Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: designated (Part IV)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register9 building permits open, the oldest since 2006
Needs a closer lookStill open in the City's records: 23 167124 (PROPOSED: Removal and replacement of school wood workshop dust collection system comple..., 2023, status Inspection); 22 236753 (Demolish existing steam boiler, terminal steam heating units (radiators, unit heaters)...., 2023, status Inspection); 18 135060 (Proposed solar photovoltaic panel on roof top, 2018, status Permit Issued); and 6 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 25 217274 PRS 00 IR (Property Standards, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 26 164894 (Revision No.1: ENCLOSE A SECOND EXISTING SKYLIGHTProposal to enclose existing skylight, 2026); 18 265056 (Rev 01 - Dust collector workRemoval and replacement of school wood workshop dust collec..., 2025); 25 182837 (Proposal for replacement of cabinet unit heaters, fan coil units, finned tube radiant h..., 2025); and 2 more.
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know0 approved. A0767/13TEY (To construct a seasonal sports dome (October to March of each year) over the track and..., 2014).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
44 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 164894Revision Issued
Revision No.1: ENCLOSE A SECOND EXISTING SKYLIGHTProposal to enclose existing skylight.
Nov 2, 2026 · 693 BATHURST ST - By-law investigation26 166046 GRA 00 IRNotice Issued
Graffiti
May 24, 2026 · 725 BATHURST ST - By-law investigation25 217274 PRS 00 IRClosed
Property Standards
Aug 28, 2025 · 725 BATHURST ST - Building permit18 265056Revision Issued
Rev 01 - Dust collector workRemoval and replacement of school wood workshop dust collection system complete with installation of two indoor dust collectors on structural equipment pad and interlocked with two new make up air unit to balance airflow in the wood workshops.
Aug 27, 2025 · 725 BATHURST ST - Building permit25 182837Permit Issued
Proposal for replacement of cabinet unit heaters, fan coil units, finned tube radiant heaters, etc. Supply and install new piping and associated accessories.
Jul 15, 2025 · 725 BATHURST ST - Building permit24 250772Permit Issued
Proposed scope of work to include courtyard window replacement, courtyard brick repairs, and structural modifications to access platforms from courtyard.
Jan 20, 2025 · 725 BATHURST ST - Building permit23 167124Inspection
PROPOSED: Removal and replacement of school wood workshop dust collection system complete with installation of two indoor dust collectors on structural equipment pad and interlocked with two new make up air unit to balance airflow in the wood workshops.
Aug 4, 2023 · 725 BATHURST ST - Building permit22 236753Inspection
Demolish existing steam boiler, terminal steam heating units (radiators, unit heaters). Demolish existing air handling units with steam heating coil.Install new hot water boiler, pumps, and hydronic heating piping system with new terminal heating units. Install new air handling units with hydronic heating coil and match existing capacity.
Feb 22, 2023 · 725 BATHURST ST
Show 36 older records
- Building permit22 236797Cancelled
proposed new floor drains
Dec 6, 2022 · 725 BATHURST ST - Building permit21 129490Closed
Interior alterations to three existing classrooms - Central Technical School
May 7, 2021 · 693 BATHURST ST - Building permit20 191474Closed
Emergency repair to deteriorated structural beam in basement below exterior stairs
Sep 23, 2020 · 693 BATHURST ST - Building permit20 177071Closed
Proposal for alterations to existing library within the school.
Sep 4, 2020 · 725 BATHURST ST - Building permit20 115309Closed
Structural repair and reinforcement of the south stair slab. Work includes structural steel supports at the underside of the existing stair slab, replacement of lower structure of stair slab with new concrete slab. waterproofing and masony replacements. Mechanical and HVAC disconnections and reconnections to permit structural repairs.
Mar 13, 2020 · 693 BATHURST ST - Building permit19 211201Closed
Proposed air supported structure to be erected on Nov 2, 2019 and dismantled Apr 30, 2020.Convenience address is 725 Bathurst St.
