HousePrecheckCheck an address

65 Keewatin AveToronto · zoning, lot size and permit records

Residential · R (d0.6) (x916)33.4 × 57.2 m1,902 m²on Keewatin Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 50 rental units, built 1958More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 10 development applications open within 300 m, up to 39 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • City upkeep score: 94 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
33.4 m frontage57.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 25 263980 PRS 00 IV (Order Issued Property Standards: Height of the guard for the exit stairs are less than..., 2025); 25 263944 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 10 development applications open within 300 m

    Good to know

    10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 39 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 94 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 50 units, built 1958).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • By-law investigation25 263980 PRS 00 IVClosed

    Order Issued Property Standards: Height of the guard for the exit stairs are less than 1,070 millimetres around landings.; Height of the guard for the exit stairs are less than 920 millimetres measured vertically to the top of the guard from a line drawn through the outside edges of; Required guard does not prevent the passage of a spherical object having a diameter more than 100 millimetres; The location and size of openings present a hazard as they are designed with members or attachments between 140 millimetres and 900 millimetres above the level

    Dec 8, 2025 · 65 KEEWATIN AVE
  • By-law investigation25 263944 PRS 00 IRClosed

    Property Standards

    Dec 8, 2025 · 65 KEEWATIN AVE
  • Building permit18 239900Closed

    Proposed Installation of Premise Isolation via: DCVA Backflow Preventer, and Installation of Thermal Expansion Protection via: Bladder type Expansion Tank.

    Nov 7, 2018 · 65 KEEWATIN AVE
  • Building permit18 213642Closed

    Repair and waterproofing of balcony slabs including supply and installation of new full height glass railings

    Sep 6, 2018 · 65 KEEWATIN AVE

Check before you build

  • Site-specific exception 900.2.10(916)

    Needs a closer look

    1 site-specific rule and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(916)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Any addition or extension above the first storey of a lawfully existing detached house must comply with the minimum building setbacks required by this By-law. [TO: 438-86; 12 (2) 193]

  2. Older by-law A

    Section 12(2) 118 of former City of Toronto By-law 438-86.

  3. Older by-law B

    Section 12(2) 119 of former City of Toronto By-law 438-86

By-law 569-2013, Chapter 900

Lot facts

Area
1,902 m²
Frontage
33.4 m
Depth
57.2 m
Street
Keewatin Ave
Corner lot
No
Public lane
None
House footprint
972 m²roof up to 19.8 m
Back yard
7.4 mhouse to rear lot line
Side yards
3.1 m and 3.3 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
14 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone R (d0.6) (x916) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
88%21 of 24 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
2
Development applications
25

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To construct a new three (3) storey detached dwelling with a secondary suite in the basement.File Numbers B0016/26NY, A0267/26NY & A0268/26NY will be considered jointly.

    80 SHERWOOD AVE · Nov 12, 2026 · 280 m away
  • Minor varianceRefused

    To construct a new three (3) storey detached dwelling with a secondary suite in the basement.File Numbers B0016/26NY, A0267/26NY & A0268/26NY will be considered jointly.

    80 SHERWOOD AVE · Nov 12, 2026 · 280 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a covered front porch, rear deck and a front yard parking pad. File Numbers. B0015/26NY, A0262/26NY and A0263/26NY will be jointly considered.

    74 ROSELAWN AVE · Oct 29, 2026 · 391 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a covered front porch, rear deck and a front yard parking pad. File Numbers B0015/26NY, A0262/26NY and A0263/26NY will be jointly considered.

    74 ROSELAWN AVE · Oct 29, 2026 · 391 m away
  • Minor varianceApproved

    To alter the existing semi-detached dwelling by constructing a rear second storey addition.

    50 SHERWOOD AVE · May 21, 2026 · 215 m away

Latest activity nearby

  • Building permit

    Install a Electro Magnetic Locking Device on PH Level (17th floor)

    55 ERSKINE AVE · Nov 24, 2026 · 131 m away
  • Building permit

    Proposal for multiple repairs at P1 Garage Parking Level

    66 BROADWAY AVE · Nov 23, 2026 · 244 m away
  • Consent (lot split)Refused

    To obtain consent to sever the existing property into two residential lots. File Numbers B0016/26NY, A0267/26NY & A0268/26NY will be considered jointly.

    80 SHERWOOD AVE · Nov 12, 2026 · 280 m away
  • Minor varianceRefused

    To construct a new three (3) storey detached dwelling with a secondary suite in the basement.File Numbers B0016/26NY, A0267/26NY & A0268/26NY will be considered jointly.

    80 SHERWOOD AVE · Nov 12, 2026 · 280 m away
  • Minor varianceRefused

    To construct a new three (3) storey detached dwelling with a secondary suite in the basement.File Numbers B0016/26NY, A0267/26NY & A0268/26NY will be considered jointly.

    80 SHERWOOD AVE · Nov 12, 2026 · 280 m away
  • Building permit

    Rev 01: Revision to reflect actual site conditions. Proposal for interior alterations to the ground floor to combine two existing commerical units into a single take-out restaurant

    2564 YONGE ST · Nov 10, 2026 · 267 m away
  • Building permitgarden suite

    Revision 01 to remove the proposed second storey windows facing the north lot line and install skylights to the primary bedroom and bathroom. Proposed 2 storey garden suite

    38 KEEWATIN AVE · Nov 10, 2026 · 96 m away
  • Building permit

    REV 01: Install 1 maglocks thought out buiidling as per below.1 pc - Level P1Proposal to install 8 maglocks in total. Level 6 (3pc), Level 8 (1pc), Level 11 (2pc), Level 15 (2pc).

    2500 YONGE ST · Nov 10, 2026 · 194 m away
  • Building permit

    Proposed interior alterations to an existing restaurant, including modifications to the ground floor washroom and kitchen layout.

    2472 YONGE ST · Nov 9, 2026 · 218 m away
  • Building permit

    Proposed Addition and Interior Alterations.

    50 SHERWOOD AVE · Nov 2, 2026 · 215 m away

Neighbourhood: North Toronto

About the area around the lot, not the lot itself.

Nearest station
Mount Pleasant Station12 min walk
Nearest TTC stop
Yonge St at Castlefield Ave3 min walk
Nearest cycling route
Broadway AveSigned Route (No Pavement Markings), 4 min walk
Nearest traffic count
11,138 vehicles in 8 hYonge St / Keewatin Ave, 170 m away, May 12, 2021
Serious collisions within 500 m
52021–2026, killed or seriously injured: 0 fatal, 4 with pedestrians, 0 with cyclists
Parks
85 Keewatin Ave Park2 min walk
Redpath Avenue Parkette3 min walk
St. Clements - Yonge Parkette3 min walk

Schools within 1 km

  • JOHN FISHER JR PUBLIC SCHOOL English Public 1 min walk
  • ST CLEMENTS SCHOOL Private 4 min walk
  • ST MONICA CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
  • NORTH TORONTO COLLEGIATE INSTITUTE English Public 5 min walk
  • ST CLEMENTS EARLY LEARNING Private 6 min walk
  • BLYTH ACADEMY SCHOOL - LAWRENCE PARK Private 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNorth TorontoMedian neighbourhood
Median household income (2020)$70,000$84,500
Households that own their home19%54%
Population (2021)15,88516,813
Homes built in 1960 or before9%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNorth TorontoCity median
Assault626.8636.3
Robbery53.469.5
Auto theft68192.6
Theft over $5,00024.346.1
Break and enter174.9172.8
Theft from vehicles63.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.