HousePrecheckCheck an address

65 Carling AveToronto · zoning, lot size and permit records

Residential · R (d0.6)≈ 12.2 × 7.5 m52 m²on Carling Ave

Not a home

Vacant Land

The City of Toronto's real estate inventory lists Vacant Land here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • City of Toronto landThe City decides what happens here; ask it about any plans.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
  • Major Transit Station Area: ChristieThe City plans more homes around the station: good for transit, and more building over time.
N5 m
≈ 12.2 m frontage≈ 7.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Lot facts

Area
52 m²
Frontage
12.2 mestimated, irregular lot
Depth
7.5 mestimated, irregular lot
Street
Carling Ave
Corner lot
No
Public lane
None
Max height
11 m
Max lot coverage
—
  • Major Transit Station Area: Christie. The lot is inside the Christie Major Transit Station Area approved by the Province (Site and Area Specific Policy 660). Source
  • Zone R (d0.6) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
90%45 of 50 decisions
Garden suite permits
1
Laneway suite permits
7
Multiplex permits
23
Development applications
2

Within 300 m, last 10 years. 31 suite and multiplex permits: more than at 94% of Toronto houses (median 3). 50 variance decisions: more than at 85% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new two-storey detached ancillary building (to contain one laneway suite), in the rear yard, abutting the laneway. There will be a total of four residential dwelling units on this lot (three units within the main building and one unit within the ancillary building).

    711 CRAWFORD ST · Jul 8, 2026 · 364 m away
  • Minor varianceApproved

    To construct a new two-storey detached ancillary building to contain a garage with one parking space on the ground level and studio space (non-habitable space) on the second storey, in the rear yard, abutting the laneway.

    728 CRAWFORD ST · May 27, 2026 · 225 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by extending the rear second storey balcony by reconstructing the rear exterior platform/staircase (leading to the second level). Also, to alter the existing rear one-storey detached ancillary building (garage abutting the laneway) by constructing a complete second storey addition (to contain one laneway suite) with a side (south) exterior platform/staircase to access the second level. The existing ground floor deck (with stairs) on the south side of the ancillary building, will be maintained and unaltered.

    30 PENDRITH ST · Mar 18, 2026 · 460 m away
  • Minor varianceApproved

    To construct a new three-storey detached apartment building with one front yard parking pad, a front basement level terrace with a walkout, front ground, second, and third floor balconies, a rear second storey balcony, and two rear yard parking spaces (as previously approved by Minor Variance Decision A0638/23TEY). There will be a total of seven residential dwelling units on this lot (six units within the main building, and one unit within the detached two-storey dwelling in the rear yard [which is currently under construction, as approved by Minor Variance Decision A0638/23TEY]).

    157-159 DELAWARE AVE · Mar 4, 2026 · 479 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with basement, and a rear second storey balcony.

    778 CRAWFORD ST · Mar 4, 2026 · 180 m away

Latest activity nearby

  • Zoning review

    Not Started

    828 SHAW ST · Nov 25, 2026 · 87 m away
  • Zoning review

    Not Started

    828 SHAW ST · Nov 25, 2026 · 87 m away
  • Zoning review

    Notice Sent

    18 LEEDS ST · Oct 26, 2026 · 43 m away
  • Building permitgarden suite, laneway suite

    Proposal to construct a two storey laneway suite in the rear yard. See related ZAP Folder #24 102891

    880 OSSINGTON AVE · Oct 26, 2026 · 236 m away
  • Zoning review

    Closed

    890 BLOOR ST W · Oct 15, 2026 · 226 m away
  • Building permitdemolition, multiplex

    Proposed demolish existing dwelling and construct new 3 storey four unit (fourplex) dwelling

    145 PENDRITH ST · Oct 15, 2026 · 223 m away
  • Building permitmultiplex, new building, new house

    Proposed demolish existing dwelling and construct new 3 storey four unit (fourplex) dwelling

    145 PENDRITH ST · Oct 15, 2026 · 223 m away
  • Consent (lot split)Pending

    Cancelled

    828 SHAW ST · Oct 6, 2026 · 87 m away
  • Building permit

    PROPOSED INTERIOR ALTERATIONS TO BASEMENT, GROUND, SECOND, AND THIRD FLOORS

    774 SHAW ST · Sep 24, 2026 · 137 m away
  • Building permit

    Proposed rooftop solar panel installation

    333 CONCORD AVE · Sep 21, 2026 · 189 m away

Neighbourhood: Dovercourt Village

About the area around the lot, not the lot itself.

Nearest station
Ossington Station4 min walk
Nearest TTC stop
Ossington Ave at Leeds St2 min walk
Nearest cycling route
Shaw StBike Lane - Contraflow, 2 min walk
Nearest traffic count
1,270 vehicles in 8 hLeeds St / Shaw St, 100 m away, Sep 25, 2013
Serious collisions within 500 m
62021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 3 with cyclists
Parks
Irene Avenue Parkette3 min walk
Northumberland Playground3 min walk
Christie Pits Park3 min walk

Schools within 1 km

  • ST BRUNO & ST RAYMOND CATHOLIC ELEMENTARY SCHOOL (FUTURE SITE) English Separate 4 min walk
  • SACRE COEUR CATHOLIC ELEMENTARY SCHOOL French Separate 7 min walk
  • WEST END ALTERNATIVE SCHOOL English Public 8 min walk
  • ESSEX JR SR & HAWTHORNE TWO BILINGUAL English Public 8 min walk
  • CENTRAL TORONTO ACADEMY & HORIZON ALTERNATIVE SR English Public 12 min walk
  • ST ANTHONY CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDovercourt VillageMedian neighbourhood
Median household income (2020)$87,000$84,500
Households that own their home55%54%
Population (2021)12,38016,813
Homes built in 1960 or before70%29%
Homes needing major repairs11%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDovercourt VillageCity median
Assault974.9636.3
Robbery68.669.5
Auto theft129.5192.6
Theft over $5,00022.946.1
Break and enter236.1172.8
Theft from vehicles144.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.