HousePrecheckCheck an address

695 Caledonia RdToronto · zoning, lot size and permit records

Also 90 Ronald Ave

Open space · O≈ 54.2 × 326.1 m9,913 m²on Caledonia Rd

Not a home

Kay Gardner Belt Line Park - Prop F

The City of Toronto's real estate inventory lists Kay Gardner Belt Line Park - Prop F here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 3 development applications open within 300 m, up to 55 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
  • Major Transit Station Area: CaledoniaThe City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 54.2 m frontage≈ 326.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Natural Heritage System (87% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 55 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • By-law investigation24 132358 SIN 00 IROpen

    Signs

    Apr 4, 2024 · 695 CALEDONIA RD

Lot facts

Area
9,913 m²
Frontage
54.2 mestimated, irregular lot
Depth
326.1 mestimated, irregular lot
Street
Caledonia Rd
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Major Transit Station Area: Caledonia. The lot is inside the Caledonia Major Transit Station Area approved by the Province (Site and Area Specific Policy 674). Source
  • Zone O (Open Space). Chapter 90, section 90.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: elm, siberian (8 cm), elm, siberian (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%10 of 10 decisions
Garden suite permits
2
Laneway suite permits
0
Multiplex permits
0
Development applications
3

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 10 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    PROPOSED INTERIOR ALTERATIONS FOR GYM

    1350-1400 CASTLEFIELD AVE · Nov 24, 2026 · 191 m away
  • Zoning review

    Under Review

    1350-1400 CASTLEFIELD AVE · Oct 13, 2026 · 191 m away
  • Building permit

    2 sign walls.***FIT 4 LESS***

    1350-1400 CASTLEFIELD AVE · Oct 6, 2026 · 191 m away
  • Building permit

    Interior renovation of existing sales space (leasehold improvement):- Modify/remove existing partition walls,- Remove existing lavatory and toilet.- Construct new partition walls - Install new utility tub sink,- Provide power for tenant's parts-washer machine.

    1300 CASTLEFIELD AVE · Sep 28, 2026 · 208 m away
  • Building permit

    2 sign walls.***FIT 4 LESS***

    1350-1400 CASTLEFIELD AVE · Sep 2, 2026 · 191 m away
  • Zoning review

    Notice Sent

    1341 CASTLEFIELD AVE · Aug 19, 2026 · 74 m away
  • Building permit

    Proposal for Interior alterations - improvements for a new Fit4Less fitness club, including partitions, washrooms, HVAC, electrical, plumbing, and fire protection updates. No structural work proposed.

    1350-1400 CASTLEFIELD AVE · Aug 7, 2026 · 191 m away
  • Zoning review

    Closed

    1350-1400 CASTLEFIELD AVE · Jul 16, 2026 · 191 m away
  • Zoning review

    Cancelled

    1400 CASTLEFIELD AVE · Jul 2, 2026 · 269 m away
  • Building permit

    Proposal for main roof extension to cover existing entrance slab over root cellar

    43 LITTLE BLVD · Mar 16, 2026 · 271 m away

Neighbourhood: Briar Hill-Belgravia

About the area around the lot, not the lot itself.

Nearest station
Caledonia Station12 min walk
Nearest TTC stop
Caledonia Rd at Castlefield Ave2 min walk
Nearest cycling route
Beltline TrlMulti-Use Trail, 1 min walk
Nearest traffic count
28,898 vehicles in 14 hCaledonia Rd / Castlefield Ave, 130 m away, Aug 5, 2026
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Kay Gardner Beltline Park1 min walk
Woodborough Park9 min walk
Eglinton - Gilbert Parkette10 min walk

Schools within 1 km

  • FAIRBANK MEMORIAL COMMUNITY SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBriar Hill-BelgraviaMedian neighbourhood
Median household income (2020)$81,000$84,500
Households that own their home48%54%
Population (2021)14,57516,813
Homes built in 1960 or before37%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBriar Hill-BelgraviaCity median
Assault684.5636.3
Robbery73.369.5
Shootings12.210.5
Auto theft262.8192.6
Theft over $5,00048.946.1
Break and enter207.8172.8
Theft from vehicles146.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.