HousePrecheckCheck an address

666 Ontario StToronto · zoning, lot size and permit records

Residential · R (d1.0) (x104)59.9 × 75.5 m3,973 m²on St James Avecorner, also on Ontario St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 19 storeys, 231 rental units, built 1965More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 26 255862 (Fire Damage in a High-rise Residential Building: Removing and replacing all damaged int..., 2026); 26 139822 (Proposal for ventilation louver & duct retrofit, 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 6 development applications open within 300 m, up to 69 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 273227 PRS 00 IR (Property Standards, 2026, status Rescheduled).
  • City upkeep score: 86 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Castle FrankThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
59.9 m frontage75.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 26 273227 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 18 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards, Zoning): 26 262522 PRS 00 IR (Property Standards, 2026); 26 257740 PRS 00 IR (Property Standards, 2026); 26 242192 PRS 00 IR (Property Standards, 2026); and 15 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 255862 (Fire Damage in a High-rise Residential Building: Removing and replacing all damaged int..., 2026); 26 139822 (Proposal for ventilation louver & duct retrofit, 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 69 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • 3 short-term rental registrations here

    Good to know

    3 active short-term rental registrations at this address (Apartment, Condominium).

    What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.

    How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details

    City of Toronto, Short-term Rental Registrations
  • Rental building evaluation: 86 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (19 storeys, 231 units, built 1965).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

30 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 255862Permit Issued

    Fire Damage in a High-rise Residential Building: Removing and replacing all damaged interior finishes and partition walls, balcony windows and doors, and balcony railings in the affected unit. If further investigation confirms damage to the concrete balcony slab, it will be repaired or replaced.

    Nov 25, 2026 · 666 ONTARIO ST
  • By-law investigation26 273227 PRS 00 IRRescheduled

    Property Standards

    Nov 21, 2026 · 666 ONTARIO ST
  • By-law investigation26 262522 PRS 00 IRClosed

    Property Standards

    Oct 30, 2026 · 666 ONTARIO ST
  • By-law investigation26 257740 PRS 00 IRClosed

    Property Standards

    Oct 20, 2026 · 666 ONTARIO ST
  • By-law investigation26 242192 PRS 00 IRClosed

    Property Standards

    Sep 22, 2026 · 666 ONTARIO ST
  • By-law investigation26 229674 PRS 00 IRClosed

    Property Standards

    Sep 1, 2026 · 666 ONTARIO ST
  • By-law investigation26 228653 PRS 00 IRClosed

    Property Standards

    Aug 31, 2026 · 666 ONTARIO ST
  • By-law investigation26 224969 PRS 00 IRClosed

    Property Standards

    Aug 24, 2026 · 666 ONTARIO ST
Show 22 older records
  • By-law investigation26 224804 PRS 00 IRClosed

    Property Standards

    Aug 24, 2026 · 666 ONTARIO ST
  • By-law investigation26 221377 PRS 00 IRClosed

    Property Standards

    Aug 18, 2026 · 666 ONTARIO ST
  • By-law investigation26 215378 PRS 00 IRClosed

    Property Standards

    Aug 6, 2026 · 666 ONTARIO ST
  • By-law investigation26 213800 PRS 00 IRClosed

    Property Standards

    Aug 4, 2026 · 666 ONTARIO ST
  • By-law investigation26 207031 PRS 00 IRClosed

    Property Standards

    Jul 22, 2026 · 666 ONTARIO ST
  • Building permit26 139822Inspection

    Proposal for ventilation louver & duct retrofit.

    Jun 5, 2026 · 666 ONTARIO ST
  • By-law investigation26 172171 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 666 ONTARIO ST
  • By-law investigation26 172170 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 666 ONTARIO ST
  • By-law investigation26 148671 ZON 00 IRClosed

    Zoning

    Apr 23, 2026 · 666 ONTARIO ST
  • By-law investigation26 115198 HEA 00 IRClosed

    Adequate Heat

    Feb 9, 2026 · 666 ONTARIO ST
  • By-law investigation26 115197 PRS 00 IRClosed

    Property Standards

    Feb 9, 2026 · 666 ONTARIO ST
  • By-law investigation26 106419 SNI 00 IRClosed

    Snow and Ice

    Jan 19, 2026 · 666 ONTARIO ST
  • By-law investigation25 152173 PRS 00 IVClosed

    Order Issued Property Standards: The property is not being kept free of pests.

    Apr 29, 2025 · 666 ONTARIO ST
  • By-law investigation25 151055 PRS 00 IRClosed

    Property Standards

    Apr 29, 2025 · 666 ONTARIO ST
  • Zoning review19 240503 LPRClosed
    Oct 24, 2019 · 666 ONTARIO ST
  • Building permit15 107832Closed

    Proposal to install a new FACP complete with voice communication system amplifiers in the electrical room and remove the existing fire alarm voice communication amplifiers in the workshop on the basement level. Also a new Fire Alarm Annunciator is to be install in the main lobby on the ground floor of the existing apartment building.

    Jan 27, 2015 · 666 ONTARIO ST
  • Building permit14 156767Closed

    To complete exterior alterations to reapir exterior wall and garage leakage, A new balconey railing will also be installed to Units 804 and 806.

    May 16, 2014 · 666 ONTARIO ST
  • Building permit09 155552Closed

    Install 1 backflow prevention device.

