Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: in a Heritage Conservation District (Part V)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register2 building permits open, the oldest since 2004
Needs a closer lookStill open in the City's records: 03 201120 (Install sprinkler system. In connection with B.P.#03-200392, 2004, status Work Not Started); 04 100303 (Install fire alarm system.No physical file-TFS documentation scanned and attached to pe..., 2004, status Work Not Started).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 Committee of Adjustment file on this lot
Good to know1 approved. A1099/14TEY (To convert the 9-storey vacant building into a place of worship containing office space..., 2015).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)19 development applications open within 300 m
Good to know19 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 94 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
16 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation25 141353 GRA 00 IRClosed
Graffiti
Apr 8, 2025 · 696 YONGE ST - Building permit17 232862Closed
REV01: changes as per drawings
Mar 5, 2021 · 696 YONGE ST - Minor varianceA1099/14TEYApproved
To convert the 9-storey vacant building into a place of worship containing office space and to construct a mechanical penthouse.
Jan 28, 2015 · 696 YONGE ST - Building permit14 266853Cancelled
Proposal to remove all interior walls on all floors, remove all exterior walls (note steel frame and flooring to remain), and construct new exterior walls and interior alterations to all floors at existing Church of Scientology.
Dec 22, 2014 · 696 YONGE ST - Zoning review14 175258 ZPRClosedJun 17, 2014 · 696 YONGE ST
- Zoning review14 173998 000CancelledJun 13, 2014 · 696 YONGE ST
- Zoning review13 132886 ZPRClosedMar 14, 2013 · 696 YONGE ST
- Building permit13 106154Cancelled
Proposal for interior demolition in existing building "Church of Scientology" (5594m2). Fit-up drawings to come in on a later date.
Jan 15, 2013 · 696 YONGE ST
Show 8 older records
- Building permit03 201120Work Not Started
Install sprinkler system. In connection with B.P.#03-200392.
Apr 14, 2004 · 696 YONGE ST - Building permit04 100303Work Not Started
Install fire alarm system.No physical file-TFS documentation scanned and attached to permit file.
Mar 4, 2004 · 696 YONGE ST - Building permit03 200392Closed
Plumbing - Make interior alterations to the ground and second floor. Tenant: Church of Scientology. Existing and proposed: Office. - Interior Alterations
Feb 18, 2004 · 696 YONGE ST - Zoning review03 202672 PSPClosedDec 23, 2003 · 696 YONGE ST
- Zoning review03 149433 ZPRClosedJun 25, 2003 · 696 YONGE ST
- Zoning review01 123251 000ClosedMar 30, 2001 · 696 YONGE ST
- Zoning review01 035295 ZSVClosedFeb 27, 2001 · 696 YONGE ST
- Zoning review01 111113 000ClosedFeb 16, 2001 · 696 YONGE ST
Check before you build
Site-specific exception 900.11.10(2546)
Needs a closer look4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 208 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 260 of former City of Toronto By-law 438-86
- Older by-law D
City of Toronto by-law 466-2005
7 parts for other addresses
- E On 35 Balmuto St., 764 Yonge St., City of Toronto by-law 466-05
- F On 75 St. Nicholas St., 692 Yonge St., City of Toronto by-law 103-10
- G On the lands municipally known as 501-523 Yonge St. in 1981, Section 12 (2) 160 of former City of Toronto By-law 438-86
- H On 501 Yonge St., being former City of Toronto by-law 511-82
- I On 555 Yonge St., former City of Toronto by-law 284-68
- J On 619 Yonge St., former City of Toronto by-law 436-75
- K On 730 Yonge St., former City of Toronto by-laws 22910 and 223-67.
Lot facts
- Area
- 617 m²
- Frontage
- 18.3 m
- Depth
- 34.2 m
- Street
- Yonge St
- Corner lot
- Yes, also on St Mary St34.2 m along it
- Public lane
- Ln W Yonge S St Mary, 25.7 m along it
- House footprint
- 587 m²
- Back yard
- 0.1 mhouse to rear lot line
- Side yards
- 0.1 m and 0.1 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 5house, garage, sheds
- Max height
- 18 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 382. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Yonge Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 3.0 (c2.0; r3.0) SS1 (x2546) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: honey locust (8 cm), honey locust (8 cm), elm (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 97%28 of 29 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 43
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located at the southern limits of this subject site) will be maintained and unaltered. There will be a total of 329 residential dwelling units on this lot.
1235 BAY ST · Oct 14, 2026 · 449 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1050-2015) for the 68-storey mixed-use building (north-east Tower) by increasing the building height from 215 m to 218.6 m (including the height of the mechanical penthouse). Also, to reduce the total number of commercial parking spaces (managed by the Toronto Parking Authority) from 800 to 795 within Parking Levels 1 to 6 (with five parking spaces located on the south-east portion of Parking Level 6 being converted into car wash bays). The existing 196 residential parking spaces on Parking Levels 3 and 4 will be maintained and unaltered.
