HousePrecheckCheck an address

635 Danforth AveToronto · zoning, lot size and permit records

Commercial residential · CR 3.0 (c2.5; r2.5) SS2 (x2426)≈ 60.2 × 80.8 m1,441 m²on Gough Avecorner, also on Danforth Ave

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 3 development applications open within 300 m, up to 49 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
  • Major Transit Station Area: ChesterThe City plans more homes around the station: good for transit, and more building over time.
N20 m
≈ 60.2 m frontage≈ 80.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0161/07TEY (To maintain and to legalize the use of the existing building as a fitness centre, which..., 2007).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 49 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

20 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit15 235047Closed

    HVAC - Proposal for interior alterations to existing fitness centre - "Goodlife Fitness"

    Nov 10, 2015 · 635 DANFORTH AVE
  • Building permit13 275207Closed

    To erect and display one illuminated wall sign on the northerly elevation. **GoodLife Fitness**

    Jan 17, 2014 · 635 DANFORTH AVE
  • Building permit07 222416Closed

    Iinterior alterations to all floors including the basement to convert to (and legalize) the use as a fitness club. See Final & Binding - A0161/07TEY.

    Sep 4, 2007 · 635 DANFORTH AVE
  • Minor varianceA0161/07TEYApproved

    To maintain and to legalize the use of the existing building as a fitness centre, which was established without proper authorization.

    Apr 25, 2007 · 635 DANFORTH AVE
  • Zoning review07 105625 ZPRClosed
    Jan 30, 2007 · 635 DANFORTH AVE
  • Zoning review05 194263 LTOClosed
    Oct 17, 2005 · 635 DANFORTH AVE
  • Zoning review04 170104 LTOClosed
    Aug 30, 2004 · 635 DANFORTH AVE
  • Building permit03 121078Closed

    make interior alters by erecting a partition wall(office area) to existing restaurant on 1st floor.

    Apr 25, 2003 · 635 DANFORTH AVE
Show 12 older records
  • Zoning review02 180890 LTOClosed
    Oct 11, 2002 · 635 DANFORTH AVE
  • Zoning review02 125382 LTOClosed
    Apr 10, 2002 · 635 DANFORTH AVE
  • Building permit99 104207Closed

    INSTALL ON 1ST FLOOR: 2 URINALS, 3 W.B., ON MEZZANINE: 3 W.B., 2 W.C. EDC

    Oct 20, 1999 · 635 DANFORTH AVE
  • Zoning review97 027127 LTOClosed
    Nov 24, 1997 · 635 DANFORTH AVE
  • Zoning review94 024815 LTOClosed
    Apr 19, 1994 · 635 DANFORTH AVE
  • Zoning review93 025837 LTOClosed
    Dec 1, 1993 · 635 DANFORTH AVE
  • Zoning review92 025108 LTOClosed
    Jan 23, 1992 · 635 DANFORTH AVE
  • Zoning review89 030466 LTOClosed
    Nov 1, 1989 · 635 DANFORTH AVE
  • Zoning review89 029911 LTOClosed
    Mar 28, 1989 · 635 DANFORTH AVE
  • Zoning review88 030309 LTOClosed
    Apr 22, 1988 · 635 DANFORTH AVE
  • Zoning review87 030575 LTOClosed
    Dec 8, 1987 · 635 DANFORTH AVE
  • Zoning review87 030504 LTOClosed
    Nov 5, 1987 · 635 DANFORTH AVE

Check before you build

  • Site-specific exception 900.11.10(2426)

    Needs a closer look

    2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2426)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands, the maximum interior floor area used for an amusement arcade , recreation use , eating establishment , or any combination of these uses is 400 square metres; and [TO: 438-86; 12(2) 199]

  2. Rule B

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270 (a) of former City of Toronto By-law 438-86; (B) On 80 Danforth Ave., former City of Toronto by-laws 392-76 and 487-76

  3. Older by-law A

    On the lands, the maximum interior floor area used for an amusement arcade , recreation use , eating establishment , or any combination of these uses is 400 square metres; and [TO: 438-86; 12(2) 199]

  4. Older by-law B

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270 (a) of former City of Toronto By-law 438-86; (B) On 80 Danforth Ave., former City of Toronto by-laws 392-76 and 487-76

4 parts for other addresses
  • C On the lands municipally known as 411 Danforth Ave. in 1996, Section 12(1) 429 (i) of former City of Toronto By-law 438-86
  • D On the lands municipally known as 535 Danforth Ave. in 1996, Section 12(1) 429 (ii) of former City of Toronto By-law 438-86.
  • C On the lands municipally known as 411 Danforth Ave. in 1996, Section 12(1) 429 (i) of former City of Toronto By-law 438-86
  • D On the lands municipally known as 535 Danforth Ave. in 1996, Section 12(1) 429 (ii) of former City of Toronto By-law 438-86.
By-law 569-2013, Chapter 900

Lot facts

Area
1,441 m²
Frontage
60.2 mestimated, irregular lot
Depth
80.8 mestimated, irregular lot
Street
Gough Ave
Corner lot
Yes, also on Danforth Ave80.8 m along it
Public lane
None
House footprint
1,132 m²roof up to 20.4 m
Back yard
0 mhouse to rear lot line
Side yards
0.1 m and 0.4 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
3house, garage, sheds
Max height
16 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Chester. The lot is inside the Chester Major Transit Station Area approved by the Province (Site and Area Specific Policy 615). Source
  • Zone CR 3.0 (c2.5; r2.5) SS2 (x2426) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
87%48 of 55 decisions
Garden suite permits
1
Laneway suite permits
6
Multiplex permits
7
Development applications
4

Within 300 m, last 10 years. 14 suite and multiplex permits: more than at 81% of Toronto houses (median 3). 55 variance decisions: more than at 89% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To legalize and to maintain the existing partial second storey addition, which was constructed without an authorized building permit. Also, to convert the existing two-storey non-residential building into a two-storey mixed-use building by constructing one residential dwelling unit within the partial second storey addition. The existing retail use (jewellery store) located on the ground floor will be maintained. No parking spaces will be provided.

