HousePrecheckCheck an address

65 Wade AveToronto · zoning, lot size and permit records

Also 79 Wade Ave

Employment · E 2.0 (x233)30.5 × 32.1 m976 m²on Wade Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • 8 development applications open within 300 m, up to 33 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • Major Transit Station Area: LansdowneThe City plans more homes around the station: good for transit, and more building over time.
N20 m
30.5 m frontage32.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 33 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • Development application18 132864 STE 18 SAClosed

    Site Plan Control application to facilitate the development of an 7-storey office building, with a total GFA of 13,473 square metres. 34 parking spaces will be provided at-grade, as well as 114 long term bicycle parking spaces and 6 short term bicycle parking spaces. The site is located immediately east of the rail corridor of the GO Barrie line, which will be elevated in the future by Metrolinx as part of the Big Move Regional Express Rail initiative, north of Bloor Street West, and one block west of the Landsdowne TTC station near Bloordale Village.

    Mar 22, 2018 · 65 WADE AVE · City file
  • Development application17 277975 STE 18 OZClosed

    Zoning By-law Amendment to facilitate the development of an 7-storey office building, with a total GFA of 13,123 square metres. The ground floor will allow for up to 218 square metres of GFA for an eating establishment or retail store. 33 parking spaces will be provided at-grade, as well as 87 long term bicycle parking spaces and 35 short term bicycle parking spaces. The site is located immediately east of the CN owned rail corridor of the GO Barrie line, which will be elevated in the future by Metrolinx as part of the Big Move Regional Express Rail initiative, north of Bloor Street West, and one block west of the Landsdowne TTC station near Bloordale Village.

    Dec 20, 2017 · 65 WADE AVE · City file

Check before you build

  • Site-specific exception 900.20.10(233)

    Needs a closer look

    The by-law lists this exception number twice, with different text, and does not say which applies here. Ask Toronto Building, or read both before relying on the rest of this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.20.10(233)Check

The by-law lists this exception number twice with different text.

  1. Rule A

    On 57, 65 and 77 Wade Avenue, if the requirements of Section 5 and Schedule A of By-law 1664-2019 are complied with then none of the provisions of 60.20.40.10 and 60.5.40.40 apply to prevent the erection and use of a building or structure in compliance with

  2. Rule B

    to (Q) below; (B) Despite regulation 60.20.1.10(3) the permitted maximum floor space index of all uses on the lot is 3.8

  3. Rule C

    Despite regulation 60.20.20.100(4) regarding the requirement for a retail store to be associated with a permitted manufacturing use , separated by a floor to ceiling wall that prevents public access does not apply

  4. Rule D

    Despite regulation 60.20.20.100(4)(C), the permitted maximum interior floor of a retail store is 500 square metres

  5. Rule E

    Regulation 60.20.50.10(1) regarding the requirement to provide a 3.0 metre wide strip of soft landscaping along the lot line does not apply

  6. Rule F

    The permitted maximum gross floor area for all non-residential uses is 13,123.00 square metres

  7. Rule G

    Despite regulation 60.20.40.10(1) the permitted maximum height is as shown on Diagram 3 of By-law 1664-2019

  8. Rule H

    Despite regulations 60.20.40.70(1), (2) and (3), the required minimum building setbacks are as shown on Diagram 3 of By-law 1664-2019

  9. Rule I

    Despite Clause 60.5.40.10 and Clause 60.5.40.60, rail safety structures may project above the permitted maximum height as shown on Diagram 3, and may encroach into the required minimum building setback , as shown on Diagram 3

  10. Rule J

    Despite regulation 200.5.10.1(1), a minimum of 47 parking spaces must be provided on the lot , of which 2 parking spaces may be used for LEV, carpooling or car sharing purposes

  11. Rule K

    Despite regulation 200.5.1.10(2), a maximum of 4 parking spaces may have the following minimum dimensions, with or without obstructions: (i) length of 5.6 metres; (ii) width of 2.6 metres; and (iii) vertical clearance of 2.0 metres

  12. Rule L

    Despite regulation 200.15.10(1), 1 accessible parking space must be provided on the lot

  13. Rule M

    Despite regulation 230.5.10.1(1), a minimum of 87 "long term" bicycle parking spaces , and a minimum of 35 "short term" bicycle parking spaces must be provided on the lot

  14. Rule N

    Despite regulation 230.5.1.10(7)(C), a minimum of 3 shower and change facilities must be provided for each gender for the "long term" bicycle parking spaces on the lot

  15. Rule O

    Despite regulations 220.5.10.1(3) and (5), one Type 'G' loading space and one Type 'B' loading space must be provided on the lot

  16. Rule P

    Despite regulation 220.5.1.10(8)(D) a Type 'G' loading space must have: (i) a minimum width of 4.0 metres; (ii) a minimum length of 13.0 metres; and (iii) a minimum vertical clearance of 6.1 metres

