on file: more than at 98% of Toronto houses (median 0).
- Zoning review06 133197 LTOClosedMay 9, 2006 · 70 EDWARD ST
- Zoning review03 170759 ZPRClosedAug 29, 2003 · 70 EDWARD ST
- Zoning review03 113793 LTOClosedMar 10, 2003 · 70 EDWARD ST
- Zoning review00 035895 ZSVClosedMay 18, 2000 · 70 EDWARD ST
- Zoning review00 138863 000ClosedMar 28, 2000 · 70 EDWARD ST
- Zoning review98 026240 LTOClosedJun 9, 1998 · 70 EDWARD ST
- Zoning review91 027143 LTOClosedDec 9, 1991 · 70 EDWARD ST
- Zoning review90 029055 LTOClosedDec 3, 1990 · 70 EDWARD ST
Check before you build
Site-specific exception 900.11.10(2308)
Needs a closer look4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(1) 397 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 111 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law D
Section 12(2) 256 of former City of Toronto By-law 438-86
2 parts for other addresses
- E On 595 Bay St., 633 Bay St., 25 Elm St., former City of Toronto by-laws 522-79, 743-79, 428-82, 636-82, and 715-82
- F On 633 Bay St., former City of Toronto by-law 808-88.
Lot facts
- Area
- 1,405 m²
- Frontage
- 30 m
- Depth
- 47.2 m
- Street
- Bay St
- Corner lot
- Yes, also on Edward St47.2 m along it
- Public lane
- Barnaby Pl, 37.7 m along it
- Max height
- 61 m
- Max lot coverage
- —
- Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Bay Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 7.8 (c2.0; r7.8) SS1 (x2308) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 92%12 of 13 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 33
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 241 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).
130 ELIZABETH ST · Jan 14, 2026 · 129 m away - Minor varianceApproved
To permit a place of amusement (arcade) use on this subject lot.
247 YONGE ST · Jan 8, 2025 · 407 m away - Minor varianceApproved
To construct a new 12-storey mixed-use building with a total of 30 residential dwelling units and two non-residential (commercial) units on this lot. The property owner will be undergoing a Site Plan Control application.
203 DUNDAS ST W · Oct 16, 2024 · 299 m away - Minor varianceApproved
To alter the development standards, as approved for a 85-storey mixed-use building (under Site Specific Zoning By-laws 1301-2019 (LPAT) and 1302-2019 (LPAT)).
363 YONGE ST · Nov 8, 2023 · 313 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever the property into two lots and to create new easements/rights-of-way.
123 EDWARD ST · Oct 2, 2027 · 210 m away - Building permit
Proposal for replacement of existing windows of office floors from Level 2-24.
700 BAY ST · Nov 24, 2026 · 188 m away - Zoning review
Closed
335 YONGE ST · Nov 23, 2026 · 300 m away - Building permit
Proposal for interior demolition of existing office floors from Level 2 - 24.
700 BAY ST · Nov 23, 2026 · 188 m away - Building permit
Four wall signs.***INTERNATIONAL BUSINESS UNIVERSITY***
655 BAY ST · Nov 19, 2026 · 146 m away - Building permit
Proposed an interior alteration
595 BAY ST · Nov 19, 2026 · 107 m away - Building permit
Proposal for interior alterations for Suite 2105 &2103
180 DUNDAS ST W · Nov 18, 2026 · 224 m away - Building permit
Revision No.1: To change Occupancy Type to B1, No new constructionProposal for interior renovation to room 7A refresh mental health pod - 2hr rating and door/hardware replacement, 1 new toilet and 1 fire damper
170 ELIZABETH ST · Nov 18, 2026 · 198 m away - Building permit
INTERIOR ALTERATIONS AND CHANGE OF USE FROM YOGA STUDIO TO DANCE STUDIO
121 DUNDAS ST W · Nov 17, 2026 · 135 m away - Building permit
Proposed interior alterations to replace existing revolving door with security gate.See approved AS permit 26-229850-AS
686 BAY ST · Nov 17, 2026 · 97 m away
Neighbourhood: Yonge-Bay Corridor
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station5 min walk
- Nearest TTC stop
- Bay St at Elm St1 min walk
- Nearest cycling route
- Bay StBike Lane, 1 min walk
- Nearest traffic count
- 19,848 vehicles in 14 hBay St / Edward St, 50 m away, Mar 19, 2024
- Serious collisions within 500 m
- 72021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 2 with cyclists
- Parks
- Larry Sefton Park4 min walk
- Trinity Square4 min walk
- College Park4 min walk
Schools within 1 km
- TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 3 min walk
- TMU - HEASLIP HOUSE University 6 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 7 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 8 min walk
- TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 9 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 9 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Yonge-Bay Corridor | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $68,500 | $84,500 |
| Households that own their home | 32% | 54% |
| Population (2021) | 12,645 | 16,813 |
| Homes built in 1960 or before | 2% | 29% |
| Homes needing major repairs | 2% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Yonge-Bay Corridor | City median |
|---|---|---|
| Assault | 3361.1 | 636.3 |
| Robbery | 300.1 | 69.5 |
| Homicide | 12 | 5.3 |
| Shootings | 12 | 10.5 |
| Auto theft | 162.1 | 192.6 |
| Theft over $5,000 | 210.1 | 46.1 |
| Break and enter | 552.2 | 172.8 |
| Theft from vehicles | 402.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.