HousePrecheckCheck an address

7 Old York Mills RdToronto · zoning, lot size and permit records

Also 3 Old York Mills Rd, 4015 Yonge St

Open space · ON≈ 172.1 × 329.0 m37,098 m²on Old York Mills Rdcorner, also on Old Yonge St

Not a home

Trca Lands - Don River W

The City of Toronto's real estate inventory lists Trca Lands - Don River W here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 24 113199 (REV : Proposed revision includes deletion of pit ladder, new davit arms & fall arrest a..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 4 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
  • Major Transit Station Area: York MillsThe City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 172.1 m frontage≈ 329.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Building permit open since 2022

    Needs a closer look

    Still open in the City's records: 22 189108 (Remove and replace storm pumps, 2022, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 113199 (REV : Proposed revision includes deletion of pit ladder, new davit arms & fall arrest a..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • Building permit24 113199Revision Issued

    REV : Proposed revision includes deletion of pit ladder, new davit arms & fall arrest anchors and new and updated details.Replacement of pit cover and pit ladders and new pit gratings at various locations at TTC's York Mills Station

    Dec 31, 2025 · 4015 YONGE ST
  • Building permit24 145494Closed

    Install backflow preventer at York Mills Station

    May 31, 2024 · 4015 YONGE ST
  • Building permit22 189108Permit Issued

    Remove and replace storm pumps

    Sep 12, 2022 · 4015 YONGE ST
  • Building permit19 106743Closed

    Proposal for interior alterations for Service Room upgrades to York Mills subway station upgrading the power supply room and signal equipment room in existing station.

    Feb 11, 2019 · 4015 YONGE ST
  • Building permit17 246801Closed

    Proposal for interior alterations to existing transit station. Scope of work includes replacing legacy turnstiles with Presto faregates - York Mills Subway Station

    Oct 13, 2017 · 4015 YONGE ST
  • Building permit10 143224Closed

    Expansion of sprinkler riser room - TTC bus platform - York Mills Station

    Apr 30, 2010 · 4015 YONGE ST
  • Building permit10 112977Closed

    TTC Transit Terminal - Replacement of existing sprinkler system

    Mar 2, 2010 · 4015 YONGE ST
  • Building permit98 251184Closed - Dormant

    FIRE ALARM TO SUBWAY

    Sep 1, 1998 · 4015 YONGE ST

Lot facts

Area
37,098 m²
Frontage
172.1 mestimated, irregular lot
Depth
329 mestimated, irregular lot
Street
Old York Mills Rd
Corner lot
Yes, also on Old Yonge St329 m along it
Public lane
None
House footprint
239 m²roof up to 8.9 m
Back yard
303.8 mhouse to rear lot line
Side yards
47.7 m and 108.9 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: York Mills. The lot is inside the York Mills Major Transit Station Area approved by the Province (Site and Area Specific Policy 639). Source
  • Zone ON (Open Space Natural). Chapter 90, section 90.20 of the by-law. Source
  • 11 City trees in front of this lot. The City's street tree inventory lists 11 trees at this address: maple, manitoba (65 cm), oak, bur (30 cm), maple, manitoba (30 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
86%12 of 14 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
4

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Alternative Solution - Standpipe System Design

    4050 YONGE ST · Nov 2, 2026 · 298 m away
  • Zoning review

    Not Started

    10-36 YORK MILLS RD · Oct 28, 2026 · 267 m away
  • Building permit

    Proposal for fire pump replacement project.

    20 YORK MILLS RD · Oct 16, 2026 · 271 m away
  • Building permitnew building, new house

    REV 02: Revision to permit to remove the 2 h fire-resistance rating of the floor and supporting members between Basement (B1) and Sub-Basement (B2), and the 1.5 h fire-rated doors at the sub-basement stairs. Refer to cover letterProposal to construct a new two storey home with a basement walkout and sub basement.

    3 OLD YONGE ST · Oct 13, 2026 · 176 m away
  • Building permit

    The scope of work is limited to interior alterations within the existing amenity fitness area of an existing condominium building classified as a Group C Residential occupancy. The proposed renovation includes the construction of two new single-user, gender-neutral washrooms, each equipped with a water closet, lavatory, and shower, to serve the existing amenity area.The amenity fitness area is intended solely for the use of residents of the condominium building.

    3900 YONGE ST · Aug 25, 2026 · 188 m away
  • Development application

    Proposal of two residential mixed-use towers of 55 and 40 storeys (176.2 and 132.5 metres, exclusive of the mechanical penthouses), with approximately 903 dwelling units in a mix of unit types, including 267 rental units. The proposal is comprised of a total GFA of 85,220 square metres, consisting of approximately 82,336 square metres of residential GFA and 2,884 square metres of non-residential GFA, resulting in a density of 9.77 FSI on the development site and 3.24 on the subject lands.

    10-36 YORK MILLS RD · Aug 7, 2026 · 263 m away · City file
  • Building permit

    Rev 01 - Retain the entry door where is as is.Proposal for interior alterations to existing office space.

    36 YORK MILLS RD · Apr 21, 2026 · 271 m away
  • Minor varianceApproved

    To alter the development standards, as approved under Site-Specific By-law No. 788-2022(OLT), for the proposed 14 and 32-storey residential buildings, including to increase the maximum building heights, amend the required building setbacks and add balconies to the list of permitted encrochments.

    4050 YONGE ST · Apr 16, 2026 · 298 m away
  • Zoning review

    Closed

    4050 YONGE ST · Mar 17, 2026 · 298 m away
  • Building permit

    interior alteration - demising of suites and construction of ramp interior and exterior

    10-36 YORK MILLS RD · Jan 30, 2026 · 267 m away

Neighbourhood: Bridle Path-Sunnybrook-York Mills

About the area around the lot, not the lot itself.

Nearest station
York Mills Station5 min walk
Nearest TTC stop
Yonge St at Mcglashan Rd2 min walk
Nearest cycling route
York Mills Park TrlMulti-Use Trail - Connector, 1 min walk
Nearest traffic count
16,656 vehicles in 8 hYonge St / McGlashan Rd / Jolly Miller Park Trl, 110 m away, Aug 24, 2022
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Jolly Miller Park1 min walk
York Mills Park1 min walk
York Mills Valley Park2 min walk

Schools within 1 km

  • LORETTO ABBEY CATHOLIC SECONDARY SCHOOL English Separate 8 min walk
  • THE DUNBLAINE SCHOOL Private 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBridle Path-Sunnybrook-York MillsMedian neighbourhood
Median household income (2020)$222,000$84,500
Households that own their home89%54%
Population (2021)8,94016,813
Homes built in 1960 or before22%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBridle Path-Sunnybrook-York MillsCity median
Assault205.9636.3
Robbery51.569.5
Shootings17.210.5
Auto theft197.4192.6
Theft over $5,00034.346.1
Break and enter403.3172.8
Theft from vehicles163188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.