HousePrecheckCheck an address

672 College StToronto · zoning, lot size and permit records

Also 163 Beatrice St, 674 College St, 676 College St, 678 College St

Commercial residential · CR 3.0 (c1.0; r2.5) SS2 (x2437)≈ 13.0 × 21.3 m169 m²on Beatrice Stcorner, also on College St

Not a home

A commercial or mixed-use building

5 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N5 m
≈ 13.0 m frontage≈ 21.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    18 records on file: more than at 100% of Toronto houses (median 0).

    • Zoning review17 125340 LTOClosed
      Mar 7, 2017 · 676 COLLEGE ST
    • By-law investigation13 196977 WST 00 IRNotice Issued

      Waste

      Jul 2, 2013 · 678 COLLEGE ST
    • By-law investigation13 147043 WST 00 IRNotice Issued

      Waste

      Apr 9, 2013 · 672 COLLEGE ST
    • Building permit11 106379Closed

      Revision to kitchen exhaust and make up air under originally approved permit 11-106379 MSA.

      Apr 13, 2011 · 672 COLLEGE ST
    • Building permit11 106397Closed

      Proposal to install one wash basin to take out restaurant. Tenant is Pita 2 Go. See 11-106379.

      Jan 17, 2011 · 672 COLLEGE ST
    • Zoning review10 300575 LTOClosed
      Nov 22, 2010 · 672 COLLEGE ST
    • Zoning review10 145743 LTOClosed
      Apr 6, 2010 · 672 COLLEGE ST
    • Building permit07 179367Closed

      Proposal to construct entrance door swinging onto street, installation of curtain wall, and new stair to upper floor. See Right of Way Management Application and receipt # 59878.

      Nov 22, 2007 · 672-674 COLLEGE ST
    Show 10 older records
    • Zoning review07 130557 LPRClosed
      Mar 30, 2007 · 672-674 COLLEGE ST
    • Building permit07 113415Closed

      Proposal to replace store front glazing & entrance door only. No structural alterations. Convenience address - 678 College St. Tenant - "Mr. Sub".

      Mar 7, 2007 · 672-674 COLLEGE ST
    • Building permit06 178247Closed - Dormant

      Plumbing - Interior partition walls with millwork .

      Oct 27, 2006 · 672-674 COLLEGE ST
    • Zoning review06 144995 LTOClosed
      Jun 9, 2006 · 672-674 COLLEGE ST
    • Zoning review97 025952 LTOClosed
      Feb 20, 1997 · 672-674 COLLEGE ST
    • Zoning review96 024680 LTOClosed
      Mar 8, 1996 · 676 COLLEGE ST
    • Zoning review94 024871 LTOClosed
      May 3, 1994 · 678 COLLEGE ST
    • Zoning review87 029996 LTOClosed
      Mar 26, 1987 · 674 COLLEGE ST
    • Zoning review85 026940 LTOClosed
      Sep 13, 1985 · 672-674 COLLEGE ST
    • Zoning review84 026862 LTOClosed
      Sep 25, 1984 · 672-674 COLLEGE ST

    Check before you build

    • Site-specific exception 900.11.10(2437)

      Needs a closer look

      3 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

      Zoning By-law 569-2013, Chapter 900
    Exception 900.11.10(2437)Applies

    These parts of the exception apply to this lot's address.

    1. Rule A

      These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270 (a) of former City of Toronto By-law 438-86

    2. Rule B

      Section 12(2) 318 of former City of Toronto By-law 438-86

    3. Rule C

      City of Toronto by-law 537-2005

    4. Older by-law A

      These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270 (a) of former City of Toronto By-law 438-86

    5. Older by-law B

      Section 12(2) 318 of former City of Toronto By-law 438-86

    6. Older by-law C

      City of Toronto by-law 537-2005

    10 parts for other addresses
    • D On 72 Clinton St., former City of Toronto by-law 200-85
    • E On 593 College St., former City of Toronto by-law 232-77
    • F On 622 College St., former City of Toronto by-law 200-85
    • G On 650 College St., former City of Toronto by-law 739-81
    • H On 200 Montrose Ave., former City of Toronto by-laws 319-78 and 519-79.
    • D On 72 Clinton St., former City of Toronto by-law 200-85
    • E On 593 College St., former City of Toronto by-law 232-77
    • F On 622 College St., former City of Toronto by-law 200-85
    • G On 650 College St., former City of Toronto by-law 739-81
    • H On 200 Montrose Ave., former City of Toronto by-laws 319-78 and 519-79.
    By-law 569-2013, Chapter 900

    Lot facts

    Area
    169 m²
    Frontage
    13 mestimated, irregular lot
    Depth
    21.3 mestimated, irregular lot
    Street
    Beatrice St
    Corner lot
    Yes, also on College St21.3 m along it
    Public lane
    None
    House footprint
    79 m²roof up to 11.7 m
    Back yard
    0 mhouse to rear lot line
    Side yards
    0 m and 3.3 mhouse to side lot lines; 0 is a shared wall
    Buildings on the lot
    2house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone CR 3.0 (c1.0; r2.5) SS2 (x2437) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

    Around this lot

    Minor variances approved
    94%62 of 66 decisions
    Garden suite permits
    0
    Laneway suite permits
    14
    Multiplex permits
    20
    Development applications
    0

    Within 300 m, last 10 years. 34 suite and multiplex permits: more than at 96% of Toronto houses (median 3). 66 variance decisions: more than at 95% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To convert the existing three-storey mixed-use building into a commercial building by converting the existing second floor storage space and third floor residential dwelling unit into commercial use (office spaces). There will be no residential dwelling units on this lot.

