HousePrecheckCheck an address

671 Fleet StToronto · zoning, lot size and permit records

≈ 74.7 × 112.9 m6,144 m²on Angelique Stcorner, also on Fleet St

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 2 development applications open within 300 mNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
N20 m
≈ 74.7 m frontage≈ 112.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
6,144 m²
Frontage
74.7 mestimated, irregular lot
Depth
112.9 mestimated, irregular lot
Street
Angelique St
Corner lot
Yes, also on Fleet St112.9 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: maple, silver (25 cm), maple, silver (25 cm), maple, silver (25 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
4

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the redevelopment plan for the 29 storey mixed-use building by reducing the total required number of parking spaces for the exclusive use of visitors to the residential units.

    30 ORDNANCE ST · Nov 18, 2020 · 456 m away
  • Minor varianceApproved

    To permit a gym (commercial school use) on the ground floor of an existing 35-storey condominium building.

    600 FLEET ST · Jan 23, 2019 · 483 m away
  • Minor varianceApproved

    To alter the redevelopment plan approved under site-specific zoning by-law 818-2015 for two residential towers by increasing the maximum permissible floorplate size of the fifth storey on "Tower B2" which is located on the southeast corner of the site. A previous Committee of Adjustment decision (A1204/16TEY) permitted variances to reduce the required parking spaces for the exclusive use of residents, increase the maximum permitted number of stories for Tower B2 and to permit the obstruction of certain parking spaces as well as dimension adjustments. A concurrent Site Plan Application (16 182989) is being processed.

    11 ORDNANCE ST · May 23, 2018 · 441 m away
  • Minor varianceApproved

    To alter the redevelopment plan approved under site-specific zoning by-law 818-2015 for two residential towers by reducing the number and dimensions of certain parking spaces and increasing the number of storeys of one of the towers.

    11 ORDNANCE ST · Mar 29, 2017 · 441 m away
  • Minor varianceApproved

    To modify the redevelopment plan approved under Site Specific By-law 159-2012, as amended by Site Specific By-law 103-2015 by modifying the minimum required parking dimensions, and reducing the minimum required number of parking spaces provided on the lot.

    30 ORDNANCE ST · Dec 2, 2015 · 456 m away

Latest activity nearby

  • Building permit

    Proposed Structural - Fire Damage Restoration

    35 BASTION ST · Nov 20, 2026 · 241 m away
  • Building permit

    Proposal for fire damage restoration.

    215 FORT YORK BLVD · Nov 17, 2026 · 129 m away
  • Building permitnew building

    Proposal to construct a community hall (basketball practice facility, business offices, community spaces, lunch-down spaces and site works) for WNBA team Toronto Tempo and the City of Toronto.

    701 FLEET ST · Nov 12, 2026 · 185 m away
  • Building permit

    Proposal for the temporary installation and operation of a self-contained, traveling fan activation associated with a major musical tour. The activation will consist of two shipping containers, approximately 32 and 40 feet in length, along with an accessory awning/canopy structure.To be installed Oct 26, 2026 and dismantled Oct 30, 2026

    250 FORT YORK BLVD · Oct 27, 2026 · 214 m away
  • Development application

    Zoning By-law Amendment - Lifting of the H Symbol to By-law 992-2026

    701 FLEET ST · Oct 20, 2026 · 120 m away · City file
  • Building permit

    Construct two temporary structures for Electric Island - Installed Sept 4 to Sept 8, 2026

    250 FORT YORK BLVD · Oct 7, 2026 · 214 m away
  • Building permit

    Installation of temporary tenting for an event - ONE - 30mx95m- TENT CERT#25 136310 and ONE - 40'x40' tent. Anchored with stakes. Install is Sept 21-23rd, Event is Sept 25th- 27th. Removal is Sept 28th-29th, 2026

    100 GARRISON RD · Sep 15, 2026 · 283 m away
  • Building permit

    Proposal to Erect One (1) Temporary Tents:Tents: One (1) - 10x100 Frame tent (Cert#15 152028)Install: Wednesday September 2, 2026. Dismantle: Monday September 7, 2026

    250 FORT YORK BLVD · Aug 31, 2026 · 214 m away
  • Building permit

    Construction and installation of a temporary engineered outdoor stage structure, including roof system , truss, lighting and sound support, for Common Ground Fest.Aug 2,2026 -Aug 3, 2026

    250 FORT YORK BLVD · Jul 31, 2026 · 214 m away
  • Building permit

    Proposal for stand-alone shoring and excavation permit in order to remediate the soil as needed, prior to start of construction of the future proposed recreational facility

    701 FLEET ST · Jul 28, 2026 · 185 m away

Neighbourhood: Fort York-Liberty Village

About the area around the lot, not the lot itself.

Nearest station
Exhibition GO Station16 min walk
Nearest TTC stop
Fleet St at Fort York Blvd East Side1 min walk
Nearest cycling route
Fort York BlvdBike Lane, 1 min walk
Nearest traffic count
48,261 vehicles in 14 hLake Shore Blvd W / Fort York Blvd / Coronation Park Trl, 80 m away, Jun 18, 2024
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
The Gore1 min walk
Coronation Park - Toronto1 min walk
June Callwood Park2 min walk

Schools within 1 km

  • THE WATERFRONT SCHOOL English Public 12 min walk
  • CITY SCHOOL English Public 12 min walk
  • NIAGARA STREET JR PUBLIC SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureFort York-Liberty VillageMedian neighbourhood
Median household income (2020)$94,000$84,500
Households that own their home47%54%
Population (2021)19,91516,813
Homes built in 1960 or before2%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleFort York-Liberty VillageCity median
Assault730.9636.3
Robbery23.369.5
Homicide3.95.3
Auto theft46.7192.6
Theft over $5,00077.846.1
Break and enter124.4172.8
Theft from vehicles132.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.