HousePrecheckCheck an address

70 Chartwell RdToronto · zoning, lot size and permit records

116.1 × 184.4 m21,225 m²on Chartwell Rdcorner, also on Castlebar Rd

Not a home

Castlebar Jr School

The City's school locations place Castlebar Jr School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelStill open in the City's records: 24 145637 (PROPOSAL TO PLACE EXISTING PORTABLE CLASSROOM (1) ON EXISTING ELEMENTARY SCHOOL SITE, 2024, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
116.1 m frontage184.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2024

    Needs a closer look

    Still open in the City's records: 24 145637 (PROPOSAL TO PLACE EXISTING PORTABLE CLASSROOM (1) ON EXISTING ELEMENTARY SCHOOL SITE, 2024, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit24 145637Inspection

    PROPOSAL TO PLACE EXISTING PORTABLE CLASSROOM (1) ON EXISTING ELEMENTARY SCHOOL SITE

    Aug 20, 2024 · 70 CHARTWELL RD
  • Building permit23 167537Closed

    PLACE EXISTING PORTABLE CLASSROOM (1) ON EXISTING ELEMENTARY SCHOOL SITE

    Aug 18, 2023 · 70 CHARTWELL RD
  • Building permit19 120892Closed

    Proposal for interior alterations for new universal washroom, add plumbing fixtures,window replacement, ventilation upgrade, boiler upgrade, add BAS for entire building in existing elementary school.

    May 1, 2019 · 70 CHARTWELL RD
  • Building permit17 111424Closed

    Interior alterations to existing *Castlebar Public School*.

    Feb 22, 2017 · 70 CHARTWELL RD
  • Building permit16 213747Closed

    CASTLEBAR PS - INSTALLATION OF PV ROOFTOP SOLAR ARRAY ON AN EXISTING BUILDING

    Sep 27, 2016 · 70 CHARTWELL RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
21,225 m²
Frontage
116.1 m
Depth
184.4 m
Street
Chartwell Rd
Corner lot
Yes, also on Castlebar Rd184.4 m along it
Public lane
None
House footprint
2,242 m²roof up to 7.8 m
Back yard
115.2 mhouse to rear lot line
Side yards
14.5 m and 22 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 8 City trees in front of this lot. The City's street tree inventory lists 8 trees at this address: maple, norway (56 cm), maple, norway (55 cm), maple, norway (53 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
82%18 of 22 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 22 variance decisions: more than at 53% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage.

    44 YORKVIEW DR · Aug 27, 2026 · 481 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage.

    5 KINGSCROSS SQ · Jul 16, 2026 · 265 m away
  • Minor varianceRefused

    To construct a new detached dwelling with an attached garage, a front covered porch, a partially covered deck in the rear yard, and a third storey rear balcony

    28 AMBLESIDE AVE · May 14, 2026 · 433 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage.

    72 EDGECROFT RD · Feb 12, 2026 · 313 m away
  • Minor varianceApproved

    To construct a new triplex dwelling and to permit a front yard parking pad. The existing detached garage in the rear will maintained.

    38 EDGECROFT RD · Jan 29, 2026 · 488 m away

Latest activity nearby

  • Building permitdemolition

    Demolish existing one story dwelling.

    5 KINGSCROSS SQ · Oct 30, 2026 · 265 m away
  • Building permitnew building, new house

    Construct a two storey dwelling with an attached garage, front and rear covered porch

    5 KINGSCROSS SQ · Oct 30, 2026 · 265 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage.

    5 KINGSCROSS SQ · Jul 16, 2026 · 265 m away
  • Building permit

    Proposed new deck

    9 ELFORD BLVD · Jul 2, 2026 · 132 m away
  • Building permitsecondary suite

    Proposal for second unit and basement walkout.

    32 ELFORD BLVD · Jun 17, 2026 · 256 m away
  • Building permitdemolition

    Proposal to demo existing 1 storey dwelling to construct a new 2 storey house.

    21 ELFORD BLVD · May 5, 2026 · 154 m away
  • Building permitnew building, new house

    Proposal to construct a new 2 storey dwelling, replacing existing 1 storey dwelling.

    21 ELFORD BLVD · Apr 28, 2026 · 154 m away
  • Zoning review

    Closed

    5 KINGSCROSS SQ · Apr 15, 2026 · 265 m away
  • Building permitnew building, new house, secondary suite

    Revision 01: Revision to permit to include revision to front elevation and 2nd floor plan layoutProposal to demolish the existing dwelling and construct a new two storey, two unit dwelling with integral garage, basement walkout, first floor rear deck and a front porch.

    94 YORKVIEW DR · Mar 27, 2026 · 198 m away
  • Building permitdemolition

    Proposed demolition of existing SFD detached for new construction of 2 unit detached

    94 YORKVIEW DR · Feb 26, 2026 · 198 m away

Neighbourhood: Stonegate-Queensway

About the area around the lot, not the lot itself.

Nearest station
Islington Station30 min walk
Nearest TTC stop
Islington Ave at Titan Rd4 min walk
Nearest cycling route
Royal York RdBike Lane, 13 min walk
Nearest traffic count
1,112 vehicles in 8 hChartwell Rd / Castlebar Rd, 100 m away, Oct 27, 2021
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
Parks
Norseman Heights Park3 min walk
Queensway Park11 min walk
Queensland Park11 min walk

Schools within 1 km

  • CASTLEBAR JR SCHOOL English Public 1 min walk
  • HOLY ANGELS CATHOLIC ELEMENTARY English Separate 6 min walk
  • NORSEMAN JR MDL SCHOOL English Public 7 min walk
  • ETOBICOKE SCHOOL OF THE ARTS English Public 14 min walk
  • ST MARGUERITE D'YOUVILLE CATHOLIC ELEMENTARY SCHOOL French Separate 15 min walk
  • BISHOP ALLEN ACADEMY English Separate 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureStonegate-QueenswayMedian neighbourhood
Median household income (2020)$104,000$84,500
Households that own their home63%54%
Population (2021)25,65016,813
Homes built in 1960 or before55%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleStonegate-QueenswayCity median
Assault465.6636.3
Robbery40.869.5
Homicide3.45.3
Shootings13.610.5
Auto theft193.7192.6
Theft over $5,0006846.1
Break and enter217.5172.8
Theft from vehicles129.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.