    497 DANFORTH AVE · Jul 30, 2025 · 320 m away
  • Minor varianceApproved

    To maintain the existing two-storey mixed-use building (containing one restaurant use on the ground floor, and one residential dwelling unit occupying the second level) with a rear second storey rooftop terrace. Also, to construct a new exterior staircase at the rear of the building. No parking spaces will be provided.

    497 DANFORTH AVE · Jul 30, 2025 · 320 m away
  • Minor varianceApproved

    To alter the existing two-storey mixed-use building (two commercial units and one residential dwelling unit) by constructing a rear two-storey addition (with an interior garage (including car lift for two parking spaces)). There will be one commercial unit (occupying both the basement and ground floor levels) and two residential dwellings units (both on the second level), on this lot.

    412 DANFORTH AVE · Jan 29, 2025 · 496 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by constructing a rear one-storey addition (for additional ground floor commercial space) with a rear exit and landing. Also, to construct a new rear fire escape staircase on the west side of the new addition. The existing dental office use will occupy the entire ground floor of this building as well as the adjacent building to the east (municipally known as 643 Danforth Avenue). The two existing residential dwelling units on the second and third storeys will be maintained and unaltered.

    641 DANFORTH AVE · Jun 5, 2024 · 15 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by constructing a rear one-storey addition (for additional ground floor commercial space) with a rear exit and landing. The existing dental office use will occupy the entire ground floor of this building as well as the adjacent building to the west (municipally known as 641 Danforth Avenue). The two existing residential dwelling units on the second and third storeys will be maintained and unaltered.

    643 DANFORTH AVE · Jun 5, 2024 · 19 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent for the technical severance of the property for the purpose of re-establishing two lots which merged on title.

    721 DANFORTH AVE · Dec 16, 2026 · 183 m away
  • Minor variancePending

    To construct a new three-storey detached building (houseplex) with front and rear basement walkouts, first storey front and rear covered porches, and front and rear second storey decks. Also, to construct a new rear two-storey ancillary building (containing one laneway suite), abutting the public laneway. There will be a total of five residential dwelling units on this lot (four units occupying the main building, and one unit occupying the ancillary building).

    43 EATON AVE · Dec 2, 2026 · 296 m away
  • Zoning review

    Not Started

    743 PAPE AVE · Nov 25, 2026 · 151 m away
  • Building permit

    Change of use of commercial main floor to a coffee store. Alterations on first floor. Built new fire exist stairs for the residential units at the rear of the coffee store from the flat roof.

    681 DANFORTH AVE · Nov 4, 2026 · 109 m away
  • Building permit

    Back water valve installation

    51 HARCOURT AVE · Nov 3, 2026 · 208 m away
  • Building permit

    Installation of Main Drain Pipe "Backwater Valve".

    117 GOUGH AVE · Nov 3, 2026 · 246 m away
  • Building permit

    Back water valve and sump pump installation

    34 EATON AVE · Nov 3, 2026 · 238 m away
  • Building permit

    Supply and install main sanitary back water valve

    45 HARCOURT AVE · Nov 3, 2026 · 192 m away
  • Building permit

    BWV Inside inside on Sewer, full clay drain replacement underground inside. Sump pit,sump pump and battery back up pump installation

    640 PAPE AVE · Oct 27, 2026 · 218 m away
  • Zoning review

    Closed

    735 DANFORTH AVE · Oct 23, 2026 · 212 m away

Neighbourhood: North Riverdale

About the area around the lot, not the lot itself.

Nearest station
Pape Station3 min walk
Nearest TTC stop
Danforth Ave at Pape Ave1 min walk
Nearest cycling route
Danforth AveCycle Track, 1 min walk
Nearest traffic count
20,490 vehicles in 14 hPape Ave / Danforth Ave, 60 m away, Jun 24, 2025
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
Parks
Carlaw Avenue Parkette2 min walk
Withrow Park4 min walk
Logan Green Field5 min walk

Schools within 1 km

  • HOLY NAME CATHOLIC ELEMENTARY SCHOOL English Separate 3 min walk
  • FRANKLAND COMMUNITY SCHOOL English Public 6 min walk
  • EARL GREY SR PUBLIC SCHOOL English Public 7 min walk
  • JONES AVENUE ADULT CENTRE English Public 8 min walk
  • KAPAPAMAHCHAKWEW - WANDERING SPIRIT SCHOOL & SUBWAY ACADEMY ONE English Public 11 min walk
  • JACKMAN AVENUE JR PUBLIC SCHOOL English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNorth RiverdaleMedian neighbourhood
Median household income (2020)$108,000$84,500
Households that own their home58%54%
Population (2021)11,29016,813
Homes built in 1960 or before77%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNorth RiverdaleCity median
Assault662.9636.3
Robbery81.869.5
Homicide16.45.3
Shootings8.210.5
Auto theft106.4192.6
Theft over $5,00024.646.1
Break and enter294.6172.8
Theft from vehicles270.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.