HousePrecheckCheck an address

677 College StToronto · zoning, lot size and permit records

Commercial residential · CR 3.0 (c1.0; r2.5) SS2 (x2437)16.2 × 37.8 m539 m²on College Stcorner, also on Beatrice Stbacks onto Ln S College E Montrose

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 32 rental units, built 1912More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • City upkeep score: 91 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
16.2 m frontage37.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 5 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 259389 PRS 00 IR (Property Standards, 2026); 26 230967 PRS 00 IR (Property Standards, 2026); 26 172587 000 00 IR (Adequate Heat, 2026); and 2 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Rental building evaluation: 91 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (3 storeys, 32 units, built 1912).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • By-law investigation26 259389 PRS 00 IRClosed

    Property Standards

    Oct 23, 2026 · 677 COLLEGE ST
  • By-law investigation26 230967 PRS 00 IRClosed

    Property Standards

    Sep 1, 2026 · 677 COLLEGE ST
  • By-law investigation26 172587 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 677 COLLEGE ST
  • By-law investigation26 172586 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 677 COLLEGE ST
  • By-law investigation26 168554 GRA 00 IVClosed

    Notice Issued Graffiti

    May 26, 2026 · 677 COLLEGE ST
  • By-law investigation26 167818 GRA 00 IRClosed

    Graffiti

    May 26, 2026 · 677 COLLEGE ST
  • By-law investigation25 208670 PRS 00 IRClosed

    Property Standards

    Aug 12, 2025 · 677 COLLEGE ST
  • Zoning review85 026337 LTOClosed
    Jan 22, 1985 · 677 COLLEGE ST

Check before you build

  • Site-specific exception 900.11.10(2437)

    Needs a closer look

    3 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2437)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270 (a) of former City of Toronto By-law 438-86

  2. Rule B

    Section 12(2) 318 of former City of Toronto By-law 438-86

  3. Rule C

    City of Toronto by-law 537-2005

  4. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270 (a) of former City of Toronto By-law 438-86

  5. Older by-law B

    Section 12(2) 318 of former City of Toronto By-law 438-86

  6. Older by-law C

    City of Toronto by-law 537-2005

10 parts for other addresses
  • D On 72 Clinton St., former City of Toronto by-law 200-85
  • E On 593 College St., former City of Toronto by-law 232-77
  • F On 622 College St., former City of Toronto by-law 200-85
  • G On 650 College St., former City of Toronto by-law 739-81
  • H On 200 Montrose Ave., former City of Toronto by-laws 319-78 and 519-79.
  • D On 72 Clinton St., former City of Toronto by-law 200-85
  • E On 593 College St., former City of Toronto by-law 232-77
  • F On 622 College St., former City of Toronto by-law 200-85
  • G On 650 College St., former City of Toronto by-law 739-81
  • H On 200 Montrose Ave., former City of Toronto by-laws 319-78 and 519-79.
By-law 569-2013, Chapter 900

Lot facts

Area
539 m²
Frontage
16.2 m
Depth
37.8 m
Street
College St
Corner lot
Yes, also on Beatrice St37.8 m along it
Public lane
Ln S College E Montrose, 16.3 m along it
House footprint
387 m²roof up to 11 m
Back yard
0.7 mhouse to rear lot line
Side yards
0 m and 0.3 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone CR 3.0 (c1.0; r2.5) SS2 (x2437) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
94%61 of 65 decisions
Garden suite permits
1
Laneway suite permits
14
Multiplex permits
18
Development applications
0

Within 300 m, last 10 years. 33 suite and multiplex permits: more than at 95% of Toronto houses (median 3). 65 variance decisions: more than at 94% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the existing three-storey mixed-use building into a commercial building by converting the existing second floor storage space and third floor residential dwelling unit into commercial use (office spaces). There will be no residential dwelling units on this lot.

    646 COLLEGE ST · Jun 17, 2026 · 108 m away
  • Minor varianceApproved

    To convert the existing three-storey mixed-use building into a residential apartment building, and to construct a rear ground floor patio. There will be a total of six residential dwelling units on this lot (one unit within the basement, one unit on the ground level, two units on the second level, and two units on the third level). Also, four long-term bicycle parking spaces will be provided.

