HousePrecheckCheck an address

69 Old Mill TerToronto · zoning, lot size and permit records

Residential multiple · RM (f24.0; au116.0)≈ 51.1 × 41.1 m1,723 m²on Old Mill Ter

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 26 rental units, built 1955More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 25 256564 WET 03 OZ (Proposed 34-storey residential building (120 metres), inclusive of a 5-storey base buil..., 2025); 25 256546 WET 03 SA (Proposed 39-storey residential building (135.4 metres), inclusive of a 5-storey base bu..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 39 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
  • 2 open orders or by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 25 270182 PRS 00 IV (Order Issued Property Standards: Height of the guard for the exit stairs are less than..., 2025, status Order Issued); 25 270180 PRS 00 IR (Property Standards, 2025, status Order Issued).
  • City upkeep score: 96 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Old MillThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 51.1 m frontage≈ 41.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 open orders or by-law investigations

    Needs a closer look

    Not resolved in the City's records: 25 270182 PRS 00 IV (Order Issued Property Standards: Height of the guard for the exit stairs are less than..., 2025, status Order Issued); 25 270180 PRS 00 IR (Property Standards, 2025, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Natural Heritage System (4% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 26 233103 PRS 00 IR (Property Standards, 2026); 26 230901 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 256564 WET 03 OZ (Proposed 34-storey residential building (120 metres), inclusive of a 5-storey base buil..., 2025); 25 256546 WET 03 SA (Proposed 39-storey residential building (135.4 metres), inclusive of a 5-storey base bu..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 39 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 96 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 26 units, built 1955).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 233103 PRS 00 IRClosed

    Property Standards

    Sep 5, 2026 · 69 OLD MILL TER
  • By-law investigation26 230901 PRS 00 IRClosed

    Property Standards

    Sep 1, 2026 · 69 OLD MILL TER
  • By-law investigation25 270182 PRS 00 IVOrder Issued

    Order Issued Property Standards: Height of the guard for the exit stairs are less than 1,070 millimetres around landings.; Height of the guard for the exit stairs are less than 920 millimetres measured vertically to the top of the guard from a line drawn through the outside edges of; Required guard does not prevent the passage of a sphere having a diameter more than 100 millimetres.; The guard is designed that a member, attachment or opening located between 140 millimetres and 900 millimetres above the level being protected facilitates climb

    Dec 29, 2025 · 69 OLD MILL TER
  • By-law investigation25 270180 PRS 00 IROrder Issued

    Property Standards

    Dec 29, 2025 · 69 OLD MILL TER
  • Zoning review25 256546 PSPClosed
    Dec 11, 2025 · 69 OLD MILL TER
  • Zoning review25 256564 PRZClosed
    Dec 11, 2025 · 69 OLD MILL TER
  • Development application25 256564 WET 03 OZUnder Review

    Proposed 34-storey residential building (120 metres), inclusive of a 5-storey base building. The proposed building would have a total gross floor area of 24,347.7 square metres and a floor space index of 12.85. 325 new residential units are proposed, including 26 rental-replacement units. 82 vehicular parking spaces in 4 levels of underground parking, as well as 244 bike parking spaces and one Type G loading space are also proposed.

    Nov 20, 2025 · 69 OLD MILL TER · City file
  • Development application25 256546 WET 03 SAUnder Review

    Proposed 39-storey residential building (135.4 metres), inclusive of a 5-storey base building. The proposed building would have a total gross floor area of 27,713.46 square metres and a floor space index of 14.63. 345 new residential units are proposed, as well as 26 rental-replacement units. 82 vehicular parking spaces in 4 levels of underground parking, as well as 279 bike parking spaces and one Type G loading space are also proposed.

    Nov 20, 2025 · 69 OLD MILL TER · City file
Show 1 older records
  • Building permit96 085124Closed

    FIRE ALARM/EXIT RETROFIT TO APT. BLDG.

    Nov 22, 1996 · 69 OLD MILL TER

Lot facts

Area
1,723 m²
Frontage
51.1 mestimated, irregular lot
Depth
41.1 mestimated, irregular lot
Street
Old Mill Ter
Corner lot
No
Public lane
None
House footprint
708 m²roof up to 13.2 m
Back yard
8.9 mhouse to rear lot line
Side yards
3.9 m and 5.1 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
14 m
Max lot coverage
40%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Old Mill. The lot is inside the Old Mill Major Transit Station Area approved by the Province (Site and Area Specific Policy 635). Source
  • Minimum frontage 24 m. Frontage is about 51.1 m (estimated, irregular lot): meets the zone minimum. Source
  • Zone RM (f24.0; au116.0) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: spruce, norway (45 cm), maple, norway (35 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%3 of 3 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the basement storage into residential units.

    2682 BLOOR ST W · Feb 23, 2021 · 198 m away
  • Minor varianceApproved

    To rebuild the existing second and third floor walls above an existing attached garage.

    62 OLD MILL RD · Jan 12, 2017 · 339 m away

Latest activity nearby

  • Building permit

    Interior renovations to lawfully existing dwelling unit in lawfully existing building.

    71-73 OLD MILL RD · Oct 8, 2026 · 208 m away
  • Zoning review

    Notice Sent

    2679 BLOOR ST W · Sep 30, 2026 · 82 m away
  • Zoning review

    Cancelled

    2679 BLOOR ST W · Sep 28, 2026 · 82 m away
  • Zoning review

    Notice Sent

    2679 BLOOR ST W · Sep 28, 2026 · 82 m away
  • Building permitdemolition

    Construct New Single Family Detached stucco and stone house with integral three car garage, outdoor swimming pool and associated landscaping

    76 OLD MILL RD · Jul 8, 2026 · 213 m away
  • Building permitnew building, new house

    Construct New Single Family Detached stucco and stone house with integral three car garage, outdoor swimming pool and associated landscaping

    76 OLD MILL RD · Jul 8, 2026 · 213 m away
  • Minor varianceApproved

    To construct a two-storey rear addition, a second storey rear platform and a deck in the rear yard.

    100 OLD MILL RD · May 14, 2026 · 105 m away
  • Building permit

    Interior finishing of the existing third floor of Paradise Mausoleum at Park Lawn Cemetery.

    2845 BLOOR ST W · May 7, 2026 · 82 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage, and a pool in the front yard.

    76 OLD MILL RD · Jan 29, 2026 · 213 m away
  • Zoning review

    Closed

    69 OLD MILL TER · Dec 11, 2025 · 5 m away

Neighbourhood: Stonegate-Queensway

About the area around the lot, not the lot itself.

Nearest station
Old Mill Station5 min walk
Nearest TTC stop
Bloor St West at The Kingsway1 min walk
Nearest cycling route
Bloor St WCycle Track, 1 min walk
Nearest traffic count
18,444 vehicles in 14 hBloor St W / The Kingsway, 60 m away, May 12, 2026
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Kingsway Gate Parkette1 min walk
King's Mill Park2 min walk
Home Smith Park3 min walk

2021 Census

FigureStonegate-QueenswayMedian neighbourhood
Median household income (2020)$104,000$84,500
Households that own their home63%54%
Population (2021)25,65016,813
Homes built in 1960 or before55%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleStonegate-QueenswayCity median
Assault465.6636.3
Robbery40.869.5
Homicide3.45.3
Shootings13.610.5
Auto theft193.7192.6
Theft over $5,0006846.1
Break and enter217.5172.8
Theft from vehicles129.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.