Sep 6, 2019 · 693 BATHURST ST - Building permit19 133485Closed
Proposal masonry repairs to the stair and window and railing replacement in the existing Secondary School "Central Tech".
Apr 17, 2019 · 693 BATHURST ST - Building permit18 206685Closed
Proposed air supported structure to be erected on Nov 2, 2018 and dismantled Apr 30, 2019.Convenience address is 725 Bathurst St.
Sep 24, 2018 · 693 BATHURST ST - Building permit18 171912Closed
Proposed replacement of workshop dust collection system, installation of a new exterior dust collector on a structural slab-on-grade and make-up-air unit to balance airflow in the wood workshop of an existing secondary school.
Aug 13, 2018 · 725 BATHURST ST - Building permit18 135060Permit Issued
Proposed solar photovoltaic panel on roof top.
Jun 21, 2018 · 725 BATHURST ST - Building permit17 210484Permit Issued
Proposal for replacement of sandstone columns at north elevation to existing secondary school.
Apr 13, 2018 · 693 BATHURST ST - Building permit17 272411Inspection
Renovate Existing school facilities, plumbing and HVAC
Jan 4, 2018 · 725 BATHURST ST - Building permit17 231438Closed
Proposed air supported structure to be erected on Oct 30, 2017 and dismantled Apr 29, 2018.
Oct 26, 2017 · 725 BATHURST ST - Building permit15 151333Closed
HVAC - Proposal install an artificial field, new running track, seasonal dome that will be installed during the winter months only (5.5 months out of the year). See also 13 196571 ZPR, 14 226915 ZZC and OMB decision. Convenience address is 725 Bathurst St.
Jan 18, 2017 · 693 BATHURST ST - Building permit16 252221Permit Issued
Install 1 backflow preventer
Jan 11, 2017 · 725 BATHURST ST - Building permit16 234675Cancelled
Proposal for a new ramp to the entrance of the existing secondary school - "Central Technical School"
Oct 7, 2016 · 725 BATHURST ST - Building permit16 234656Application Received
curtain window replacement over swimming pool area.
Oct 7, 2016 · 725 BATHURST ST - Building permit15 192158Closed
HVAC - Proposal for a 1 storey boiler room addition in the courtyard in existing secondary school - "Central Technical School"
Jul 12, 2016 · 725 BATHURST ST - Building permit15 204198Permit Issued
Installation of a rooftop photovoltaic array on an existing building. Toronto District School Board. Central Technical School.
Jun 15, 2016 · 725 BATHURST ST - Building permit15 244630Permit IssuedNov 17, 2015 · 725 BATHURST ST
- Zoning review14 263423 ZPRCancelledDec 12, 2014 · 693 BATHURST ST
- Zoning review14 226915 ZZCClosedSep 23, 2014 · 693 BATHURST ST
- Zoning review14 226910 ZPRCancelledSep 23, 2014 · 693 BATHURST ST
- Minor varianceA0767/13TEYRefused
To construct a seasonal sports dome (October to March of each year) over the track and field at Central Technical School and a permanent utility building at the north end of the field to accommodate the air handling equipment.
Mar 26, 2014 · 693 BATHURST ST - Zoning review13 196571 ZPRClosedJun 28, 2013 · 693 BATHURST ST
- Zoning review13 145014 ZZUCancelledApr 5, 2013 · 693 BATHURST ST
- Building permit10 300428Closed
Proposal to demo secondary school kitchen an install new fixtures. See 10-300416 MSA. Convenience address 725 Bathurst Street.
Dec 20, 2010 · 693 BATHURST ST - Building permit10 300416Closed
Proposal to demolish existing kitchen exhaust and ducts and install new to existing secondary school kitchen. Convenience address 725 Bathurst Street. See 10-300428 PSA
Dec 20, 2010 · 693 BATHURST ST - Building permit10 181010Closed
curtain window replacement over swimming pool area.
