Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 674 Manning Ave
674 Manning Ave is on a 7.8 m by 37.9 m lot on Manning Ave in Annex. The zoning is R.
The City has 4 records on this lot since 2021. That is more than at 88% of Toronto houses. In 2024, a building permit was filed: "Rev#1: adding 2 additional units to create a total of 4 units. proposed new three storey detached duplex house, with a rear basement walkout. (existing house…". Status: closed. In 2023, a building permit was filed: "To demolish existing dwelling and construct a new three storey dwelling, third floor balcony, rear basement walkout for a two unit dwelling". Status: closed. In 2022, a Committee of Adjustment application was filed: "To construct a new three-storey duplex with a front porch, a front second storey balcony, a front third storey balcony, and a rear basement walkout. also, to…". Status: closed. Nothing on file is open right now.
No development applications are open within 300 m. Christie station is a 3-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Records mention multiplex, second unitModerateFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Garden suite · Laneway suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Records mention multiplex, second unit
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Records mention multiplex, second unit
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
4 records on file, more than at 88% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2024-10-03 | Building permit22 185140 | REV#1: ADDING 2 ADDITIONAL UNITS TO CREATE A TOTAL OF 4 UNITS. Proposed New Three Storey Detached Duplex House, with a rear Basement Walkout. (Existing House will be demolished). | Closed | |
| 2023-04-03 | Building permit22 185145 | To demolish existing dwelling and construct a new three storey dwelling, third floor balcony, rear basement walkout for a two unit dwelling | Closed | |
| 2022-03-23 | Minor varianceA1435/21TEY | To construct a new three-storey duplex with a front porch, a front second storey balcony, a front third storey balcony, and a rear basement walkout. Also, to permit three parking spaces in the rear yard, abutting the laneway. | Approved | |
| 2021-07-13 | Zoning review21 183315 ZZC | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex, second unit
- Garden suite: likely fits
- Laneway suite: likely fits
What this part means for this house, in plain EnglishUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
Laneway suite
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d0.6)
- Height limit
- 11 m
- Corner lot
- No
- Public lane
- Ln N Bloor W Manning, 7.8 m along it
- New house permit
- 2024
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application within 300 m in 10 years, none open
- In the Christie station area
- 43 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Theft over $5,000: 2.5 times the Toronto median
- Break and enter: 2.2 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Annex neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Christie StationNearest station3 min walk
- Christie Station - Eastbound PlatformNearest TTC stop1 min walk
- Bloor St WNearest cycling route1 min walk
- West End Alternative SchoolSchool6 min walk
- Monsignor Fraser College - Annex CampusSchool6 min walk
- Palmerston Avenue Jr Public SchoolSchool7 min walk
- Harbord Collegiate InstituteSchool7 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31080.9
- Robberycity median 69.580.5
- Homicidecity median 5.35.2
- Shootingscity median 10.55.2
- Auto theftcity median 192.6116.9
- Theft over $5,000city median 46.1114.3
- Break and entercity median 172.8387.1
- Theft from vehiclescity median 188.1220.9
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist