HousePrecheckCheck an address

689 Evans AveToronto · zoning, lot size and permit records

Employment · E 1.054.8 × 68.8 m3,407 m²on Sherway Gtcorner, also on Evans Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 24 214611 (EMERGENCY REPAIR TO MASONRY PIER AND WINDOW REPLACEMENT; REFER TO "ORDER TO REMEDY UNSA..., 2024, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
N20 m
54.8 m frontage68.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2024

    Needs a closer look

    Still open in the City's records: 24 214611 (EMERGENCY REPAIR TO MASONRY PIER AND WINDOW REPLACEMENT; REFER TO "ORDER TO REMEDY UNSA..., 2024, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation25 270292 WST 00 IRClosed

    Waste

    Dec 29, 2025 · 689 EVANS AVE
  • Building permit24 214611Permit Issued

    EMERGENCY REPAIR TO MASONRY PIER AND WINDOW REPLACEMENT; REFER TO "ORDER TO REMEDY UNSAFE BUILDING" ORDER NUMBER 24 205019 UNS 00 VI

    Oct 3, 2024 · 689 EVANS AVE
  • Building permit24 192007Closed

    Application for a permit to erect and display one first party wall sign, displaying static copy and illuminated, erected at the first storey. Dimensions:Wall sign: 1.98m L x 2.22W x 0.15 at a height of 8.09 on the south elevation.**TD bank**

    Aug 6, 2024 · 689 EVANS AVE
  • Building permit19 191867Closed

    To erect and display one illuminated ground sign.****TD****

    Jul 22, 2019 · 689 EVANS AVE
  • Building permit15 105960Closed

    One inch back flow preventer

    Jan 20, 2015 · 689 EVANS AVE
  • Building permit01 140640Closed - Dormant

    Interior alterations to existing ( TD Bank ). Plumbing & HVAC included.

    Jun 4, 2001 · 689 EVANS AVE

Lot facts

Area
3,407 m²
Frontage
54.8 m
Depth
68.8 m
Street
Sherway Gt
Corner lot
Yes, also on Evans Ave68.8 m along it
Public lane
None
House footprint
418 m²roof up to 10.7 m
Back yard
25.4 mhouse to rear lot line
Side yards
13.3 m and 24.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 019. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Sherway Area Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
50%2 of 4 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
1
Development applications
5

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal for interior renovations and exterior facade renovation to an existing Tim Horton's restaurant

    200 SHERWAY DR · Oct 8, 2026 · 271 m away
  • Zoning review

    Closed

    690 EVANS AVE · May 20, 2026 · 131 m away
  • Zoning review

    Closed

    1 HELSBY CRES · Mar 26, 2026 · 216 m away
  • Building permit

    Proposed unheated detached garage

    7 RUFFORD RD · Feb 5, 2026 · 288 m away
  • Building permit

    Proposal to construct new detached garage

    7 RUFFORD RD · Jan 19, 2026 · 288 m away
  • Building permit

    Proposed installation of backwater valve

    12 HELSBY CRES · Nov 14, 2025 · 252 m away
  • Minor varianceApproved

    To construct a new detached garage in the rear yard. The existing vinyl shed in the rear yard will be demolished.

    7 RUFFORD RD · Oct 23, 2025 · 288 m away
  • Zoning review

    Closed

    7 RUFFORD RD · Jul 14, 2025 · 288 m away
  • Building permit

    Proposal for a unheated detached garage.

    7 RUFFORD RD · Jun 17, 2025 · 288 m away
  • Building permitgarden suite

    NEW WOOD FRAME GARDEN SUITE IN REAR YARD.

    17 HELSBY CRES · Apr 17, 2025 · 189 m away

Neighbourhood: Etobicoke City Centre

About the area around the lot, not the lot itself.

Nearest station
Long Branch GO Station34 min walk
Nearest TTC stop
Evans Ave at Sherway Gate West Side1 min walk
Nearest cycling route
Etobicoke Creek TrlMulti-Use Trail, 7 min walk
Nearest traffic count
21,275 vehicles in 14 hEvans Ave / Sherway Gt, 50 m away, Apr 16, 2025
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Bisset Park2 min walk
Etobicoke Valley Park5 min walk
Trca Lands ( 82)7 min walk

Schools within 1 km

  • ST AMBROSE CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • LANOR JR MDL SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEtobicoke City CentreMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home50%54%
Population (2021)23,60016,813
Homes built in 1960 or before9%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEtobicoke City CentreCity median
Assault844.4636.3
Robbery187.769.5
Shootings16.210.5
Auto theft601.8192.6
Theft over $5,000200.646.1
Break and enter210.3172.8
Theft from vehicles278.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.