    Aug 13, 2009 · 666 ONTARIO ST
  • Zoning review09 123133 LTOClosed
    Apr 3, 2009 · 666 ONTARIO ST
  • Building permit08 186467Closed

    Permit for parking garage repair to existing apartment building

    Aug 18, 2008 · 666 ONTARIO ST
  • Building permit01 130084Closed

    balcony repair and guard replacement - 17floors

    May 9, 2001 · 666 ONTARIO ST
  • Building permit97 018756Closed

    CARRY OUT REMEDIAL WORK TO COMPLY WITH RETROFIT PART 9 PROVISION OF THE FIRE CODE. BP

    Jul 22, 1997 · 666 ONTARIO ST

Check before you build

  • Site-specific exception 900.2.10(104)

    Needs a closer look

    3 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(104)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    An apartment building is a permitted building type, if: (i) the floor space index does not exceed 3.5; [TO: 438-86; 12(1) 24] (ii) the building lot coverage does not exceed 50%; (iii) the building setback to the side lot lines is no less than 3.0 metres; (iv) the building setback to the front lot line is no less than 6.0 metres; and (v) parking for an apartment building must be provided at a minimum rate of 1 parking space for each two dwelling units ; and [TO: 438-86; 12(1) 25]

  2. Rule B

    The requirements of (A), above, do not apply on or between the odd numbered addresses of 545-565 Sherbourne St.

  3. Rule C

    The lands must comply with exception 900.2.10(4).

  4. Older by-law A

    Section 12(1) 434 of former City of Toronto By-law 438-86

1 part for other addresses
  • B On 555 Sherbourne St., former City of Toronto by-laws 258-71, 693-80, 258-85, 94-0612, and 94-0727 and City of Toronto by-law 1044-06.
By-law 569-2013, Chapter 900

Lot facts

Area
3,973 m²
Frontage
59.9 m
Depth
75.5 m
Street
St James Ave
Corner lot
Yes, also on Ontario St75.5 m along it
Public lane
None
House footprint
903 m²roof up to 55.7 m
Back yard
16.8 mhouse to rear lot line
Side yards
7.9 m and 32.1 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Castle Frank. The lot is inside the Castle Frank Major Transit Station Area approved by the Province (Site and Area Specific Policy 649). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x104) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
100%8 of 8 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
3
Development applications
17

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 8 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new three-storey office building with a third storey roof terrace.

    555 BLOOR ST E · Aug 30, 2023 · 276 m away
  • Minor varianceApproved

    To alter the existing three-storey townhouse dwelling by constructing a two-storey rear addition, a rear ground floor deck, a rear stepped window well, and a front basement walkout.

    340 WELLESLEY ST E · Feb 22, 2023 · 475 m away
  • Minor varianceApproved

    To construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.

    7 ROSE AVE · Sep 7, 2022 · 495 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey townhouse by constructing a rear third storey addition (dormer) with a rear third storey deck.

    18 LAURIER AVE · Nov 17, 2021 · 398 m away
  • Minor varianceApproved

    To remove the detached garage in the rear yard of the existing one-storey detached dwelling.

    19 AMELIA ST · Oct 20, 2021 · 488 m away

Latest activity nearby

  • Building permit

    Fire Damage in a High-rise Residential Building: Removing and replacing all damaged interior finishes and partition walls, balcony windows and doors, and balcony railings in the affected unit. If further investigation confirms damage to the concrete balcony slab, it will be repaired or replaced.

    666 ONTARIO ST · Nov 25, 2026 · 12 m away
  • Building permit

    Proposal for interior alteration to fit the nails salon

    4 HOWARD ST · Oct 30, 2026 · 292 m away
  • Building permit

    Replacement of existing fire damaged balcony railings and repair of existing balconies for unit 2307 & 2407.

    375 BLEECKER ST · Oct 30, 2026 · 166 m away
  • Zoning review

    Closed

    100 HOWARD ST · Oct 29, 2026 · 253 m away
  • Building permit

    Interior alterations for a new nail salon in unit 4

    6 HOWARD ST · Oct 27, 2026 · 292 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    37 LINDEN ST · Oct 9, 2026 · 267 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units

    29 LINDEN ST · Oct 9, 2026 · 288 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    574 SHERBOURNE ST · Oct 9, 2026 · 259 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    572 SHERBOURNE ST · Oct 9, 2026 · 255 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    570 SHERBOURNE ST · Oct 9, 2026 · 250 m away

Neighbourhood: North St.James Town

About the area around the lot, not the lot itself.

Nearest station
Sherbourne Station6 min walk
Nearest TTC stop
Sherbourne St at Earl St North Side3 min walk
Nearest cycling route
Sherbourne StCycle Track, 3 min walk
Nearest traffic count
8,127 vehicles in 14 hSherbourne St / Earl St, 180 m away, Jan 31, 2024
Serious collisions within 500 m
72021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 3 with cyclists
Parks
St. James Town West Park3 min walk
Dr. Gordon Chong Park3 min walk
Wellesley - Magill Park4 min walk

Schools within 1 km

  • ROSE AVENUE JR PUBLIC SCHOOL English Public 2 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 5 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 5 min walk
  • OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • WINCHESTER JR & SR PUBLIC SCHOOL English Public 7 min walk
  • JARVIS COLLEGIATE INSTITUTE English Public 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNorth St.James TownMedian neighbourhood
Median household income (2020)$59,200$84,500
Households that own their home11%54%
Population (2021)18,53516,813
Homes built in 1960 or before19%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNorth St.James TownCity median
Assault1281.6636.3
Robbery76.969.5
Shootings4.310.5
Auto theft85.4192.6
Theft over $5,00038.446.1
Break and enter153.8172.8
Theft from vehicles136.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.