HousePrecheckCheck an address

692 Queen St EToronto · zoning, lot size and permit records

Also 690A Queen St E, 690B Queen St E

Commercial residential · CR 2.5 (c2.0; r2.0) SS2 (x2294)15.6 × 36.7 m569 m²on Queen St Ebacks onto Ln N Queen W Broadview

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 14 191162 (Proposal to combine suites 101 and 204 with interconnected stairs in existing 2 storey..., 2014, status Inspection); 12 184182 (Interior alterations to ground floor and basement for medical Clinic. Tenant - "Travel..., 2012, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 7 development applications open within 300 m, up to 15 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • Major Transit Station Area: LeslievilleThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
15.6 m frontage36.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2012

    Needs a closer look

    Still open in the City's records: 14 191162 (Proposal to combine suites 101 and 204 with interconnected stairs in existing 2 storey..., 2014, status Inspection); 12 184182 (Interior alterations to ground floor and basement for medical Clinic. Tenant - "Travel..., 2012, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0225/03TEY (The applicant is seeking relief from the provisions of the Zoning By-law in order to in..., 2003).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 7 development applications open within 300 m

    Good to know

    7 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 15 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit14 191162Inspection

    Proposal to combine suites 101 and 204 with interconnected stairs in existing 2 storey mixed-use building with retail at grade.

    Sep 4, 2014 · 692 QUEEN ST E
  • Building permit12 268995Closed

    To erect and display one illuminated static copy wall sign at the southerly elevation of the building in conjunction with a proposed medical clinic to operate on the premises. **Travel Vaccine Clinic**

    Oct 31, 2012 · 692 QUEEN ST E
  • Building permit12 184182Inspection

    Interior alterations to ground floor and basement for medical Clinic. Tenant - "Travel Vaccine Clinic". Convenience address is 690 A Queen St. E.

    Jul 12, 2012 · 692 QUEEN ST E
  • Building permit10 127427Closed

    Proposal for interior alterations to existing ground floor unit for new dental office. (Dr. Arin Ratavosi)Convenience address is 690 Quen St. E.

    Apr 14, 2010 · 692 QUEEN ST E
  • Building permit08 180450Closed

    Revise location of stairs and increase the size of the decks.

    Nov 27, 2008 · 692 QUEEN ST E
  • Building permit08 118540Closed - Dormant

    permit for installation of new hvac system in existing retail space

    Apr 9, 2008 · 692 QUEEN ST E
  • Zoning review08 113524 LTOClosed
    Feb 25, 2008 · 692 QUEEN ST E
  • Zoning review07 241359 PLOClosed
    Jul 10, 2007 · 692 QUEEN ST E
Show 4 older records
  • Zoning review07 115760 ZPRClosed
    Mar 14, 2007 · 692 QUEEN ST E
  • Minor varianceA0225/03TEYApproved

    The applicant is seeking relief from the provisions of the Zoning By-law in order to increase the number of dwelling units from 1 to 10. Also included in the proposal are interior renovations and a third storey addition to the existing two-storey building with a commercial use on the ground floor and a dwelling unit on the second floor.

    Jun 11, 2003 · 692 QUEEN ST E
  • Zoning review91 026034 LTOClosed
    Jan 24, 1991 · 692 QUEEN ST E
  • Zoning review82 025823 LTOClosed
    Mar 8, 1982 · 692 QUEEN ST E

Check before you build

  • Site-specific exception 900.11.10(2294)

    Needs a closer look

    2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2294)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 348 of former City of Toronto By-law 438-86

  2. Rule B

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  3. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 348 of former City of Toronto By-law 438-86

  4. Older by-law B

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

2 parts for other addresses
  • C On the lands municipally known as 625 Queen St. E., City of Toronto by-law 689-2007.
  • C On the lands municipally known as 625 Queen St. E., City of Toronto by-law 689-2007.
By-law 569-2013, Chapter 900

Lot facts

Area
569 m²
Frontage
15.6 m
Depth
36.7 m
Street
Queen St E
Corner lot
No
Public lane
Ln N Queen W Broadview, 15.6 m along it
Max height
14 m
Max lot coverage
—
  • Major Transit Station Area: Leslieville. The lot is inside the Leslieville Major Transit Station Area approved by the Province (Site and Area Specific Policy 765). Source
  • Zone CR 2.5 (c2.0; r2.0) SS2 (x2294) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: maple, freeman autumn blaze (15 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
94%31 of 33 decisions
Garden suite permits
8
Laneway suite permits
2
Multiplex permits
7
Development applications
17

Within 300 m, last 10 years. 17 suite and multiplex permits: more than at 85% of Toronto houses (median 3). 33 variance decisions: more than at 67% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.