27-29 YORKVILLE AVE · Jul 15, 2026 · 452 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 88-2023(OLT)) for the 40-storey mixed-use building (which is currently under construction), by increasing the residential gross floor area, building height (41-storeys; 123.5 m to 127.6 m and 129.2 m to 133.6 m), and the height of the elevator overrun projection. There will be a total of 516 residential dwelling units on this site.
20 MAITLAND ST · Apr 1, 2026 · 454 m away - Minor varianceApproved
To alter the development standards for the 40-storey mixed-use building (as approved under Site Specific Zoning By-law 88-2023) by increasing the total number of residential dwelling units, the overall and residential gross floor area, the building height, and the maximum projection height of an elevator overrun. Also, to reduce the total number of residential dwelling units with 3 or more bedrooms, the required amenity space, and the total number of residential visitor parking spaces. The new 45-storey mixed-use building (excluding the mechanical penthouse) will have a total of 572 residential dwelling units, 78 residential parking spaces, and 7 residential visitor parking spaces. This is currently undergoing Site Plan Control (Application Number 19 240163 STE 13 SA).
26 MAITLAND ST · Apr 23, 2025 · 458 m away - Minor varianceApproved
To alter the development standards for the site (as approved under Site Specific Zoning By-law 778-2016(OMB)), for the existing 44-storey mixed-use building, by constructing mezzanine space. Also, to convert the existing two-and-one-half-storey townhouses (located at the northeast corner on this lot, municipally known as 7 and 9 Gloucester Street) into mixed-use buildings, and to increase the non-residential gross floor areas.
593 YONGE ST · Nov 27, 2024 · 206 m away
Latest activity nearby
- Zoning review
Application On Hold
649 YONGE ST · Nov 23, 2026 · 56 m away - Building permit
One wall sign.***SIGNATURE HAIR STUDIO***
665 YONGE ST · Nov 18, 2026 · 75 m away - Building permit
Proposed Hydro Vault Repairs
1001 BAY ST · Nov 13, 2026 · 267 m away - Building permit
1 Wall Sign*****RUDSAK******
55 BLOOR ST W · Nov 10, 2026 · 295 m away - Building permit
Proposed interior alteration at second, third, fifth and sixth floor to convert the property from office building to mixed-use building; Proposed: 10 residential units, 1 wellness studio and 5 officesExisting: 1 wellness studio at first floor and 1 office at fourth floor
9 ST NICHOLAS ST · Nov 9, 2026 · 285 m away - Building permit
Proposal to convert the second floor of Da.Si.Mar Shawarma into a coffee shop with a maximum seating capacity of 30 people
673 YONGE ST · Nov 5, 2026 · 89 m away - Building permit
2 Wall Sign****AXIA STATION****
608 YONGE ST · Nov 5, 2026 · 237 m away - Building permit
Proposal for interior alterations to accommodate new office
22 ST JOSEPH ST · Nov 4, 2026 · 194 m away - Building permit
REV: Proposed revision for ventilation adjustments based on as-built conditionProposal to replace heating plant, domestic hot water heating, potable water distribution, ventilation and air conditioning systems.
2 GLOUCESTER ST · Nov 3, 2026 · 142 m away - Zoning review
Closed
665 YONGE ST · Oct 27, 2026 · 75 m away
Neighbourhood: Bay-Cloverhill
About the area around the lot, not the lot itself.
- Nearest station
- Wellesley Station5 min walk
- Nearest TTC stop
- Yonge St at Charles St East1 min walk
- Nearest cycling route
- Yonge StCycle Track, 3 min walk
- Nearest traffic count
- 10,552 vehicles in 14 hYonge St / Isabella St, 40 m away, Aug 25, 2026
- Serious collisions within 500 m
- 92021–2026, killed or seriously injured: 0 fatal, 4 with pedestrians, 3 with cyclists
- Parks
- St. Mary Street Parkette1 min walk
- George Hislop Park2 min walk
- Norman Jewison Park2 min walk
Schools within 1 km
- HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 5 min walk
- THE ABELARD CENTRE FOR EDUCATION Private 6 min walk
- ST JOSEPH'S COLLEGE SCHOOL English Separate 7 min walk
- THE YMCA ACADEMY SECONDARY SCHOOL Private 8 min walk
- TORONTO SCHOOL OF THEOLOGY - U OF T, BLDG 434 University 8 min walk
- ROSEDALE DAY SCHOOL Private 8 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Bay-Cloverhill | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $58,400 | $84,500 |
| Households that own their home | 30% | 54% |
| Population (2021) | 16,670 | 16,813 |
| Homes built in 1960 or before | 4% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Bay-Cloverhill | City median |
|---|---|---|
| Assault | 601.9 | 636.3 |
| Robbery | 74.7 | 69.5 |
| Auto theft | 16.6 | 192.6 |
| Theft over $5,000 | 87.2 | 46.1 |
| Break and enter | 286.4 | 172.8 |
| Theft from vehicles | 145.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.