HousePrecheckCheck an address

70 Bond StToronto · zoning, lot size and permit records

Also 78 Bond St, 80 Bond St

Commercial residential · CR 4.0 (c0.5; r4.0) SS1 (x1826)46.4 × 35.5 m1,637 m²on Bond Stbacks onto Victoria Street Lane

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 12 development applications open within 300 m, up to 71 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: DundasThe City plans more homes around the station: good for transit, and more building over time.
N20 m
46.4 m frontage35.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

17 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review25 256515 LPRClosed
    Nov 20, 2025 · 70 BOND ST
  • Building permit18 180429Closed

    Revision 01: Modifications to existing servery and open office areasProposed interior alterations to remove an existing window and replace with doors on the 3rd floor for roof access

    Aug 8, 2019 · 70 BOND ST
  • Building permit14 190102Closed

    To complete interior alterations to the basement and ground floor of St Michaels hospital to construct a LU/LA elevator for use on the ground floor and basement.

    Jul 15, 2014 · 80 BOND ST
  • Building permit13 232955Closed

    Proposal to install 1-1/2" back flow preventer in existing office building.

    Sep 13, 2013 · 70 BOND ST
  • Building permit13 128513Closed

    Proposal to enclose piping on the basement, 1st, 2nd and 3rd floors of existing office building (5.0m2).

    Mar 18, 2013 · 70 BOND ST
  • Building permit11 315400Closed

    Sprinkler permit in conjunction with 11 192474 BLD.

    Dec 5, 2011 · 70 BOND ST
  • Building permit11 192474Closed

    Proposal for interior alterations to existing office space on the 1st and 2nd floors (Family Practice Unit) - St Michaels Hospital. Convenience address is 80 Bond Street.

    Jul 6, 2011 · 70 BOND ST
  • Building permit10 119993Closed

    interior alterations to 2nd floor, office space

    Feb 26, 2010 · 70 BOND ST
Show 9 older records
  • Building permit10 119988Cancelled

    interior alterations to office space, 2nd floor,

    Feb 18, 2010 · 70 BOND ST
  • Building permit10 107792Closed

    Permit for interior demolition back to base building for existing office space - St Michaels Hospital. - Floor 1- Permit includes capping of plumbing and HVAC

    Feb 8, 2010 · 70 BOND ST
  • Building permit06 167486Closed - Dormant

    HVAC - Interior alterations to existing office & communication and broadcasting est. to remove an interconnected stair between the 4th $ 5th floor and to add a new interconnected stair between the 3rd & 4th floor.

    Oct 20, 2006 · 70 BOND ST
  • Building permit01 155702Closed

    install h.v.a.c. system on portion of basement & ground floor "vision t.v."

    Aug 22, 2001 · 70 BOND ST
  • Building permit01 155699Closed

    make interior alterations to portion of basement & ground floor "vision t.v."

    Jul 26, 2001 · 70 BOND ST
  • Building permit99 021383Closed

    ALTER PLANS AS APPROVED UNDER 421691 BY ALTER THE EXTERIOR ROOFTOP WALKWAY TO REQUIRED EXIT, ALSO ALTER WALL CONSTRUCTION. FEE $ 120.00

    Nov 9, 1999 · 70 BOND ST
  • Building permit99 020109Closed

    SUPPLY AND INSTALL H.V.A.C. SYSTEM FOR 3RD FLOOR. SEE BP# 421691

    Aug 20, 1999 · 70 BOND ST
  • Building permit99 012595Closed

    CONSTRUCT 3RD FLOOR ADDITION AT N/E ELEVATION SS SEE C OF A DEC HOLD FOR CASH IN LIEU OF PARKING

    Jul 2, 1999 · 70 BOND ST
  • Building permit99 016279Closed

    MAKE INTERIOR ALTERATIONS TO ENTRANCE VESTIBULE, CONSTRUCT NEW WASHROOM ON 1ST FLOOR. ALTER FRONT FACADE. FEE $ 1869.00

    Jun 11, 1999 · 80 BOND ST

Check before you build

  • Site-specific exception 900.11.10(1826)

    Needs a closer look

    3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(1826)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 397 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 132 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(2) 216 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
1,637 m²
Frontage
46.4 m
Depth
35.5 m
Street
Bond St
Corner lot
No
Public lane
Victoria Street Lane, 46 m along it
House footprint
943 m²
Back yard
3.7 mhouse to rear lot line
Side yards
0 m and 15.5 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 4.0 (c0.5; r4.0) SS1 (x1826) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
94%16 of 17 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
39

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 17 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

    332 YONGE ST · Oct 14, 2026 · 349 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.

    212 DUNDAS ST E · Jul 15, 2026 · 471 m away
  • Minor varianceApproved

    To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

    134 JARVIS ST · Nov 12, 2025 · 383 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

    53 A MUTUAL ST · Oct 1, 2025 · 275 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.

    53 MUTUAL ST · Oct 1, 2025 · 287 m away

Latest activity nearby

  • Building permit

    Proposal to replace existing pre-action system fire control panel and associated initiating field devices.

    30 BOND ST · Nov 19, 2026 · 204 m away
  • Zoning review

    Closed

    220 YONGE ST · Nov 10, 2026 · 243 m away
  • Zoning review

    Not Started

    21 DUNDAS SQ · Nov 6, 2026 · 123 m away
  • Building permit

    Proposed interior alterations to existing tenant retail space.

    220 YONGE ST · Nov 6, 2026 · 243 m away
  • Building permit

    Proposal for interior alterations to an existing retail store to accommodate a new tenant.

    220 YONGE ST · Nov 6, 2026 · 243 m away
  • Building permit

    Installation of a seasonal decorative Christmas wreath (designated structure) attached to the exterior wall of a retail store, Le Maison Simons, for the Christmas season.

    260 YONGE ST · Nov 6, 2026 · 202 m away
  • Building permit

    Proposal to install and update the existing sprinkler system in the washrooms on the 23rd floor.

    1 DUNDAS ST W · Nov 5, 2026 · 267 m away
  • Building permit

    Proposed interior alterations to an existing retail store for tenant improvements.

    220 YONGE ST · Nov 5, 2026 · 243 m away
  • Building permit

    Sprinklers related to 25-195702 BLD

    30 BOND ST · Nov 2, 2026 · 204 m away
  • Zoning review

    Closed

    78 MUTUAL ST · Oct 28, 2026 · 230 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
TMU Station4 min walk
Nearest TTC stop
Dundas St East at Church St2 min walk
Nearest cycling route
Shuter StBike Lane, 2 min walk
Nearest traffic count
11,168 vehicles in 14 hDundas St E / Bond St, 90 m away, Aug 20, 2024
Serious collisions within 500 m
202021–2026, killed or seriously injured: 2 fatal, 13 with pedestrians, 3 with cyclists
Parks
Arena Gardens3 min walk
Toronto Metropolitan University Square4 min walk
45 Dalhousie St Park4 min walk

Schools within 1 km

  • ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 1 min walk
  • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 1 min walk
  • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 1 min walk
  • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 1 min walk
  • TMU - HEASLIP HOUSE University 4 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 4 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.