    60 WASCANA AVE · Oct 14, 2026 · 493 m away
  • Minor varianceRefused

    To permit a vehicle dealership use and vehicle service use (Downtown Automatic Group Cadillac) within the existing ground floor commercial unit of the mixed-use building.

    45 BASEBALL PL · May 13, 2026 · 112 m away
  • Minor varianceApproved

    To construct a new six-storey mixed-use building (with stepping down of heights towards the rear lot line), containing 15 residential dwelling units, and one commercial unit (to be located on the ground level).

    786-788 QUEEN ST E · Feb 19, 2025 · 287 m away
  • Minor varianceApproved

    To construct 15 additional residential dwelling units (within the Phase 2 mixed-use building), increasing the total number of permitted dwelling units (as cited in Site Specific Zoning By-laws 1363-2015 and 1364-2015) from 898 units to 913 units.

    677 QUEEN ST E · Sep 14, 2022 · 70 m away
  • Minor varianceApproved

    To alter the interior of the existing three-storey apartment building and construct a rear five-storey addition resulting in a total of 26 units.

    685 QUEEN ST E · May 26, 2021 · 41 m away

Latest activity nearby

  • Zoning review

    Closed

    715 QUEEN ST E · Nov 24, 2026 · 105 m away
  • Building permit

    Proposal to install backflow device and drains.

    34 GRANT ST · Nov 24, 2026 · 176 m away
  • Zoning review

    Not Started

    9 DAVIES AVE · Nov 23, 2026 · 228 m away
  • Building permit

    Proposal to add and relocate sprinklers and fire hose cabinets within Shoppers Drug Mart #9490.

    661 QUEEN ST E · Nov 23, 2026 · 102 m away
  • Building permit

    Foundation Wall Underpinning

    685 QUEEN ST E · Nov 20, 2026 · 41 m away
  • Zoning review

    Application On Hold

    725 QUEEN ST E · Nov 19, 2026 · 123 m away
  • Zoning review

    Application On Hold

    725 QUEEN ST E · Nov 19, 2026 · 123 m away
  • Building permit

    Install rooftop solar panels on top of flat roof.

    50 MATILDA ST · Nov 18, 2026 · 244 m away
  • Building permit

    PROPOSED INTERIOR ALTERATION

    34 GRANT ST · Nov 5, 2026 · 176 m away
  • Building permit

    Revision 02: Shop drawings for exterior cooler/freezer with supporting structure letter. REV 01: Removal of existing mezzanine floorProposal for interior alterations/ fit-up for new McDonalds Restaurant.

    709 QUEEN ST E · Oct 27, 2026 · 85 m away

Neighbourhood: South Riverdale

About the area around the lot, not the lot itself.

Nearest station
Broadview Station34 min walk
Nearest TTC stop
Queen St East at Broadview Ave1 min walk
Nearest cycling route
Lower Don River TrlMulti-Use Trail, 5 min walk
Nearest traffic count
15,685 vehicles in 14 hQueen St E / Broadview Ave, 60 m away, Oct 8, 2025
Serious collisions within 500 m
52021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 2 with cyclists
Parks
Thompson Street Parkette1 min walk
Riverside Common Park2 min walk
Joel Weeks Park2 min walk

Schools within 1 km

  • QUEEN ALEXANDRA MDL SCHOOL English Public 5 min walk
  • SEED ALTERNATIVE SCHOOL English Public 6 min walk
  • DUNDAS JR PUBLIC SCHOOL English Public 6 min walk
  • EASTDALE COLLEGIATE INSTITUTE English Public 13 min walk
  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 13 min walk
  • MORSE STREET JR PUBLIC SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth RiverdaleMedian neighbourhood
Median household income (2020)$100,000$84,500
Households that own their home57%54%
Population (2021)27,81516,813
Homes built in 1960 or before52%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth RiverdaleCity median
Assault828.7636.3
Robbery69.369.5
Shootings3.210.5
Auto theft217.4192.6
Theft over $5,00088.246.1
Break and enter264.7172.8
Theft from vehicles349.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.