  17. Rule Q

    Despite regulation 220.5.1.10(B) a Type 'B' loading space must have: (i) a minimum width of 3.5 metres; (ii) a minimum length of 11.0 metres; and (iii) a minimum vertical clearance of 4.0 metres

2 parts for other addresses
  • A On the lands municipally known as 77 Wade Avenue in 1980, a salvage yard that is in conjunction with a fabricated metal manufacturing use that existed on the …
  • A On the lands municipally known as 77 Wade Avenue in 1980, a salvage yard that is in conjunction with a fabricated metal manufacturing use that existed on the …
By-law 569-2013, Chapter 900

Lot facts

Area
976 m²
Frontage
30.5 m
Depth
32.1 m
Street
Wade Ave
Corner lot
No
Public lane
None
Max height
14 m
Max lot coverage
—
  • Major Transit Station Area: Lansdowne. The lot is inside the Lansdowne Major Transit Station Area approved by the Province (Site and Area Specific Policy 657). Source
  • Zone E 2.0 (x233) (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
93%27 of 29 decisions
Garden suite permits
0
Laneway suite permits
4
Multiplex permits
5
Development applications
17

Within 300 m, last 10 years. 9 suite and multiplex permits: more than at 72% of Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit the increase of overall building height, rooftop mechanical penthouse height, and changes to parking spaces, provided within the seven-storey office building, as approved by Site Specific Zoning By-law 1664-2019.

    57 WADE AVE · Oct 12, 2022 · 24 m away

Latest activity nearby

  • Minor variancePending

    To alter the existing four-storey mixed-use building by constructing two mechanical penthouse enclosures (including rooftop access), and a partially covered rooftop terrace with a trellis (above the fourth storey). The ground level and second level will contain one commercial unit (art gallery and event space). The third level will contain a multi-functional commercial space for youth programming, as well as amenity space for building residents (including counselling rooms, a gym, a break room, and an open-concept collaboration space). There will be a total of eight residential dwelling units located on the fourth level for youth transitioning from the Ontario Child Protection Services foster care system.

    1286 BLOOR ST W · Nov 25, 2026 · 287 m away
  • Building permit

    INSTALLATION OF INSIDE BACK WATER VALVE

    85 CAMPBELL AVE · Nov 24, 2026 · 146 m away
  • Building permit

    Proposal to construct a rear one car detached garage with laneway access.

    80 SYMINGTON AVE · Nov 23, 2026 · 272 m away
  • Building permit

    REV 01: Minor revision to location of laundry room and new mechanical permit requiredProposal for interior alterations including wall removal and the construction of a new powder room

    33 SYMINGTON AVE · Nov 12, 2026 · 221 m away
  • Zoning review

    Notice Sent

    145 CAMPBELL AVE · Nov 4, 2026 · 292 m away
  • Building permit

    Proposed interior alterations for tenant fit-out to levels 5, 6, 7 with ancillary and support functions on levels P1, Level 1 mechanical penthouse and roof level.

    77 WADE AVE · Oct 8, 2026 · 49 m away
  • Zoning review

    Application On Hold

    1293 BLOOR ST W · Oct 6, 2026 · 223 m away
  • Zoning review

    Notice Sent

    95 SYMINGTON AVE · Sep 30, 2026 · 276 m away
  • Zoning review

    Closed

    1267 BLOOR ST W · Sep 29, 2026 · 300 m away
  • Zoning review

    Cancelled

    145 CAMPBELL AVE · Sep 17, 2026 · 292 m away

Neighbourhood: Junction-Wallace Emerson

About the area around the lot, not the lot itself.

Nearest station
Lansdowne Station3 min walk
Nearest TTC stop
55 Rankin Cres2 min walk
Nearest cycling route
Bloor St WCycle Track, 2 min walk
Nearest traffic count
203 vehicles in 8 hPaton Rd / Rankin Cres, 140 m away, Jul 30, 2014
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
Parks
Erwin Krickhahn Park1 min walk
Perth Avenue Parkette6 min walk
West Toronto Railpath7 min walk

Schools within 1 km

  • ST SEBASTIAN CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • PAULINE JR PUBLIC SCHOOL English Public 10 min walk
  • BISHOP MARROCCO THOMAS MERTON CATHOLIC SECONDARY SCHOOL English Separate 10 min walk
  • ST LUIGI CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • TAMARACK WEST OUTDOOR SCHOOL Private 10 min walk
  • PERTH AVENUE JR PUBLIC SCHOOL English Public 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureJunction-Wallace EmersonMedian neighbourhood
Median household income (2020)$84,000$84,500
Households that own their home50%54%
Population (2021)23,18016,813
Homes built in 1960 or before40%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleJunction-Wallace EmersonCity median
Assault720636.3
Robbery3669.5
Shootings3.610.5
Auto theft108192.6
Theft over $5,00032.446.1
Break and enter230.4172.8
Theft from vehicles201.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.