Jun 8, 2010 · 725 BATHURST ST - Building permit06 138147Inspection
Make interior alterations to 4th floor for ventilated chemical preparation & storage room in existing secondary school. Central Tech.
May 29, 2006 · 693 BATHURST ST - Building permit03 129740Closed
Upgrade existing system
May 21, 2003 · 693 BATHURST ST - Building permit03 126083Closed
make interior alterations to the RM#150 on the ground floor.
Apr 24, 2003 · 693 BATHURST ST - Building permit03 124868Closed
make interior alterations to the ground floor.
Apr 17, 2003 · 693 BATHURST ST - Building permit02 196927Closed
Convert existing metallurical lab into a resource centre facility for an existing school
Dec 19, 2002 · 693 BATHURST ST - Building permit01 134125Closed
Boiler replacement (3 steam boilers being replaced with 4 steam boilers) and altering existing piping. conv. address 725 Bathurst St.
May 29, 2001 · 693 BATHURST ST - Building permit97 017698Closed
MAKE INTERIOR ALTERATIONS TO 4TH FLOOR FOR NEW SCIENCE LAB. EDC CONVENIENCE ADDRESS: 725 BATHURST ST
Jul 17, 1997 · 693 BATHURST ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 48,067 m²
- Frontage
- 193.8 m
- Depth
- 249.3 m
- Street
- Harbord St
- Corner lot
- Yes, also on Bathurst St249.3 m along it
- Public lane
- None
- House footprint
- 4,101 m²roof up to 35 m
- Back yard
- 57.5 mhouse to rear lot line
- Side yards
- 7.2 m and 117 mhouse to side lot lines
- Buildings on the lot
- 31house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 23 City trees in front of this lot. The City's street tree inventory lists 23 trees at this address: elm, american (95 cm), maple, silver (93 cm), basswood, american (85 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 93%53 of 57 decisions
- Garden suite permits
- 2
- Laneway suite permits
- 20
- Multiplex permits
- 22
- Development applications
- 4
Within 300 m, last 10 years. 44 suite and multiplex permits: more than at 98% of Toronto houses (median 3). 57 variance decisions: more than at 90% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing two-and-one-half storey semi-detached dwelling by constructing a rear one-storey ground floor addition with a second storey terrace above, and a new rear ground floor deck with stairs. The existing rear walkout basement, rear enclosed porch with stairs, and rear storage space will be demolished.
679 EUCLID AVE · Oct 21, 2026 · 439 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey detached apartment building (containing eight dwelling units) with a ground floor (south) canopy by constructing a rear four-storey addition with a fourth storey rooftop terrace on the southwest corner of the building (on the roof of the third storey). Also, to permit and to maintain an additional two existing dwelling units within the existing apartment building. The existing garage in the rear yard will be demolished and the existing driveway located at the southwest corner of the lot abutting Lennox Street will be removed. No parking spaces will be provided on-site. There will be a total of 17 residential dwelling units within the apartment building on this lot.
524 PALMERSTON BLVD · Oct 14, 2026 · 354 m away - Minor varianceApproved
To construct a new four-storey apartment building with front and rear basement walkouts, front and rear ground floor landings with stairs, front and rear balconies located on the second and third storeys, and front and rear fourth storey rooftop decks. There will be a total of three short-term bicycle parking spaces at the rear of the main building. Also, to construct a new rear two-storey detached ancillary building (containing one garden suite), including stairs at the west side of the ancillary building. There will be a total of 13 residential dwelling units on this lot (12 dwelling units occupying the apartment building, and one unit occupying the ancillary building).
501 PALMERSTON BLVD · Sep 23, 2026 · 294 m away - Minor varianceApproved
To alter the existing three-storey mixed-used semi-detached building by constructing a rear second storey rooftop deck with a rear exterior staircase, a rear basement walkout, and a rear ground floor patio. Also, to construct a new rear two-storey detached ancillary building (to contain one laneway suite with a basement level and a rooftop deck with rear stairs), abutting Antonio Fernandes Lane and Ulster Street. There will be a total of one commercial unit (laundromat within the main mixed-use building) and six residential dwelling units on this lot (five units within the main mixed-use building and one unit within the ancillary building).
