Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: listed
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register2 development applications open within 300 m
Good to know2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
No permits, applications or Committee of Adjustment files on this lot in the City's open records.
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 1,882 m²
- Frontage
- 38.2 mestimated, irregular lot
- Depth
- 80 mestimated, irregular lot
- Street
- Angelique St
- Corner lot
- Yes, also on Fleet St80 m along it
- Public lane
- None
- House footprint
- 29 m²roof up to 11.2 m
- Back yard
- 36 mhouse to rear lot line
- Side yards
- 9.2 m and 23 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 5
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the redevelopment plan for the 29 storey mixed-use building by reducing the total required number of parking spaces for the exclusive use of visitors to the residential units.
30 ORDNANCE ST · Nov 18, 2020 · 495 m away - Minor varianceApproved
To permit a gym (commercial school use) on the ground floor of an existing 35-storey condominium building.
600 FLEET ST · Jan 23, 2019 · 412 m away - Minor varianceApproved
To alter the redevelopment plan approved under site-specific zoning by-law 818-2015 for two residential towers by increasing the maximum permissible floorplate size of the fifth storey on "Tower B2" which is located on the southeast corner of the site. A previous Committee of Adjustment decision (A1204/16TEY) permitted variances to reduce the required parking spaces for the exclusive use of residents, increase the maximum permitted number of stories for Tower B2 and to permit the obstruction of certain parking spaces as well as dimension adjustments. A concurrent Site Plan Application (16 182989) is being processed.
11 ORDNANCE ST · May 23, 2018 · 487 m away - Minor varianceApproved
To alter the redevelopment plan approved under site-specific zoning by-law 818-2015 for two residential towers by reducing the number and dimensions of certain parking spaces and increasing the number of storeys of one of the towers.
11 ORDNANCE ST · Mar 29, 2017 · 487 m away - Minor varianceApproved
To modify the redevelopment plan approved under Site Specific By-law 159-2012, as amended by Site Specific By-law 103-2015 by modifying the minimum required parking dimensions, and reducing the minimum required number of parking spaces provided on the lot.
30 ORDNANCE ST · Dec 2, 2015 · 495 m away
Latest activity nearby
- Building permit
Proposed Structural - Fire Damage Restoration
35 BASTION ST · Nov 20, 2026 · 184 m away - Building permit
Fire Hose Cabinet (FHC) to be removed and relocated from its original location.
21 GRAND MAGAZINE ST · Nov 17, 2026 · 256 m away - Building permit
Proposal for fire damage restoration.
215 FORT YORK BLVD · Nov 17, 2026 · 69 m away - Building permit
Proposal to construct a community hall (basketball practice facility, business offices, community spaces, lunch-down spaces and site works) for WNBA team Toronto Tempo and the City of Toronto.
701 FLEET ST · Nov 12, 2026 · 256 m away - Building permit
Proposal for the temporary installation and operation of a self-contained, traveling fan activation associated with a major musical tour. The activation will consist of two shipping containers, approximately 32 and 40 feet in length, along with an accessory awning/canopy structure.To be installed Oct 26, 2026 and dismantled Oct 30, 2026
250 FORT YORK BLVD · Oct 27, 2026 · 229 m away - Development application
Zoning By-law Amendment - Lifting of the H Symbol to By-law 992-2026
701 FLEET ST · Oct 20, 2026 · 192 m away · City file - Building permit
Construct two temporary structures for Electric Island - Installed Sept 4 to Sept 8, 2026
250 FORT YORK BLVD · Oct 7, 2026 · 229 m away - Building permit
Installation of temporary tenting for an event - ONE - 30mx95m- TENT CERT#25 136310 and ONE - 40'x40' tent. Anchored with stakes. Install is Sept 21-23rd, Event is Sept 25th- 27th. Removal is Sept 28th-29th, 2026
100 GARRISON RD · Sep 15, 2026 · 293 m away - Zoning review
Closed
614 FLEET ST · Sep 14, 2026 · 264 m away - Building permit
Proposal to Erect One (1) Temporary Tents:Tents: One (1) - 10x100 Frame tent (Cert#15 152028)Install: Wednesday September 2, 2026. Dismantle: Monday September 7, 2026
250 FORT YORK BLVD · Aug 31, 2026 · 229 m away
Neighbourhood: Fort York-Liberty Village
About the area around the lot, not the lot itself.
- Nearest station
- Exhibition GO Station18 min walk
- Nearest TTC stop
- Fleet St at Bastion St West Side1 min walk
- Nearest cycling route
- Coronation Park TrlMulti-Use Trail, 1 min walk
- Nearest traffic count
- 20,230 vehicles in 8 hBastion St / Fleet St, 130 m away, May 26, 2011
- Serious collisions within 500 m
- 52021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 0 with cyclists
- Parks
- The Gore1 min walk
- Coronation Park - Toronto1 min walk
- June Callwood Park1 min walk
Schools within 1 km
- THE WATERFRONT SCHOOL English Public 10 min walk
- CITY SCHOOL English Public 10 min walk
- NIAGARA STREET JR PUBLIC SCHOOL English Public 15 min walk
- JEAN LUMB PUBLIC SCHOOL English Public 15 min walk
- BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 15 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Fort York-Liberty Village | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $94,000 | $84,500 |
| Households that own their home | 47% | 54% |
| Population (2021) | 19,915 | 16,813 |
| Homes built in 1960 or before | 2% | 29% |
| Homes needing major repairs | 2% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Fort York-Liberty Village | City median |
|---|---|---|
| Assault | 730.9 | 636.3 |
| Robbery | 23.3 | 69.5 |
| Homicide | 3.9 | 5.3 |
| Auto theft | 46.7 | 192.6 |
| Theft over $5,000 | 77.8 | 46.1 |
| Break and enter | 124.4 | 172.8 |
| Theft from vehicles | 132.2 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.