HousePrecheckCheck an address

70 Alexander StToronto · zoning, lot size and permit records

Commercial residential · CR 3.0 (c1.7; r3.0) SS1 (x2144)≈ 2.7 × 10.4 m16 m²on Church Stcorner, also on Alexander St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.0 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 16 189428 (Replacement of existing fire alarm control panel, 2016, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 19 development applications open within 300 m, up to 75 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N5 m
≈ 2.7 m frontage≈ 10.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2016

    Needs a closer look

    Still open in the City's records: 16 189428 (Replacement of existing fire alarm control panel, 2016, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 19 development applications open within 300 m

    Good to know

    19 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 249834 ELS 00 IRClosed

    Election Signs

    Oct 5, 2026 · 70 ALEXANDER ST
  • By-law investigation25 241338 GRA 00 IRClosed

    Graffiti

    Oct 17, 2025 · 70 ALEXANDER ST
  • Building permit17 218727Closed

    Proposal for replacement of one chiller unit on the roof top level of existing apartment building.

    Sep 14, 2017 · 70 ALEXANDER ST
  • Building permit16 217448Cancelled

    Proposal for interior alterations to condo unit 601in the existing apartment building. Scope of work include demo and construction of partitions and new finishes.

    Sep 2, 2016 · 70 ALEXANDER ST
  • Building permit16 189428Permit Issued

    Replacement of existing fire alarm control panel.

    Aug 17, 2016 · 70 ALEXANDER ST
  • Zoning review11 105968 LPRClosed
    Jan 13, 2011 · 70 ALEXANDER ST
  • Building permit10 252138Closed

    Proposal to install one back flow prevention device. Building comprised of residential and commercial use.

    Sep 13, 2010 · 70 ALEXANDER ST
  • Zoning review09 117702 LTOClosed
    Mar 17, 2009 · 70 ALEXANDER ST
Show 2 older records
  • Building permit08 117177Closed

    Revision to alter door swing onto Alexander St (See folder for Encroacment Approval).

    Jun 5, 2008 · 70 ALEXANDER ST
  • Zoning review08 150024 ZPRClosed
    Apr 22, 2008 · 70 ALEXANDER ST

Check before you build

  • Site-specific exception 900.11.10(2144)

    Needs a closer look

    1 site-specific rule and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2144)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot . [TO: 438-86; 12 (2) 80]

  2. Older by-law A

    Section 12(2) 131 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12(2) 132 of former City of Toronto By-law 438-86

  4. Older by-law C

    Section 12(2) 260 of former City of Toronto By-law 438-86

  5. Older by-law D

    Former City of Toronto by-law 1993-537.

By-law 569-2013, Chapter 900

Lot facts

Area
16 m²
Frontage
2.7 mestimated, irregular lot
Depth
10.4 mestimated, irregular lot
Street
Church St
Corner lot
Yes, also on Alexander St10.4 m along it
Public lane
None
Max height
18 m
Max lot coverage
—
  • Site and Area Specific Policy 382. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Church Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 3.0 (c1.7; r3.0) SS1 (x2144) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%14 of 14 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
34

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

    508 CHURCH ST · Sep 9, 2026 · 43 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 88-2023(OLT)) for the 40-storey mixed-use building (which is currently under construction), by increasing the residential gross floor area, building height (41-storeys; 123.5 m to 127.6 m and 129.2 m to 133.6 m), and the height of the elevator overrun projection. There will be a total of 516 residential dwelling units on this site.

    20 MAITLAND ST · Apr 1, 2026 · 221 m away
  • Minor varianceApproved

    To alter the development standards for the previously approved 32-storey and 46-storey, two-tower mixed-use, purpose built rental development with 30 Percent affordable dwelling units and a child care center (approved under Site Specific Zoning By-law 1096-2021), by redistributing the building heights to 33 and 41storeys, increasing podium setbacks, reducing street wall heights, reducing the size of podium to create two separate buildings connected only below grade, decreasing the amount of indoor amenity space, reducing the number of two or more bedroom units, eliminating the resident and non-residential parking requirements, and decreasing the amount of residential visitor spaces. Site plan control application 19 127591 STE 13 SA is under review.

