HousePrecheckCheck an address

66 Dale AveToronto · zoning, lot size and permit records

Open space · O15.1 × 91.9 m1,291 m²on Dale Ave

Not a home

A park or open space

The zoning by-law sets this parcel aside for parks and open space. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 26 129776 (Proposal to demolish single family dwelling and associated shed, driveway; lands will u..., 2026); 19 184442 ESC 24 SA (The revised proposal is to develop a 12-storey (plus Mechanical Penthouse) residential..., 2019). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 m, up to 12 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
15.1 m frontage91.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Natural Heritage System (8% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 129776 (Proposal to demolish single family dwelling and associated shed, driveway; lands will u..., 2026); 19 184442 ESC 24 SA (The revised proposal is to develop a 12-storey (plus Mechanical Penthouse) residential..., 2019).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 12 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit26 129776Permit Issueddemolition

    Proposal to demolish single family dwelling and associated shed, driveway; lands will ultimately be transfered the City for Parkland as part of an approved Land Exchange Agreement.

    Jun 10, 2026 · 66 DALE AVE
  • Building permit26 105119Cancelleddemolition

    Proposal to demolish single family dwelling and associated shed, driveway; lands will ultimately be transfered the City for Parkland as part of an approved Land Exchange Agreement.

    Jan 15, 2026 · 66 DALE AVE
  • Building permit25 265330Cancelleddemolition

    Proposal to demolish single family dwelling and associated shed, driveway; lands will ultimately be transfered the City for Parkland as part of an approved Land Exchange Agreement.

    Dec 11, 2025 · 66 DALE AVE
  • By-law investigation25 137841 WST 00 IRClosed

    Waste

    Apr 1, 2025 · 66 DALE AVE
  • Zoning review22 241529 ZAPApplicable Law Pending
    Dec 21, 2022 · 66 DALE AVE
  • Development application19 184442 ESC 24 SANOAC Issued

    The revised proposal is to develop a 12-storey (plus Mechanical Penthouse) residential building containing a gross floor area of 15,703.96 sq. m (169,036.02 sq. ft) and a density of 1.11 FSI. This provides for a proposed residential unit count of 285 dwellings, consisting of 80 studio units (28.07%), 113 one-bedroom units (39.65%), 77 two-bedroom units (27.02%), and 15 three-bedroom units (5.26%).There is approximately 570 sq m (6,135 sq ft) of indoor amenity space located on the B2 and ground floor, and 570 sq m (6,135 sq ft) of outdoor amenity space located on the ground floor, for a total amenity area of 1,140 sq m (12,270 sq ft) or a total 4 sq m per unit. Parking is proposed at-grade and contains a total of 50 parking spaces, including 16 visitor parking spaces and 9 accessible spaces. A total of 20 short-term bicycle parking spaces are proposed at-grade and 194 long- term bicycle parking spaces are proposed on the B2 level, for a total of 214 bicycle parking spaces.

    Jul 8, 2019 · 66 DALE AVE · City file
  • Development application18 154389 ESC 36 OZClosed

    Application to amend the Official Plan and Zoning By-laws to permit the development of two residential apartment buildings at 80 Dale Avenue and parkland at 66 Dale Avenue. The apartment buildings would be 7 and 12-storeys in height, comprised of a total of 284 units and built upon two levels of underground parking, providing a total of 305 parking spaces. A privately owned publicly accessible open space walking trail is proposed along the west and north propery lines of the development site at 80 Dale Avenue. Related Site Plan Control Application: File 19 184442 24 SA.

    May 7, 2018 · 66 DALE AVE · City file

Lot facts

Area
1,291 m²
Frontage
15.1 m
Depth
91.9 m
Street
Dale Ave
Corner lot
No
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
—
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone O (Open Space). Chapter 90, section 90.10 of the by-law. Source

Around this lot

Minor variances approved
100%2 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
2

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new 12-storey residential building. This application was previously deferred from the November 13, 2024 hearing and re-scheduled from the December 4,2024 hearing.

    80 DALE AVE · Jan 16, 2025 · 89 m away

Latest activity nearby

  • Minor varianceDeferred

    To alter the development standards for the previously approved 12-storey residential building by increasing the building height and reducing the number of three-bedroom dwelling units. Cross Reference Site Plan Application 19 184442 ESC 24 SA. NOTE: This application was previously deferred at the Committee of Adjustment heading on October 7, 2026.

    80 DALE AVE · Dec 2, 2026 · 89 m away
  • Building permit

    Part Permit - Proposal for 12 storey (plus Mechanical Pent House) apartment building with 2 basements level

    80 DALE AVE · Jun 16, 2026 · 89 m away
  • Zoning review

    Notice Sent

    80 DALE AVE · Jun 12, 2026 · 89 m away
  • Building permitdemolition

    Proposal to demolish single family dwelling and associated shed, driveway; lands will ultimately be transfered the City for Parkland as part of an approved Land Exchange Agreement.

    66 DALE AVE · Jun 10, 2026 · 19 m away
  • Building permitdemolition

    Proposal to demolish existing SFD

    23 CROMWELL RD · May 22, 2026 · 119 m away
  • Building permitnew building, new house

    Proposal to construct a new 2 storey SFD

    23 CROMWELL RD · May 22, 2026 · 119 m away
  • Building permitmultiplex

    Proposal to construct a 2 storey rear addition and convert the existing semi to a 3 unit dwelling.

    30 PIN LANE · Feb 24, 2026 · 299 m away
  • Building permitsecondary suite

    Revision 1: washroom areas, kitchen area and bed 1 is proposed.for storage.Proposal to construct interior alterations to convert existing basement into secondary suite and construct a basement walkout.

    5 CROMWELL RD · Jan 22, 2026 · 250 m away
  • Building permitdemolition

    Proposal to demolish single family dwelling and associated shed, driveway; lands will ultimately be transfered the City for Parkland as part of an approved Land Exchange Agreement.

    66 DALE AVE · Jan 15, 2026 · 19 m away
  • Building permitdemolition

    Proposal to demolish single family dwelling and associated shed, driveway; lands will ultimately be transfered the City for Parkland as part of an approved Land Exchange Agreement.

    66 DALE AVE · Dec 11, 2025 · 19 m away

Neighbourhood: Guildwood

About the area around the lot, not the lot itself.

Nearest station
Guildwood GO Station12 min walk
Nearest TTC stop
Kingston Rd at Guildwood Pkwy East Side5 min walk
Nearest cycling route
Livingston RdSigned Route (No Pavement Markings), 7 min walk
Nearest traffic count
20,060 vehicles in 8 hKingston Rd / Dale Ave, 220 m away, May 22, 2018
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Highland Creek7 min walk
Rowatson Park8 min walk
Cedar Ridge Park8 min walk

Schools within 1 km

  • GUILDWOOD JR PUBLIC SCHOOL English Public 9 min walk
  • ST URSULA CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • SIR WILFRID LAURIER & NATIVE LEARNING CTR EAST English Public 16 min walk
  • CEDAR DRIVE JR PUBLIC SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureGuildwoodMedian neighbourhood
Median household income (2020)$102,000$84,500
Households that own their home78%54%
Population (2021)9,68016,813
Homes built in 1960 or before24%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleGuildwoodCity median
Assault399.4636.3
Robbery55.769.5
Shootings18.610.5
Auto theft74.3192.6
Theft over $5,00027.946.1
Break and enter55.7172.8
Theft from vehicles204.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.