HousePrecheckCheck an address

7 Yonge StToronto · zoning, lot size and permit records

Also 10 Downes St, 11 Yonge St, 13B Yonge St, 13 Yonge St, 15 Yonge St and 9 more

≈ 132.6 × 146.8 m10,967 m²on Downes Stcorner, also on Yonge St

Not a home

A commercial or mixed-use building

14 different civic addresses share this parcel, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 25 125180 STE 10 CD (Draft Plan of Phased Condominium for 958 residential dwelling units, 2025); 21 245354 STE 10 SA (Site Plan Approval for Phase 4 & 5 of the One Yonge Development, consisting of two non-..., 2021); 16 126393 STE 28 SB (Draft Plan of Subdivision to create two lots separated by a public road (extension of H..., 2016). Larger work can mean noise and trucks next door; read what each one is for.
  • 9 development applications open within 300 m, up to 95 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
N50 m
≈ 132.6 m frontage≈ 146.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 125180 STE 10 CD (Draft Plan of Phased Condominium for 958 residential dwelling units, 2025); 21 245354 STE 10 SA (Site Plan Approval for Phase 4 & 5 of the One Yonge Development, consisting of two non-..., 2021); 16 126393 STE 28 SB (Draft Plan of Subdivision to create two lots separated by a public road (extension of H..., 2016).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 9 development applications open within 300 m

    Good to know

    9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 95 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • Development application25 125180 STE 10 CDDraft Plan Approved

    Draft Plan of Phased Condominium for 958 residential dwelling units.

    Mar 5, 2025 · 7 YONGE ST · City file
  • Development application22 227414 STE 10 CDClosed

    Draft Plan of Standard Condominium for a 65-storey mixed use building with 496 residential condo units in Phase 1. The development in Phase 1 also includes retail, commercial parking units, 100 affordable housing units, and a community centre.

    Nov 8, 2022 · 7 YONGE ST · City file
  • Development application22 138373 STE 10 SAClosed

    Phase 3 - Site Plan Approval for an 80-storey mixed-use building having a non-residential gross floor area of 2740 square metres and a residential gross floor area of 76,716 square metres. 877 residential dwelling units are proposed, of which, 121 are affordable units.

    Apr 26, 2022 · 38 FREELAND ST
  • Development application21 245354 STE 10 SAUnder Review

    Site Plan Approval for Phase 4 & 5 of the One Yonge Development, consisting of two non-residential towers having heights of 22 and 40-storeys, respectively.

    Dec 6, 2021 · 7 YONGE ST · City file
  • Development application20 152435 STE 10 OZClosed

    Official Plan and Zoning By-law amendment applications to revise the approved OPA and ZBA as it relates to the southerly parcel (phase 4 and 5) to allow for the inclusion of a hotel use within Phase 4 of the redevelopment, as well as changes to the proposal other changes to building mass. There is an associated site plan application 21 245354 STE 10 SA

    Jun 4, 2020 · 7 YONGE ST · City file
  • Development application19 234404 STE 10 OZClosed

    Application submitted to lift the Holding Symbol "H".

    Oct 9, 2019 · 7 YONGE ST · City file
  • Development application17 108913 STE 28 SAClosed

    A site plan application for Phase 2 that contemplates a 95-storey, 307 metre high mixed-use building. Part of the Lower Yonge Precinct Master Plan and Phase 2 of a 5 Phase development.

    Jan 25, 2017 · 7 YONGE ST · City file
  • Development application16 269114 STE 28 SAClosed

    Phase 1 of the proposed 5-phased development (north and south parcel) at 1-7 Yonge Street. This is a 65-storey, 204.2 metre high, mixed-use building with a total GFA of 60,743 square metres (including a 4,772 square metre Community Centre on floors 1 and 2, 1,167 square metres of retail at grade and 54,804 square metres of residential/affordable housing on floors 1 to 65).

    Dec 20, 2016 · 7 YONGE ST · City file
Show 2 older records
  • Development application16 126393 STE 28 SBAmend Drft Plan App

    Draft Plan of Subdivision to create two lots separated by a public road (extension of Harbour Street).

    Mar 11, 2016 · 7 YONGE ST · City file
  • Development application13 129256 STE 10 OZClosed

    Proposal for a 5 tower development including three mixed-use towers on the north block and two commercial towers on the south block. A total of 2,864 residential units, 1,867 parking spaces and 4,112 bike parking spaces are proposed. 10% of the residential units are proposed to be directed to affordable rental housing, and a community centre will be delivered onsite. The total proposed gross floor area is 386,078 square meters, comprised of 215,668 m2 residential and 170,409 m2 non-residential.

    Mar 6, 2013 · 7 YONGE ST · City file

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
10,967 m²
Frontage
132.6 mestimated, irregular lot
Depth
146.8 mestimated, irregular lot
Street
Downes St
Corner lot
Yes, also on Yonge St146.8 m along it
Public lane
None
House footprint
2,124 m²
Back yard
124.6 mhouse to rear lot line
Side yards
0.8 m and 23.6 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: honey locust (13 cm), honey locust (13 cm), honey locust (13 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%6 of 6 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
24

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards for a 92-storey mixed-use building (Tower 2), as approved under Site Specific Zoning By-law 1250-2023 (By-law 249-2020(LPAT)), by increasing the number of storeys and building height from 92-storeys (289 m) to 95-storeys (306.4 m). There will be a total of 1,014 residential dwelling units within this tower.