    27 GROSVENOR ST · Jul 30, 2025 · 424 m away
  • Minor varianceApproved

    To alter the existing three-storey apartment building (containing 35 rental dwelling units) by converting the basement level (storage rooms and building management office) and a portion of the ground floor (vacant space) into an additional 11 rental dwelling units. There will be a total of 46 rental dwelling units on this lot.

    134 CARLTON ST · Jul 9, 2025 · 405 m away
  • Minor varianceApproved

    To alter the development standards for the 40-storey mixed-use building (as approved under Site Specific Zoning By-law 88-2023) by increasing the total number of residential dwelling units, the overall and residential gross floor area, the building height, and the maximum projection height of an elevator overrun. Also, to reduce the total number of residential dwelling units with 3 or more bedrooms, the required amenity space, and the total number of residential visitor parking spaces. The new 45-storey mixed-use building (excluding the mechanical penthouse) will have a total of 572 residential dwelling units, 78 residential parking spaces, and 7 residential visitor parking spaces. This is currently undergoing Site Plan Control (Application Number 19 240163 STE 13 SA).

    26 MAITLAND ST · Apr 23, 2025 · 206 m away

Latest activity nearby

  • Building permit

    Proposal for interior alterations to lobby, main corridor, bar & restaurant at ground floor.

    475 YONGE ST · Nov 17, 2026 · 257 m away
  • Building permit

    Interior alteration to combine an existing gym room and adjacent pool room into one fitness room.

    475 YONGE ST · Nov 10, 2026 · 257 m away
  • Building permit

    Interior renovation of existing X-ray Rooms 240, 219, 236 and 231, to be completed in four sequential phases, with one room renovated at a time. The project also included the installation of three new X-ray machines during Phases 2, 3 and 4.

    43 WELLESLEY ST E · Oct 28, 2026 · 208 m away
  • Zoning review

    Closed

    12 ALEXANDER ST · Oct 20, 2026 · 226 m away
  • Zoning review

    Closed

    30 CARLTON ST · Oct 20, 2026 · 245 m away
  • Building permit

    Replacement of the existing make up air unit, DHW storage tank and boilers including ductwork, piping, pumps, etc. in the penthouse mechanical room.

    330 JARVIS ST · Oct 13, 2026 · 299 m away
  • Minor varianceApproved

    To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

    508 CHURCH ST · Sep 9, 2026 · 43 m away
  • Zoning review

    Closed

    473 CHURCH ST · Sep 2, 2026 · 76 m away
  • Building permit

    Installation of one Electromagnetic Lock on ground floor.

    20 MAITLAND ST · Sep 1, 2026 · 221 m away
  • Zoning review

    Closed

    527 YONGE ST · Aug 31, 2026 · 293 m away

Neighbourhood: Church-Wellesley

About the area around the lot, not the lot itself.

Nearest station
Wellesley Station5 min walk
Nearest TTC stop
Wellesley St East at Church St3 min walk
Nearest cycling route
Wellesley St ECycle Track, 3 min walk
Nearest traffic count
8,161 vehicles in 14 hChurch St / Alexander St, 30 m away, Sep 26, 2026
Serious collisions within 500 m
142021–2026, killed or seriously injured: 1 fatal, 10 with pedestrians, 2 with cyclists
Parks
Alexander Street Parkette3 min walk
Paul Kane House Parkette4 min walk
Barbara Hall Park4 min walk

Schools within 1 km

  • CHURCH ST JR & NATIVE LEARNING CTR English Public 2 min walk
  • NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 2 min walk
  • NATIONAL BALLET SCHOOL - BETTY OLIPHANT THEATRE Private 3 min walk
  • NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 3 min walk
  • NATIONAL BALLET SCHOOL Private 4 min walk
  • NATIONAL BALLET SCHOOL - MARGARET MCCAIN ACEDEMIC CENTRE Private 4 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureChurch-WellesleyMedian neighbourhood
Median household income (2020)$60,400$84,500
Households that own their home24%54%
Population (2021)22,32016,813
Homes built in 1960 or before15%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleChurch-WellesleyCity median
Assault1264.6636.3
Robbery93.269.5
Homicide3.35.3
Auto theft46.6192.6
Theft over $5,000106.546.1
Break and enter146.4172.8
Theft from vehicles206.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.