HousePrecheckCheck an address

66 Milvan DrToronto · zoning, lot size and permit records

Employment · E 1.0≈ 109.4 × 80.4 m5,756 m²on Milvan Dr

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.6 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 25 122206 (Installation of spray paint booth, mixing room and makeup air unit, 2025); 25 130303 (Installation of spray paint booth, mixing room and makeup air unit - unit 9, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • Major Transit Station Area: DuncanwoodsThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 109.4 m frontage≈ 80.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

21 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit25 122206Inspection

    Installation of spray paint booth, mixing room and makeup air unit.

    Oct 29, 2025 · 66 MILVAN DR
  • Building permit25 130303Inspection

    Installation of spray paint booth, mixing room and makeup air unit - unit 9

    Oct 28, 2025 · 66 MILVAN DR
  • By-law investigation25 179731 ZON 00 IRClosed

    Zoning

    Jun 18, 2025 · 66 MILVAN DR
  • Zoning review25 116520 LPRClosed
    Feb 12, 2025 · 66 MILVAN DR
  • Zoning review25 103840 ZZUClosed
    Jan 13, 2025 · 66 MILVAN DR
  • Zoning review25 102772 ZZUClosed
    Jan 9, 2025 · 66 MILVAN DR
  • Zoning review22 222882 LPRClosed
    Oct 27, 2022 · 66 MILVAN DR
  • Zoning review18 169527 LTOClosed
    Jun 1, 2018 · 66 MILVAN DR
Show 13 older records
  • Zoning review17 273330 ZZUClosed
    Dec 8, 2017 · 66 MILVAN DR
  • Zoning review16 229584 LTOClosed
    Sep 28, 2016 · 66 MILVAN DR
  • Zoning review13 244298 LPRClosed
    Oct 1, 2013 · 66 MILVAN DR
  • Zoning review13 219120 ZZUClosed
    Aug 12, 2013 · 66 MILVAN DR
  • Zoning review13 118941 LPRClosed
    Feb 12, 2013 · 66 MILVAN DR
  • Zoning review13 107870 LPRClosed
    Jan 18, 2013 · 66 MILVAN DR
  • Zoning review13 106262 LPRClosed
    Jan 15, 2013 · 66 MILVAN DR
  • Zoning review12 118604 LPRClosed
    Feb 7, 2012 · 66 MILVAN DR
  • Zoning review11 171964 LPRClosed
    Apr 12, 2011 · 66 MILVAN DR
  • Zoning review07 270811 LTOClosed
    Oct 17, 2007 · 66 MILVAN DR
  • Zoning review06 142025 LTOClosed
    Jun 2, 2006 · 66 MILVAN DR
  • Zoning review06 112857 LTOClosed
    Feb 27, 2006 · 66 MILVAN DR
  • Zoning review05 180666 LTOClosed
    Sep 15, 2005 · 66 MILVAN DR

Lot facts

Area
5,756 m²
Frontage
109.4 mestimated, irregular lot
Depth
80.4 mestimated, irregular lot
Street
Milvan Dr
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Major Transit Station Area: Duncanwoods. The lot is inside the Duncanwoods Major Transit Station Area approved by the Province (Site and Area Specific Policy 703). Source
  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: apple, sargents (35 cm), honey locust skyline (13 cm), honey locust skyline (7 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%3 of 3 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a one-storey south side addition.

    58 MILVAN DR · Feb 23, 2021 · 58 m away
  • Minor varianceApproved

    To maintain the existing one-storey east side addition.

    12 MILLPORT DR · Mar 7, 2019 · 220 m away
  • Minor varianceApproved

    To permit a car rental facility and to maintain the existing auto body shop.

    151 TORYORK DR · Oct 11, 2018 · 390 m away
  • Minor varianceApproved

    To convert a portion of the second floor into a Place of Worship.

    69 MILVAN DR · Jul 16, 2015 · 88 m away
  • Minor varianceApproved

    To permit a vehicle dealership.

    125 TORYORK DR · Apr 23, 2015 · 466 m away

Latest activity nearby

  • Zoning review

    Not Started

    49 MILVAN DR · Nov 20, 2026 · 168 m away
  • Zoning review

    Cancelled

    49 MILVAN DR · Nov 6, 2026 · 168 m away
  • Building permitgarden suite

    Proposed one-story Garden Suite

    67 CHERRYLAWN AVE · Sep 8, 2026 · 224 m away
  • Zoning review

    Closed

    99-101 MILVAN DR · May 13, 2026 · 279 m away
  • Zoning review

    Closed

    49 MILVAN DR · May 8, 2026 · 168 m away
  • Zoning review

    Closed

    49 MILVAN DR · Feb 12, 2026 · 168 m away
  • Building permit

    Proposal for addition of overheard garage door in auto repair shop

    54-64 PENN DR · Oct 30, 2025 · 132 m away
  • Building permit

    Installation of spray paint booth, mixing room and makeup air unit.

    66 MILVAN DR · Oct 29, 2025 · 43 m away
  • Building permit

    Installation of spray paint booth, mixing room and makeup air unit - unit 9

    66 MILVAN DR · Oct 28, 2025 · 43 m away
  • Building permitsecondary suite

    Proposal to extend the existing porch.

    80 CHERRYLAWN AVE · Sep 15, 2025 · 280 m away

Neighbourhood: Humber Summit

About the area around the lot, not the lot itself.

Nearest station
Milvan Rumike Station10 min walk
Nearest TTC stop
55 Milvan Dr2 min walk
Nearest cycling route
Humber River Recreational TrlMulti-Use Trail - Entrance, 16 min walk
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Duncanwoods Greenbelt4 min walk
Gracedale Park6 min walk
West Humber Parkland13 min walk

Schools within 1 km

  • GRACEDALE PUBLIC SCHOOL English Public 6 min walk
  • HUMBER SUMMIT MDL SCHOOL English Public 12 min walk
  • ST ROCH CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk
  • SUCCESS ACADEMY Private 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHumber SummitMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home72%54%
Population (2021)12,18516,813
Homes built in 1960 or before16%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHumber SummitCity median
Assault1031.8636.3
Robbery191.169.5
Shootings30.610.5
Auto theft672.6192.6
Theft over $5,000191.146.1
Break and enter397.4172.8
Theft from vehicles282.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.