    7 YONGE ST · Sep 3, 2025 · 31 m away
  • Minor varianceApproved

    To alter the development standards for a 105-storey mixed-use building (as approved under Site Specific Zoning By-law 1250-2023) by increasing the building height and to permit an emergency generator on the roof of the building to exceed the maximum permitted building height. The new 106-storey mixed-use building will contain a total of 958 residential dwelling units, retail uses located on the ground floor, and a hotel use located on the 1st to 12th levels.

    7 YONGE ST · Apr 23, 2025 · 31 m away
  • Minor varianceApproved

    To alter the existing 25-storey building (Unit 108/108A and Unit 109) by permitting a side (north) ground level patio and associated structures (tables and planters) within the colonnade.

    20 BAY ST · Jan 15, 2025 · 333 m away
  • Minor varianceApproved

    To permit the reduction of residential parking spaces and types, residential amenity space provided, and tower heights to the 85 ,78, and 70-storey buildings, currently under review by Site Plan Control Application (File Number 20 19218252 STE 10 SA). There will be a total of 2,640 residential dwelling units (with 188 affordable units) within this block (Block4).

    55 LAKE SHORE BLVD E · Oct 23, 2024 · 193 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 674-2020(LPAT)), for an existing 25-storey commercial building (shown as Block 1 on Map 4), by permitting a clinic use.

    100 QUEENS QUAY E · Apr 17, 2024 · 326 m away

Latest activity nearby

  • Building permit

    Proposal for Interior Alterations to an existing tenant space.

    81 BAY ST · Nov 16, 2026 · 258 m away
  • Building permit

    Proposal for interior alterations on floor 9.

    81 BAY ST · Nov 16, 2026 · 258 m away
  • Building permit

    Alternative solution to provide specific design features engineered to protect and secure the building's floor openings and stairway.

    1 YONGE ST · Nov 10, 2026 · 128 m away
  • Building permit

    REMOVE AND REPLACE EXISTING FENCING/CAGING AROUND EXISTING STORAGES WITH1.5HR FIRE RATED WALLS AS REQUESTED BY THE FIRE INSPECTOR.EXISTING STORAGES ARE LOCATED WITHIN THE UNDERGROUND PARKING LEVEL P1

    33 BAY ST · Nov 5, 2026 · 221 m away
  • Building permit

    Proposed alternative solution regarding the extent of pool deck serving the following pools/spas for the mixed-use project as 1 Yonge - Phase 2, located at 1-7 Yonge Street

    7 YONGE ST · Nov 5, 2026 · 31 m away
  • Building permit

    Proposal for interior alterations to an existing residentil suite - UNIT 2212

    25 THE ESPLANADE · Oct 28, 2026 · 280 m away
  • Building permit

    Proposed ramp PUMA waterproofing installation, localized concrete and waterproofing removal and replacement, localized new drain installation, foundation wall leaking crack injection, and localzied drain repairs

    81 BAY ST · Oct 27, 2026 · 258 m away
  • Building permit

    Kitec piping replacement

    18 YONGE ST · Oct 27, 2026 · 156 m away
  • Zoning review

    Notice Sent

    1 YONGE ST · Oct 19, 2026 · 128 m away
  • Zoning review

    Closed

    81 BAY ST · Oct 5, 2026 · 258 m away

Neighbourhood: St Lawrence-East Bayfront-The Islands

About the area around the lot, not the lot itself.

Nearest station
Queens Quay/Ferry Docks Station5 min walk
Nearest TTC stop
Yonge St at Queens Quay East North Side2 min walk
Nearest cycling route
Yonge StBike Lane, 1 min walk
Nearest traffic count
15,868 vehicles in 14 hLake Shore Blvd E / Yonge St / Harbour St, 50 m away, Nov 6, 2024
Serious collisions within 500 m
162021–2026, killed or seriously injured: 3 fatal, 8 with pedestrians, 4 with cyclists
Parks
50 Queens Quay East Park2 min walk
Harbour Square Park Lands5 min walk
Pier 27 Promenade Park6 min walk

Schools within 1 km

  • DOWNTOWN ALTERNATIVE SCHOOL English Public 10 min walk
  • ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 10 min walk
  • GEORGE BROWN COLLEGE - WATERFRONT CAMPUS College 12 min walk
  • KEYSTONE INTERNATIONAL SCHOOLS Private 13 min walk
  • VICTORIA STREET LINC English Public 14 min walk
  • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSt Lawrence-East Bayfront-The IslandsMedian neighbourhood
Median household income (2020)$87,000$84,500
Households that own their home40%54%
Population (2021)31,28516,813
Homes built in 1960 or before3%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSt Lawrence-East Bayfront-The IslandsCity median
Assault1059.7636.3
Robbery96.369.5
Shootings4.510.5
Auto theft24.6192.6
Theft over $5,00078.446.1
Break and enter163.5172.8
Theft from vehicles163.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.