    647 COLLEGE ST · Aug 13, 2025 · 122 m away
  • Minor varianceApproved

    To maintain the existing five-storey office-use building.

    559 COLLEGE ST · Apr 26, 2023 · 411 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building (containing an at-grade resturant and 4 residential dwelling units) by constructing a complete fourth storey addition. This mixed-use building will contain a total of 12 hotel suites and retail uses.

    690 COLLEGE ST · Jun 8, 2022 · 64 m away
  • Minor varianceApproved

    To construct a pergola (including a louver system), on the rooftop terrace of the 6-storey mixed-use condominium building, for the exclusive use of Suite 602 (easterly portion of the roof top level).

    799 COLLEGE ST · Jan 12, 2022 · 294 m away

Latest activity nearby

  • Building permit

    Interior partition alterations to enlarge coat check and relocate manager's office.Add raised platform along one side of main hall for V.I.P. seating.

    722 COLLEGE ST · Nov 13, 2026 · 172 m away
  • Zoning review

    Closed

    654 COLLEGE ST · Nov 6, 2026 · 84 m away
  • Building permit

    Proposed is a 55 sqm interior alteration to remodel the kitchen and powder room on first floor, as well as bathroom on the second floor and a wall removal on the third floor

    475 SHAW ST · Nov 5, 2026 · 279 m away
  • Building permitsecondary suite

    Proposal to replace front concrete steps.

    188 BEATRICE ST · Oct 29, 2026 · 117 m away
  • Building permit

    Proposed to convert garage to an office and expand the floating rear deck

    452 CRAWFORD ST · Oct 28, 2026 · 277 m away
  • Building permitmultiplex, secondary suite

    INTERIOR ALTERATIONS TO THE BASEMENT AND 1ST FLOOR TO CONVERT DWELLING INTO A DUPLEX.See also 26 175214 ZAP

    147 BEATRICE ST · Oct 28, 2026 · 116 m away
  • Zoning review

    Notice Sent

    218 MONTROSE AVE · Oct 20, 2026 · 176 m away
  • Building permit

    Interior alterations to ground floor retail unit including associated plumbing work.

    776 COLLEGE ST · Oct 19, 2026 · 274 m away
  • Zoning review

    Notice Sent

    684 COLLEGE ST · Oct 9, 2026 · 54 m away
  • Building permit

    2 wall signs**SCOTIABANK**

    643 COLLEGE ST · Oct 8, 2026 · 131 m away

Neighbourhood: Trinity-Bellwoods

About the area around the lot, not the lot itself.

Nearest station
Christie Station17 min walk
Nearest TTC stop
College St at Grace St2 min walk
Nearest cycling route
College StSharrows - Arterial, 1 min walk
Nearest traffic count
7,551 vehicles in 8 hCollege St / Montrose Ave (East), 50 m away, Jul 12, 1999
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 2 with cyclists
Parks
Grace - College Parkette2 min walk
Fred Hamilton Playground4 min walk
George Ben Park6 min walk

Schools within 1 km

  • ST FRANCIS OF ASSISI CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
  • CLINTON STREET JR PUBLIC SCHOOL English Public 6 min walk
  • ECOLE ELEMENTAIRE PIERRE ELLIOTT TRUDEAU French Public 7 min walk
  • MONTROSE JR & DELTA ALTERNATIVE SR English Public 7 min walk
  • POPE FRANCIS CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
  • OSSINGTON OLD ORCHARD JR PUBLIC SCHOOL English Public 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureTrinity-BellwoodsMedian neighbourhood
Median household income (2020)$92,000$84,500
Households that own their home56%54%
Population (2021)15,41516,813
Homes built in 1960 or before68%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleTrinity-BellwoodsCity median
Assault946.7636.3
Robbery58.469.5
Shootings5.810.5
Auto theft76192.6
Theft over $5,00070.146.1
Break and enter350.6172.8
Theft from vehicles280.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.