Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2016
Needs a closer lookStill open in the City's records: 16 121220 (Proposal for re-roofing, replacement of roof deck, and installation of guard rails and..., 2016, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)2 development applications open within 300 m
Good to know2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
1 records on file: more than at 53% of Toronto houses (median 0).
- Building permit16 121220Permit Issued
Proposal for re-roofing, replacement of roof deck, and installation of guard rails and stairs over the roof at existing transit station building. Convenience address is 643 Markham Street.
Mar 23, 2016 · 655 MARKHAM ST
Lot facts
- Area
- 630 m²
- Frontage
- 18.5 m
- Depth
- 35.3 m
- Street
- Markham St
- Corner lot
- No
- Public lane
- Poulter's Pl, 58.5 m along it
- House footprint
- 269 m²roof up to 7.9 m
- Back yard
- 9 mhouse to rear lot line
- Side yards
- 2.5 m and 2.9 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 11 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 334, 465. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Bathurst. The lot is inside the Bathurst Major Transit Station Area approved by the Province (Site and Area Specific Policy 661). Source
- Zone R (d0.6) (Residential). Chapter 10, section 10.10 of the by-law. Source
Around this lot
- Minor variances approved
- 89%42 of 47 decisions
- Garden suite permits
- 2
- Laneway suite permits
- 6
- Multiplex permits
- 20
- Development applications
- 3
Within 300 m, last 10 years. 28 suite and multiplex permits: more than at 93% of Toronto houses (median 3). 47 variance decisions: more than at 82% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing two-and-one-half storey semi-detached dwelling by constructing a rear one-storey ground floor addition with a second storey terrace above, and a new rear ground floor deck with stairs. The existing rear walkout basement, rear enclosed porch with stairs, and rear storage space will be demolished.
679 EUCLID AVE · Oct 21, 2026 · 251 m away - Minor varianceApproved
To construct a one-storey detached ancillary building (gym) with a covered porch (located at the northeast corner of the building), in the rear yard.
11 BARTON AVE · Oct 14, 2026 · 346 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey detached apartment building (containing eight dwelling units) with a ground floor (south) canopy by constructing a rear four-storey addition with a fourth storey rooftop terrace on the southwest corner of the building (on the roof of the third storey). Also, to permit and to maintain an additional two existing dwelling units within the existing apartment building. The existing garage in the rear yard will be demolished and the existing driveway located at the southwest corner of the lot abutting Lennox Street will be removed. No parking spaces will be provided on-site. There will be a total of 17 residential dwelling units within the apartment building on this lot.
524 PALMERSTON BLVD · Oct 14, 2026 · 243 m away - Minor varianceApproved
To construct a new four-storey apartment building with front and rear basement walkouts, front and rear ground floor landings with stairs, front and rear balconies located on the second and third storeys, and front and rear fourth storey rooftop decks. There will be a total of three short-term bicycle parking spaces at the rear of the main building. Also, to construct a new rear two-storey detached ancillary building (containing one garden suite), including stairs at the west side of the ancillary building. There will be a total of 13 residential dwelling units on this lot (12 dwelling units occupying the apartment building, and one unit occupying the ancillary building).
501 PALMERSTON BLVD · Sep 23, 2026 · 300 m away - Minor varianceApproved
To alter the existing three-storey semi-detached dwelling by enclosing the rear third storey balcony into habitable space.
774 MARKHAM ST · Sep 9, 2026 · 407 m away
Latest activity nearby
- Zoning review
Closed
34 LENNOX ST · Nov 23, 2026 · 184 m away - Minor variancePending
Application Received
783 BATHURST ST · Nov 23, 2026 · 162 m away - Zoning review
Application Acceptable
514 PALMERSTON BLVD · Nov 19, 2026 · 290 m away - Zoning review
Closed
793 BATHURST ST · Nov 18, 2026 · 131 m away - Zoning review
Not Started
339 LIPPINCOTT ST · Nov 18, 2026 · 257 m away - Building permit
Rev 01: Permit RevisionInterior alterations to an existing semi-detached dwelling, including the remodeling of existing kitchens and washrooms. Work involves strictly non-load-bearing partition removals and layout modifications on the main and second floors. A new washroom is proposed on the third floor, which will be equipped with a mechanical exhaust fan vented to the exterior. The project also includes the vertical enlargement of one existing window on the rear third-floor elevation. The existing finished basement is to remain completely unaltered; no secondary suite, separate entrance, or change of major occupancy is proposed.
587 PALMERSTON AVE · Nov 17, 2026 · 140 m away - Zoning review
Not Started
783 BATHURST ST · Nov 16, 2026 · 162 m away - Zoning review
Closed
598 BLOOR ST W · Nov 11, 2026 · 92 m away - Building permit
Proposal for interior alterations tenant-fit 'Beauty Salon' -
565 BLOOR ST W · Nov 9, 2026 · 118 m away - Building permit
Proposed plumbing installation (handwashing sinks) for beauty studio.
34 LENNOX ST · Nov 9, 2026 · 184 m away
Neighbourhood: Annex
About the area around the lot, not the lot itself.
- Nearest station
- Bathurst Station2 min walk
- Nearest TTC stop
- Bathurst Station - Westbound Platform1 min walk
- Nearest cycling route
- Bloor St WCycle Track, 1 min walk
- Nearest traffic count
- 7,749 vehicles in 8 hBloor St W / Markham St, 70 m away, May 16, 2019
- Serious collisions within 500 m
- 52021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 1 with cyclists
- Parks
- Ed and Anne Mirvish Parkette2 min walk
- Honest Ed's Park2 min walk
- Seaton Park2 min walk
Schools within 1 km
- MONSIGNOR FRASER COLLEGE - ANNEX CAMPUS English Separate 4 min walk
- CITY AS SCHOOL TORONTO Private 5 min walk
- PALMERSTON AVENUE JR PUBLIC SCHOOL English Public 6 min walk
- CENTRAL TECHNICAL SCHOOL English Public 7 min walk
- ROYAL ST GEORGE'S COLLEGE- SR SCHOOL Private 7 min walk
- ROYAL ST GEORGES COLLEGE SCHOOL - SEE HOUSE Private 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Annex | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $85,000 | $84,500 |
| Households that own their home | 41% | 54% |
| Population (2021) | 29,300 | 16,813 |
| Homes built in 1960 or before | 40% | 29% |
| Homes needing major repairs | 6% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Annex | City median |
|---|---|---|
| Assault | 1080.9 | 636.3 |
| Robbery | 80.5 | 69.5 |
| Homicide | 5.2 | 5.3 |
| Shootings | 5.2 | 10.5 |
| Auto theft | 116.9 | 192.6 |
| Theft over $5,000 | 114.3 | 46.1 |
| Break and enter | 387.1 | 172.8 |
| Theft from vehicles | 220.9 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.