HousePrecheckCheck an address

7 Hook AveToronto · zoning, lot size and permit records

Employment · EL 2.0 (x101)7.3 × 30.6 m224 m²on Hook Avebacks onto Ln N Dundas E Watkinson

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 12 281109 (REVISION 2 - as per the OMB Decision, new 3rd floor area, 4 new balconies, new mezzanin..., 2019, status Revision Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 6 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
N10 m
7.3 m frontage30.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2019

    Needs a closer look

    Still open in the City's records: 12 281109 (REVISION 2 - as per the OMB Decision, new 3rd floor area, 4 new balconies, new mezzanin..., 2019, status Revision Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Zoning): 26 200253 ZON 00 IR (Zoning, 2026); 25 242997 ZON 00 IR (Zoning, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 Committee of Adjustment file on this lot

    Good to know

    0 approved. A1124/14TEY (To alter the approved building permit plans for the construction of a 3 storey industri..., 2015).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 6 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 200253 ZON 00 IRClosed

    Zoning

    Jul 11, 2026 · 7 HOOK AVE
  • By-law investigation25 242997 ZON 00 IRClosed

    Zoning

    Oct 21, 2025 · 7 HOOK AVE
  • Building permit12 281109Revision Issuednew building

    REVISION 2 - as per the OMB Decision, new 3rd floor area, 4 new balconies, new mezzanine, new parking area. New 3 storey industrial building containing total of 5 artist and photographer's studios.

    Jun 19, 2019 · 7 HOOK AVE
  • Minor varianceA1124/14TEYRefused

    To alter the approved building permit plans for the construction of a 3 storey industrial studio building by: increasing the floor area on the third floor; constructing a mezzanine level on the main floor; and adding rear second and third floor balconies.

    Feb 11, 2015 · 7 HOOK AVE
  • Zoning review14 122122 ZZCClosed
    Feb 26, 2014 · 7 HOOK AVE
  • Zoning review11 315211 PSPClosed
    Mar 27, 2012 · 7 HOOK AVE
  • Zoning review11 243106 ZZCClosed
    Jul 21, 2011 · 7 HOOK AVE
  • Zoning review10 318079 ZPRClosed
    Dec 21, 2010 · 7 HOOK AVE
Show 2 older records
  • Zoning review06 174777 PSPClosed
    Sep 12, 2006 · 7 HOOK AVE
  • Zoning review06 157978 ZPRClosed
    Jul 19, 2006 · 7 HOOK AVE

Check before you build

  • Exception 900.21.10(101) does not apply to this address

    Good to know

    The exception covers this area, but each of its 1 parts names other addresses. The standard rules on this page apply.

    Zoning By-law 569-2013, Chapter 900
Exception 900.21.10(101)Does not apply

Every part of the exception names other addresses. The standard rules apply to this lot.

1 part for other addresses
  • A On 601 Indian Grove, former City of Toronto by-law 96-0227.
By-law 569-2013, Chapter 900

Lot facts

Area
224 m²
Frontage
7.3 m
Depth
30.6 m
Street
Hook Ave
Corner lot
No
Public lane
Ln N Dundas E Watkinson, 7.3 m along it
Max height
14 m
Max lot coverage
—
  • Zone EL 2.0 (x101) (Employment Light Industrial). Chapter 60, section 60.10 of the by-law. Source

Around this lot

Minor variances approved
100%24 of 24 decisions
Garden suite permits
1
Laneway suite permits
2
Multiplex permits
6
Development applications
12

Within 300 m, last 10 years. 9 suite and multiplex permits: more than at 72% of Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Back water valve installation (Homeowner has passed away, applying for permit under the Estate of )

    485 INDIAN GRV · Nov 18, 2026 · 251 m away
  • Building permit

    INSIDE BACK WATER VALVE INSTALLATION

    490 INDIAN GRV · Nov 4, 2026 · 266 m away
  • Building permit

    Interior alterations to convert a laundromat to a grocery store and main floor store front alterations

    2790 DUNDAS ST W · Sep 9, 2026 · 230 m away
  • Building permit

    Proposed new rear yard carport and rear ground floor deck extension.

    576 INDIAN GRV · Aug 26, 2026 · 275 m away
  • Building permitmultiplex

    Proposal for multiple projects (second/third storey addition, interior alterations and conversion to create a six unit dwelling).

    2611 DUNDAS ST W · Aug 13, 2026 · 278 m away
  • Building permitlaneway suite

    Proposal to construct a new two-storey laneway suite.

    806 INDIAN RD · Jun 15, 2026 · 176 m away
  • Building permit

    2 Wall Signs*****Circa Atelier*****

    2738 DUNDAS ST W · Jun 2, 2026 · 61 m away
  • Building permit

    1 Wall Sign*****Circa Atelier*****

    2738 DUNDAS ST W · May 26, 2026 · 61 m away
  • Zoning review

    Application On Hold

    2 A OSLER ST · Apr 28, 2026 · 227 m away
  • Building permit

    Proposal for interior alterations throughout dwelling demolish bay window, balcony and sitting area.

    806 INDIAN RD · Apr 28, 2026 · 176 m away

Neighbourhood: Junction Area

About the area around the lot, not the lot itself.

Nearest station
Dundas West Station17 min walk
Nearest TTC stop
Dundas St West at Annette St2 min walk
Nearest cycling route
Annette StBike Lane, 2 min walk
Nearest traffic count
9,292 vehicles in 8 hWatkinson Ave / Dundas St W, 70 m away, Apr 5, 2017
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Dundas - Watkinson Parkette1 min walk
West Toronto Railpath2 min walk
Carlton Park5 min walk

Schools within 1 km

  • LUCY MCCORMICK SR SCHOOL English Public 2 min walk
  • ST RITA CATHOLIC ELEMENTARY SCHOOL & MSGR FRASER SOUTHWEST English Separate 5 min walk
  • INDIAN ROAD CRESCENT JR PUBLIC SCHOOL English Public 5 min walk
  • THE GREAT LAKES COLLEGE SCHOOL Private 6 min walk
  • ECOLE ELEMENTAIRE CHARLES SAURIOL French Public 7 min walk
  • PERTH AVENUE JR PUBLIC SCHOOL English Public 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureJunction AreaMedian neighbourhood
Median household income (2020)$96,000$84,500
Households that own their home58%54%
Population (2021)14,01016,813
Homes built in 1960 or before55%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleJunction AreaCity median
Assault908.1636.3
Robbery74.669.5
Shootings6.210.5
Auto theft236.4192.6
Theft over $5,00087.146.1
Break and enter304.8172.8
Theft from vehicles578.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.