HousePrecheckCheck an address

7 Lee Centre DrToronto · zoning, lot size and permit records

≈ 17.0 × 25.0 m353 m²on Corporate Drcorner, also on Lee Centre Dr

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.0 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N10 m
≈ 17.0 m frontage≈ 25.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Check before you build

    • Zoning not in By-law 569-2013

      Needs a closer look

      This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

      Zoning By-law 569-2013

    Lot facts

    Area
    353 m²
    Frontage
    17 mestimated, irregular lot
    Depth
    25 mestimated, irregular lot
    Street
    Corporate Dr
    Corner lot
    Yes, also on Lee Centre Dr25 m along it
    Public lane
    None
    Max height
    —
    Max lot coverage
    —

      Around this lot

      Minor variances approved
      100%1 of 1 decisions
      Garden suite permits
      0
      Laneway suite permits
      0
      Multiplex permits
      0
      Development applications
      0

      Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

      Recent variance decisions in the same zone

      • Minor varianceApproved

        Interior alterations to the north wing to convert the existing church space into a day nursery.

        801 PROGRESS AVE · Sep 10, 2025 · 258 m away
      • Minor varianceApproved

        Landscaping and Parking Variances required from associated Consent application B0033/22SC. Cross reference associated MV application A0235/22SC. Note: This revised public notice is being issued to correctly state the variances being requested.

        124-126 MILNER AVE · May 4, 2023 · 498 m away
      • Minor varianceApproved

        Landscaping and Parking Variances required from associated Consent application B0033/22SC. Cross reference associated MV application A0234/22SC. Note: This revised public notice is being issued to correctly state the variances being requested.

        124-126 MILNER AVE · May 4, 2023 · 498 m away
      • Minor varianceApproved

        The applicant is seeking relief from the provisions of the Zoning By-law to permit the growing of micro greens in the existing organic food processing company, Crown Sprouts.

        1147 BELLAMY RD N · Dec 13, 2018 · 474 m away
      • Minor varianceApproved

        To expand the existing golf dome on the south side by 1,250 m² and to construct a new 90 m² club house addition on the north side.

        125 MILNER AVE · Oct 2, 2014 · 389 m away

      Latest activity nearby

      • Zoning review

        Closed

        108 CORPORATE DR · Nov 11, 2026 · 135 m away
      • Building permit

        Addition of a new wall within existing Switchboard B1 Electrical Room on the second floor to accommodate new equipment layout

        740 PROGRESS AVE · Sep 1, 2026 · 87 m away
      • Building permit

        To erect and display one illuminated wall sign***SHONAN SANDWICH & SWEET***

        26 LEE CENTRE DR · Aug 31, 2026 · 134 m away
      • Building permit

        Revision 1: Revision is to include addition of new walls on the 2nd floor for conduits to pass through. Proposal to construct interior alterations for 3 new Electrical rooms on the 1st floor a and new wall to accommodate equipment removal.

        740 PROGRESS AVE · Aug 10, 2026 · 87 m away
      • Zoning review

        Notice Sent

        733-735 PROGRESS AVE · Jun 29, 2026 · 175 m away
      • Zoning review

        Cancelled

        801 PROGRESS AVE · Jun 15, 2026 · 258 m away
      • Building permit

        Proposal for localized repairs to site features, waterproofing and concrete foundation.

        36 LEE CENTRE DR · May 19, 2026 · 150 m away
      • Building permit

        Proposal to install a new fire alarm system.

        36 LEE CENTRE DR · Apr 16, 2026 · 150 m away
      • Building permit

        Proposal to Install one (1) maglock on ground floor.

        740 PROGRESS AVE · Mar 16, 2026 · 87 m away
      • Building permit

        Conversion of the north wing of the existing church for Day-care use.

        801 PROGRESS AVE · Feb 11, 2026 · 258 m away

      Neighbourhood: Woburn North

      About the area around the lot, not the lot itself.

      Nearest station
      McCowan Rt Station14 min walk
      Nearest TTC stop
      Corporate Dr at Lee Centre Dr (West)2 min walk
      Nearest traffic count
      4,469 vehicles in 8 hLee Centre Dr / Corporate Dr, 30 m away, Mar 21, 2016
      Serious collisions within 500 m
      02021–2026, killed or seriously injured
      Parks
      Lee Centre Park1 min walk
      Hillsborough Park3 min walk
      White Haven Park9 min walk

      Schools within 1 km

      • MADINATUL ULOOM ACADEMY INC Private 5 min walk
      • MADINATUL ULOOM ISLAMIC GIRLS ACADEMY Private 6 min walk
      • AL HAADI SCHOOL Private 7 min walk
      • MADINATUL ULOOM ISLAMIC ACADEMY & OXFORD COLLEGE & FH INTERNATIONAL Private 8 min walk
      • ADVANCED CHRISTIAN ACADEMY (Renamed) Private 10 min walk
      • ADVANCED CHRISTIAN ACADEMY Private 10 min walk

      Being near a school does not mean the lot is in its catchment; check with the board.

      2021 Census

      FigureWoburn NorthMedian neighbourhood
      Median household income (2020)$74,500$84,500
      Households that own their home54%54%
      Population (2021)26,58016,813
      Homes built in 1960 or before23%29%
      Homes needing major repairs8%7%

      Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

      Police-reported crime, 2025

      Per 100,000 peopleWoburn NorthCity median
      Assault768.9636.3
      Robbery76.569.5
      Shootings13.910.5
      Auto theft316.6192.6
      Theft over $5,00062.646.1
      Break and enter180.9172.8
      Theft from vehicles281.8188.1

      Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

      Something here not right?

      Sources

      • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
      • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
      • Development applications: Rezoning, site plan, subdivision and condominium applications.
      • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
      • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
      • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
      • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
      • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
      • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
      • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
      • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
      • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
      • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
      • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
      • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
      • Address points: loaded Nov 22, 2026, published Nov 20, 2026
      • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
      • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
      • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
      • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
      • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
      • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
      • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
      • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
      • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
      • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
      • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
      • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
      • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
      • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
      • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
      • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
      • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
      • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
      • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
      • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
      • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
      • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
      • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
      • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
      • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
      • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
      • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
      • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
      • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
      • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
      • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
      • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
      • School locations: loaded Oct 14, 2026, published May 27, 2026
      • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
      • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
      • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
      • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
      • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
      • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
      • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
      • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
      • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
      • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

      Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

      Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

      Flag an error

      What is not right?

      The problem

      The records come from the City's open data; we check each flag against them. Your email is used only to answer this.