HousePrecheckCheck an address

68 Shuter StToronto · zoning, lot size and permit records

Also 64 Shuter St, 65 Dalhousie St, 70 Shuter St, 72 Shuter St

29.0 × 31.4 m905 m²on Shuter Stcorner, also on Dalhousie St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 19 128320 (Interior alerations from water damage (repairs limited to certain area - floors 1-4) to..., 2019, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 11 development applications open within 300 m, up to 71 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
29.0 m frontage31.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2019

    Needs a closer look

    Still open in the City's records: 19 128320 (Interior alerations from water damage (repairs limited to certain area - floors 1-4) to..., 2019, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 26 239267 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0069/16TEY (To modify the development plan for the 26-storey mixed use building with three-storey p..., 2016); A0360/14TEY (To alter the dimensions of 6 parking spaces of the redevelopment plan for the 24-storey..., 2014).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 11 development applications open within 300 m

    Good to know

    11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

19 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 239267 PRS 00 IRClosed

    Property Standards

    Sep 17, 2026 · 68 SHUTER ST
  • Building permit19 128320Permit Issued

    Interior alerations from water damage (repairs limited to certain area - floors 1-4) to existing building

    Mar 22, 2019 · 68 SHUTER ST
  • Building permit17 220476Closed

    In conjunction with a multi-storey building on the premises, proposal to erect and display one non-illuminated wall sign displaying static copy, located on the first storey west elevation. The proposed sign is 0.32 metres vertically by 1.5 metres horizontally at a height of 3.93 metres above grade.** MAST COFFEE**

    Oct 4, 2017 · 68 SHUTER ST
  • Building permit17 147254Closed

    Interior alterations to a new unit on ground floor - Cafe

    May 15, 2017 · 68 SHUTER ST
  • Building permit14 169786Closednew building

    REV - 02 for fire services

    Feb 23, 2017 · 68 SHUTER ST
  • Building permit16 249289Closed

    Proposal to install 1 maglock on the main door from the ground floor lobby to the loading dock.

    Nov 10, 2016 · 68 SHUTER ST
  • Minor varianceA0069/16TEYApproved

    To modify the development plan for the 26-storey mixed use building with three-storey podium and underground parking, approved under Site Specific By-law 86-2014 (OMB), by converting 13 of the existing visitor parking spaces into commercial parking spaces.

    Apr 20, 2016 · 64 SHUTER ST
  • Development application16 128717 STE 27 CDClosed

    Draft Plan of Condominium: 221 dwelling units, 1 retail unit, 64 parking spaces

    Mar 16, 2016 · 64 SHUTER ST
Show 11 older records
  • Zoning review15 259746 ZPRClosed
    Dec 2, 2015 · 64 SHUTER ST
  • Zoning review15 187167 ZPRClosed
    Jul 8, 2015 · 64 SHUTER ST
  • Building permit15 170829Approved

    Alternative solution for a new standpipe in the stairway.

    Jun 9, 2015 · 68 SHUTER ST
  • Building permit14 197804Closeddemolition

    Proposal to demolish the existing residential building to construct a new condo (Core Condos)

    Aug 26, 2014 · 70 SHUTER ST
  • Building permit14 197802Closeddemolition

    Proposal to demolish the existing residential building to construct a new condo (Core Condos)

    Aug 26, 2014 · 68 SHUTER ST
  • Building permit14 197795Closeddemolition

    Proposal to demolish the existing residential building to construct a new condo (Core Condos)

    Aug 26, 2014 · 64 SHUTER ST
  • Minor varianceA0360/14TEYApproved

    To alter the dimensions of 6 parking spaces of the redevelopment plan for the 24-storey mixed-use condominium with retail at grade, approved under Site Specific By-law 86-2014 (OMB).

    Jun 25, 2014 · 64 SHUTER ST
  • Zoning review14 111369 PSPClosed
    May 1, 2014 · 64 SHUTER ST
  • Development application14 107073 000 00 SAClosed

    Redevelopment of the existing properties municpally known as 64-70 Shuter street for the purposes of a new mixed use building, 24 stories above grade complete with 233 dwelling units and ground floor retail - 83 parking spaces for residents are proposed to be provided in 5 levels below grade parking facility.

