HousePrecheckCheck an address

632 Yonge StToronto · zoning, lot size and permit records

Also 628 Yonge St, 630 Yonge St

Commercial residential · CR 3.0 (c2.0; r3.0) SS1 (x2546)16.2 × 27.4 m419 m²on Yonge St

Not a single house

Several homes on one parcel

3 different civic addresses share this parcel: a townhouse row, a co-op or a complex of homes rather than one house. Build options for a house do not apply to one home here, and the City's records for the parcel may be about any of them.

Looking at a house nearby? What this means for you

  • 3 homes on one parcel of 0.0 haA denser block than the houses around it: more cars and people, often with shared driveways and parking.
  • Permits or applications open on this parcelStill open in the City's records: 23 208879 (Revision 01 - add furnace room and change existing roof top unit to new furnace at reta..., 2024, status Revision Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 22 development applications open within 300 m, up to 76 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: Bloor-YongeThe City plans more homes around the station: good for transit, and more building over time.

Want to check a home here before you buy?

We are building checks for homes in complexes and co-ops. Leave your email and we will tell you when it is ready.

N10 m
16.2 m frontage27.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: in a Heritage Conservation District (Part V)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Building permit open since 2024

    Needs a closer look

    Still open in the City's records: 23 208879 (Revision 01 - add furnace room and change existing roof top unit to new furnace at reta..., 2024, status Revision Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 22 development applications open within 300 m

    Good to know

    22 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 76 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

23 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review26 235953 LPRClosed
    Sep 11, 2026 · 632 YONGE ST
  • By-law investigation26 143017 WST 00 IVClosed

    Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to

    Apr 13, 2026 · 632 YONGE ST
  • By-law investigation26 143015 WST 00 IRClosed

    Waste

    Apr 13, 2026 · 632 YONGE ST
  • Zoning review26 105012 LTOClosed
    Jan 15, 2026 · 632 YONGE ST
  • By-law investigation25 132376 WST 00 IVClosed

    Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to

    Mar 20, 2025 · 632 YONGE ST
  • By-law investigation25 132375 WST 00 IRClosed

    Waste

    Mar 20, 2025 · 632 YONGE ST
  • By-law investigation25 132373 WST 00 IVClosed

    Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to

    Mar 20, 2025 · 632 YONGE ST
  • By-law investigation25 132372 WST 00 IRClosed

    Waste

    Mar 20, 2025 · 632 YONGE ST
Show 15 older records
  • By-law investigation25 132370 WST 00 IVClosed

    Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited.

    Mar 20, 2025 · 632 YONGE ST
  • By-law investigation25 132368 WST 00 IRClosed

    Waste

    Mar 20, 2025 · 632 YONGE ST
  • Building permit23 208879Revision Issued

    Revision 01 - add furnace room and change existing roof top unit to new furnace at retail unit - 632A Yonge StPROPOSED: INTERIOR ALTERATIONS SEPARATE 632 YONGE STREET INTO 2 UNITS - 632 YONGE STREET & 632A YONGE STREET.

    Jul 10, 2024 · 632 YONGE ST
  • Zoning review23 140554 LPRClosed
    May 2, 2023 · 632 YONGE ST
  • Zoning review22 219466 LTOClosed
    Oct 20, 2022 · 630 YONGE ST
  • Zoning review22 166317 ZZUCancelled
    Jun 22, 2022 · 632 YONGE ST
  • Building permit20 133518Closed

    Proposal for interior alterations to existing retail unit for a bubble tea shop.Also includes exterior alterations to the front of the building. - TS

    Jun 1, 2020 · 628 YONGE ST
  • Building permit20 134970Closed

    Proposed interior alterations to convert a vacant retail unit into a take-out eating establishment.

    May 19, 2020 · 628 YONGE ST
  • Building permit17 267856Closed

    To erect and display one illuminated wall sign.** SO CHIC **

    Dec 20, 2017 · 632 YONGE ST
  • Building permit17 266572Closed

    To erect and display one static illuminated wall sign.**CASH SHOP**

    Dec 8, 2017 · 632 YONGE ST
  • Zoning review07 274890 LTOClosed
    Oct 31, 2007 · 632 YONGE ST
  • Zoning review06 181628 LTOClosed
    Oct 4, 2006 · 632 YONGE ST
  • Zoning review88 030052 LTOClosed
    Jan 21, 1988 · 628 YONGE ST
  • Zoning review85 026948 LTOClosed
    Sep 18, 1985 · 628 YONGE ST
  • Zoning review82 026457 LTOClosed
    Sep 16, 1982 · 632 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(2546)

    Needs a closer look

    4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2546)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(2) 132 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 208 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(2) 260 of former City of Toronto By-law 438-86

  4. Older by-law D

    City of Toronto by-law 466-2005

7 parts for other addresses
  • E On 35 Balmuto St., 764 Yonge St., City of Toronto by-law 466-05
  • F On 75 St. Nicholas St., 692 Yonge St., City of Toronto by-law 103-10
  • G On the lands municipally known as 501-523 Yonge St. in 1981, Section 12 (2) 160 of former City of Toronto By-law 438-86
  • H On 501 Yonge St., being former City of Toronto by-law 511-82
  • I On 555 Yonge St., former City of Toronto by-law 284-68
  • J On 619 Yonge St., former City of Toronto by-law 436-75
  • K On 730 Yonge St., former City of Toronto by-laws 22910 and 223-67.
By-law 569-2013, Chapter 900