202 LIPPINCOTT ST · Aug 19, 2026 · 369 m away - Minor varianceRefused
To construct a new rear two-storey detached ancillary building containing a one-car garage on the first level and storage space on the second level, abutting Albert Jackson Laneway. The existing rear one-storey detached ancillary building (garage) will be demolished.
110 BRUNSWICK AVE · Aug 12, 2026 · 366 m away
Latest activity nearby
- Zoning review
Closed
34 LENNOX ST · Nov 23, 2026 · 217 m away - Minor variancePending
Application Received
783 BATHURST ST · Nov 23, 2026 · 208 m away - Zoning review
Closed
793 BATHURST ST · Nov 18, 2026 · 243 m away - Zoning review
Not Started
339 LIPPINCOTT ST · Nov 18, 2026 · 166 m away - Zoning review
Not Started
783 BATHURST ST · Nov 16, 2026 · 208 m away - Building permit
REV 01: Revision to permit to add a fourth storey and interior alterations (as bubbled)Proposal to demolish existing building and construct a new 3 storey residential apartment building with 12 units.
501 PALMERSTON BLVD · Nov 16, 2026 · 294 m away - Building permit
Proposal for interior alterations tenant-fit 'Beauty Salon' -
565 BLOOR ST W · Nov 9, 2026 · 261 m away - Building permit
Proposed plumbing installation (handwashing sinks) for beauty studio.
34 LENNOX ST · Nov 9, 2026 · 217 m away - Building permit
Revision No.1: ENCLOSE A SECOND EXISTING SKYLIGHTProposal to enclose existing skylight.
693 BATHURST ST · Nov 2, 2026 · 90 m away - Building permit
Proposal for interior fit-out for CREMMA take-out gelato shop; no customer seating. Main floor and basement: interior alterations, stair/framing/footings, plumbing, HVAC and fire protection work.
597 MARKHAM ST · Oct 30, 2026 · 261 m away
Neighbourhood: University
About the area around the lot, not the lot itself.
- Nearest station
- Bathurst Station5 min walk
- Nearest TTC stop
- Bathurst St at Lennox St2 min walk
- Nearest cycling route
- Lennox StSharrows, 3 min walk
- Nearest traffic count
- 14,360 vehicles in 14 hBathurst St / Lennox St, 150 m away, Jul 25, 2026
- Serious collisions within 500 m
- 52021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
- Parks
- Sally Bird Park3 min walk
- Honest Ed's Park5 min walk
- Seaton Park5 min walk
Schools within 1 km
- CENTRAL TECHNICAL SCHOOL English Public 1 min walk
- CITY AS SCHOOL TORONTO Private 2 min walk
- HARBORD COLLEGIATE INSTITUTE English Public 8 min walk
- PAUL PENNA DOWNTOWN JEWISH DAY SCHOOL & MILES NADAL JEWISH COMMUNITY CENTRE Private 9 min walk
- KING EDWARD JR & SR PUBLIC SCHOOL English Separate 9 min walk
- MONSIGNOR FRASER COLLEGE - ANNEX CAMPUS English Separate 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | University | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $80,000 | $84,500 |
| Households that own their home | 39% | 54% |
| Population (2021) | 6,435 | 16,813 |
| Homes built in 1960 or before | 59% | 29% |
| Homes needing major repairs | 11% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | University | City median |
|---|---|---|
| Assault | 1740.5 | 636.3 |
| Robbery | 133.9 | 69.5 |
| Homicide | 12.2 | 5.3 |
| Auto theft | 182.6 | 192.6 |
| Theft over $5,000 | 121.7 | 46.1 |
| Break and enter | 730.3 | 172.8 |
| Theft from vehicles | 353 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.