Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2020
Needs a closer lookStill open in the City's records: 20 119855 (PROPOSED: SITE SERVICING TO BE BROUGHT TO THE LANDS AS A CONDITION OF BASE PARK BY THE..., 2020, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 Committee of Adjustment file on this lot
Good to know1 approved. A0393/02TEY (Create a private parking lot comprised of 17 motor vehicle parking spaces on the existi..., 2002).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)12 development applications open within 300 m
Good to know12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 76 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
6 records on file: more than at 95% of Toronto houses (median 0).
- Building permit20 119855Permit Issued
PROPOSED: SITE SERVICING TO BE BROUGHT TO THE LANDS AS A CONDITION OF BASE PARK BY THE TORONTO PARKS AND RECREATION DEPARTMENT
Mar 10, 2020 · 69 HAYDEN ST - Zoning review09 190509 LPRClosedNov 23, 2009 · 69 HAYDEN ST
- Building permit03 116253Cancelled
to create a 17 stall surface parking lot for staff the Toronto Grace Hospital.
Mar 19, 2003 · 69 HAYDEN ST - Minor varianceA0393/02TEYApproved
Create a private parking lot comprised of 17 motor vehicle parking spaces on the existing vacant site.
Sep 25, 2002 · 69 HAYDEN ST - Zoning review01 205283 PSPClosedDec 27, 2001 · 69 HAYDEN ST
- Building permit01 129009Closed
Demolish residential bld containing 4 units under Section 146-16 of the Municipal code.
Jun 19, 2001 · 69 HAYDEN ST
Check before you build
Site-specific exception 900.11.10(1454)
Needs a closer look1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot . [TO: 438-86; 12 (2) 80]
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 596 m²
- Frontage
- 23.1 m
- Depth
- 26.1 m
- Street
- Hayden St
- Corner lot
- No
- Public lane
- None
- Max height
- 30 m
- Max lot coverage
- —
- Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c1.0; r4.0) SS1 (x1454) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 80%12 of 15 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 2
- Development applications
- 28
Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceRefused
To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.
235 BLOOR ST E · Nov 4, 2026 · 253 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-Law 697-2021(OLT), for a new 50-storey mixed-use building (as approved under Committee of Adjustment Files A0612/23TEY and A0231/25TEY), by increasing the maximum total gross floor area, maximum building height (60.2 m to 61.25 m at the east side portion of the building), altering the minimum building setbacks, and reducing the required bicycle parking spaces. There will be a total of 267 residential dwelling units on this lot.
874 YONGE ST · Aug 5, 2026 · 467 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1050-2015) for the 68-storey mixed-use building (north-east Tower) by increasing the building height from 215 m to 218.6 m (including the height of the mechanical penthouse). Also, to reduce the total number of commercial parking spaces (managed by the Toronto Parking Authority) from 800 to 795 within Parking Levels 1 to 6 (with five parking spaces located on the south-east portion of Parking Level 6 being converted into car wash bays). The existing 196 residential parking spaces on Parking Levels 3 and 4 will be maintained and unaltered.
27-29 YORKVILLE AVE · Jul 15, 2026 · 468 m away - Minor varianceApproved
To alter the development standards for the 50-storey residential building (approved under Site Specific Zoning By-Law 697-2021(OLT)), by increasing the permitted gross floor area, and the permitted encroachment of cladding and other similar façade treatments into the required minimum building setbacks.
874 YONGE ST · May 28, 2025 · 467 m away - Minor varianceApproved
To permit the replacement of 4 new mechanical units.
1 MOUNT PLEASANT RD · Apr 9, 2025 · 321 m away
Latest activity nearby
- Zoning review
Application On Hold
649 YONGE ST · Nov 23, 2026 · 268 m away - Building permit
Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies.
40 ASQUITH AVE · Nov 20, 2026 · 270 m away - Building permit
Proposed interior alterations to an existing office
2 BLOOR ST E · Nov 18, 2026 · 199 m away - Building permit
One wall sign.***SIGNATURE HAIR STUDIO***
665 YONGE ST · Nov 18, 2026 · 254 m away - Building permit
Proposal for interior alterations to an existing office.
2 BLOOR ST E · Nov 17, 2026 · 199 m away - Building permit
Proposal for interior alterations to an existing office space
121 BLOOR ST E · Nov 10, 2026 · 84 m away - Building permit
Proposal to convert the second floor of Da.Si.Mar Shawarma into a coffee shop with a maximum seating capacity of 30 people
673 YONGE ST · Nov 5, 2026 · 248 m away - Minor varianceRefused
To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.
235 BLOOR ST E · Nov 4, 2026 · 253 m away - Building permit
Proposed interior alterations to create a second suite.HERITAGE REQUIRED
123 COLLIER ST · Oct 30, 2026 · 297 m away - Zoning review
Closed
665 YONGE ST · Oct 27, 2026 · 254 m away
Neighbourhood: Church-Wellesley
About the area around the lot, not the lot itself.
- Nearest station
- Bloor Station5 min walk
- Nearest TTC stop
- Bloor St East at Church St2 min walk
- Nearest cycling route
- Bloor St ECycle Track, 2 min walk
- Nearest traffic count
- 7,971 vehicles in 8 hChurch St / Hayden St, 60 m away, Oct 22, 2019
- Serious collisions within 500 m
- 82021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 3 with cyclists
- Parks
- Charles Street Parkette3 min walk
- George Hislop Park3 min walk
- Asquith Green Park4 min walk
Schools within 1 km
- HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 1 min walk
- THE ABELARD CENTRE FOR EDUCATION Private 6 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 8 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 8 min walk
- JARVIS COLLEGIATE INSTITUTE English Public 10 min walk
- BRANKSOME HALL GIRLS SCHOOL Private 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Church-Wellesley | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $60,400 | $84,500 |
| Households that own their home | 24% | 54% |
| Population (2021) | 22,320 | 16,813 |
| Homes built in 1960 or before | 15% | 29% |
| Homes needing major repairs | 5% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Church-Wellesley | City median |
|---|---|---|
| Assault | 1264.6 | 636.3 |
| Robbery | 93.2 | 69.5 |
| Homicide | 3.3 | 5.3 |
| Auto theft | 46.6 | 192.6 |
| Theft over $5,000 | 106.5 | 46.1 |
| Break and enter | 146.4 | 172.8 |
| Theft from vehicles | 206.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.