      646 COLLEGE ST · Jun 17, 2026 · 71 m away
    • Minor varianceApproved

      To convert the existing three-storey mixed-use building into a residential apartment building, and to construct a rear ground floor patio. There will be a total of six residential dwelling units on this lot (one unit within the basement, one unit on the ground level, two units on the second level, and two units on the third level). Also, four long-term bicycle parking spaces will be provided.

      647 COLLEGE ST · Aug 13, 2025 · 101 m away
    • Minor varianceApproved

      To maintain the existing five-storey office-use building.

      559 COLLEGE ST · Apr 26, 2023 · 375 m away
    • Minor varianceApproved

      To alter the existing three-storey mixed-use building (containing an at-grade resturant and 4 residential dwelling units) by constructing a complete fourth storey addition. This mixed-use building will contain a total of 12 hotel suites and retail uses.

      690 COLLEGE ST · Jun 8, 2022 · 74 m away
    • Minor varianceApproved

      To construct a pergola (including a louver system), on the rooftop terrace of the 6-storey mixed-use condominium building, for the exclusive use of Suite 602 (easterly portion of the roof top level).

      799 COLLEGE ST · Jan 12, 2022 · 336 m away

    Latest activity nearby

    • Building permit

      Interior partition alterations to enlarge coat check and relocate manager's office.Add raised platform along one side of main hall for V.I.P. seating.

      722 COLLEGE ST · Nov 13, 2026 · 201 m away
    • Zoning review

      Closed

      654 COLLEGE ST · Nov 6, 2026 · 45 m away
    • Building permit

      Proposed is a 55 sqm interior alteration to remodel the kitchen and powder room on first floor, as well as bathroom on the second floor and a wall removal on the third floor

      475 SHAW ST · Nov 5, 2026 · 300 m away
    • Building permitsecondary suite

      Proposal to replace front concrete steps.

      188 BEATRICE ST · Oct 29, 2026 · 102 m away
    • Building permit

      Proposed to convert garage to an office and expand the floating rear deck

      452 CRAWFORD ST · Oct 28, 2026 · 288 m away
    • Building permitmultiplex, secondary suite

      INTERIOR ALTERATIONS TO THE BASEMENT AND 1ST FLOOR TO CONVERT DWELLING INTO A DUPLEX.See also 26 175214 ZAP

      147 BEATRICE ST · Oct 28, 2026 · 117 m away
    • Zoning review

      Notice Sent

      218 MONTROSE AVE · Oct 20, 2026 · 184 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey storey semi-detached by constructing a rear second storey addition (cantilevered at the northeast corner of the dwelling), a rear third storey addition with a deck (above the second storey roof), and a rear ground floor deck with stairs.

      235 GRACE ST · Oct 14, 2026 · 263 m away
    • Zoning review

      Notice Sent

      684 COLLEGE ST · Oct 9, 2026 · 51 m away
    • Building permit

      2 wall signs**SCOTIABANK**

      643 COLLEGE ST · Oct 8, 2026 · 111 m away

    Neighbourhood: Palmerston-Little Italy

    About the area around the lot, not the lot itself.

    Nearest station
    Christie Station16 min walk
    Nearest TTC stop
    College St at Grace St2 min walk
    Nearest cycling route
    College StSharrows - Arterial, 1 min walk
    Nearest traffic count
    7,551 vehicles in 8 hCollege St / Montrose Ave (East), 80 m away, Jul 12, 1999
    Serious collisions within 500 m
    42021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 2 with cyclists
    Parks
    Grace - College Parkette2 min walk
    Fred Hamilton Playground5 min walk
    Art Eggleton Park7 min walk

    Schools within 1 km

    • ST FRANCIS OF ASSISI CATHOLIC ELEMENTARY SCHOOL English Separate 3 min walk
    • CLINTON STREET JR PUBLIC SCHOOL English Public 6 min walk
    • MONTROSE JR & DELTA ALTERNATIVE SR English Public 7 min walk
    • ECOLE ELEMENTAIRE PIERRE ELLIOTT TRUDEAU French Public 7 min walk
    • CENTRAL TORONTO ACADEMY & HORIZON ALTERNATIVE SR English Public 8 min walk
    • POPE FRANCIS CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigurePalmerston-Little ItalyMedian neighbourhood
    Median household income (2020)$88,000$84,500
    Households that own their home42%54%
    Population (2021)13,12016,813
    Homes built in 1960 or before73%29%
    Homes needing major repairs9%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peoplePalmerston-Little ItalyCity median
    Assault654.6636.3
    Robbery113.869.5
    Shootings7.110.5
    Auto theft113.8192.6
    Theft over $5,00028.546.1
    Break and enter256.2172.8
    Theft from vehicles142.3188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 29, 2026, published Nov 27, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
    • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
    • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
    • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
    • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
    • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
    • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
    • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.