    Jan 21, 2014 · 68 SHUTER ST
  • Zoning review12 197601 PRZClosed
    Jun 21, 2012 · 64 SHUTER ST
  • Development application12 193153 STE 27 OZClosed

    Redevelopment of the existing properties municpally known as 64-70 Shuter street for the purposes of a new mixed use building, 28 stories above grade complete with 213 dwelling units and ground floor retail - 83 parking spaces for residents are proposed to be provided in 5 levels below grade parking facility.

    Jun 14, 2012 · 64 SHUTER ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
905 m²
Frontage
29 m
Depth
31.4 m
Street
Shuter St
Corner lot
Yes, also on Dalhousie St31.4 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    97%30 of 31 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    13
    Development applications
    49

    Within 300 m, last 10 years. 13 suite and multiplex permits: more than at 80% of Toronto houses (median 3). 31 variance decisions: more than at 64% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.

      212 DUNDAS ST E · Jul 15, 2026 · 337 m away
    • Minor varianceApproved

      To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).

      30 BOND ST · Jan 21, 2026 · 234 m away
    • Minor varianceApproved

      To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

      134 JARVIS ST · Nov 12, 2025 · 179 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

      53 A MUTUAL ST · Oct 1, 2025 · 70 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.

      53 MUTUAL ST · Oct 1, 2025 · 80 m away

    Latest activity nearby

    • Minor variancePending

      To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.

      60 QUEEN ST E · Dec 16, 2026 · 204 m away
    • Building permit

      Proposal to install a maglock and access control system on the 8th-floor door.

      30 BOND ST · Nov 25, 2026 · 234 m away
    • Building permit

      Proposal for interior alterations with mechanical, plumbing, and electrical work to suit new layout on floor 4.

      99 QUEEN ST E · Nov 20, 2026 · 235 m away
    • Building permit

      Proposal to replace existing pre-action system fire control panel and associated initiating field devices.

      30 BOND ST · Nov 19, 2026 · 234 m away
    • Building permit

      Sprinklers related to 25-195702 BLD

      30 BOND ST · Nov 2, 2026 · 234 m away
    • Zoning review

      Closed

      78 MUTUAL ST · Oct 28, 2026 · 74 m away
    • Building permit

      INTERIOR ALTERATIONS WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUIT NEW LAYOUT

      111 QUEEN ST E · Oct 26, 2026 · 236 m away
    • Zoning review

      Not Started

      207 JARVIS ST · Oct 21, 2026 · 166 m away
    • Building permit

      Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room

      25 MUTUAL ST · Oct 19, 2026 · 144 m away
    • Zoning review

      Closed

      88 QUEEN ST E · Oct 14, 2026 · 196 m away

    Neighbourhood: Downtown Yonge East

    About the area around the lot, not the lot itself.

    Nearest station
    Queen Station7 min walk
    Nearest TTC stop
    Dundas St East at Church St3 min walk
    Nearest cycling route
    Shuter StCycle Track, 1 min walk
    Nearest traffic count
    10,895 vehicles in 14 hMutual St / Shuter St, 60 m away, Oct 27, 2026
    Serious collisions within 500 m
    212021–2026, killed or seriously injured: 3 fatal, 15 with pedestrians, 1 with cyclists
    Parks
    Arena Gardens1 min walk
    45 Dalhousie St Park1 min walk
    Moss Park4 min walk

    Schools within 1 km

    • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 3 min walk
    • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 3 min walk
    • ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 3 min walk
    • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 3 min walk
    • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 5 min walk
    • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 5 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureDowntown Yonge EastMedian neighbourhood
    Median household income (2020)$69,500$84,500
    Households that own their home36%54%
    Population (2021)17,70016,813
    Homes built in 1960 or before7%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleDowntown Yonge EastCity median
    Assault2360.8636.3
    Robbery143.369.5
    Shootings11.910.5
    Auto theft75.6192.6
    Theft over $5,00099.546.1
    Break and enter274.7172.8
    Theft from vehicles390.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.