Lot facts

Area
419 m²
Frontage
16.2 m
Depth
27.4 m
Street
Yonge St
Corner lot
No
Public lane
None
House footprint
155 m²roof up to 8.5 m
Back yard
0.9 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
3house, garage, sheds
Max height
18 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 382. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Yonge Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 3.0 (c2.0; r3.0) SS1 (x2546) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%32 of 32 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
48

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 32 variance decisions: more than at 65% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

    508 CHURCH ST · Sep 9, 2026 · 455 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 88-2023(OLT)) for the 40-storey mixed-use building (which is currently under construction), by increasing the residential gross floor area, building height (41-storeys; 123.5 m to 127.6 m and 129.2 m to 133.6 m), and the height of the elevator overrun projection. There will be a total of 516 residential dwelling units on this site.

    20 MAITLAND ST · Apr 1, 2026 · 291 m away
  • Minor varianceApproved

    To alter the development standards for the previously approved 32-storey and 46-storey, two-tower mixed-use, purpose built rental development with 30 Percent affordable dwelling units and a child care center (approved under Site Specific Zoning By-law 1096-2021), by redistributing the building heights to 33 and 41storeys, increasing podium setbacks, reducing street wall heights, reducing the size of podium to create two separate buildings connected only below grade, decreasing the amount of indoor amenity space, reducing the number of two or more bedroom units, eliminating the resident and non-residential parking requirements, and decreasing the amount of residential visitor spaces. Site plan control application 19 127591 STE 13 SA is under review.

    27 GROSVENOR ST · Jul 30, 2025 · 424 m away
  • Minor varianceApproved

    To alter the development standards for the 40-storey mixed-use building (as approved under Site Specific Zoning By-law 88-2023) by increasing the total number of residential dwelling units, the overall and residential gross floor area, the building height, and the maximum projection height of an elevator overrun. Also, to reduce the total number of residential dwelling units with 3 or more bedrooms, the required amenity space, and the total number of residential visitor parking spaces. The new 45-storey mixed-use building (excluding the mechanical penthouse) will have a total of 572 residential dwelling units, 78 residential parking spaces, and 7 residential visitor parking spaces. This is currently undergoing Site Plan Control (Application Number 19 240163 STE 13 SA).

    26 MAITLAND ST · Apr 23, 2025 · 298 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 193-2024(OLT)), for a new 59-storey mixed-use building, by permitting a private student residence use on this lot. There will be a total of 587 residential dwelling units within this building.

    510 YONGE ST · Mar 19, 2025 · 334 m away

Latest activity nearby

  • Zoning review

    Application Acceptable

    95 ST JOSEPH ST · Nov 24, 2026 · 288 m away
  • Zoning review

    Application On Hold

    649 YONGE ST · Nov 23, 2026 · 191 m away
  • Building permit

    One wall sign.***SIGNATURE HAIR STUDIO***

    665 YONGE ST · Nov 18, 2026 · 238 m away
  • Building permit

    Proposed Hydro Vault Repairs

    1001 BAY ST · Nov 13, 2026 · 160 m away
  • Building permit

    Proposed interior alterations for dental office

    16 WELLESLEY ST W · Nov 10, 2026 · 155 m away
  • Building permit

    Proposed interior alteration at second, third, fifth and sixth floor to convert the property from office building to mixed-use building; Proposed: 10 residential units, 1 wellness studio and 5 officesExisting: 1 wellness studio at first floor and 1 office at fourth floor

    9 ST NICHOLAS ST · Nov 9, 2026 · 116 m away
  • Building permit

    Proposal to convert the second floor of Da.Si.Mar Shawarma into a coffee shop with a maximum seating capacity of 30 people

    673 YONGE ST · Nov 5, 2026 · 254 m away
  • Building permit

    2 Wall Sign****AXIA STATION****

    608 YONGE ST · Nov 5, 2026 · 65 m away
  • Building permit

    Proposal for interior alterations to accommodate new office

    22 ST JOSEPH ST · Nov 4, 2026 · 96 m away
  • Building permit

    REV: Proposed revision for ventilation adjustments based on as-built conditionProposal to replace heating plant, domestic hot water heating, potable water distribution, ventilation and air conditioning systems.

    2 GLOUCESTER ST · Nov 3, 2026 · 68 m away

Neighbourhood: Bay-Cloverhill

About the area around the lot, not the lot itself.

Nearest station
Wellesley Station3 min walk
Nearest TTC stop
Yonge St at Gloucester St1 min walk
Nearest cycling route
Wellesley St WCycle Track, 3 min walk
Nearest traffic count
5,825 vehicles in 8 hYonge St / Gloucester St, 40 m away, Jun 21, 2023
Serious collisions within 500 m
82021–2026, killed or seriously injured: 0 fatal, 4 with pedestrians, 2 with cyclists
Parks
James Canning Gardens1 min walk
Norman Jewison Park1 min walk
George Hislop Park3 min walk

Schools within 1 km

  • THE YMCA ACADEMY SECONDARY SCHOOL Private 5 min walk
  • ST JOSEPH'S COLLEGE SCHOOL English Separate 6 min walk
  • THE ABELARD CENTRE FOR EDUCATION Private 6 min walk
  • HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 7 min walk
  • TORONTO SCHOOL OF THEOLOGY - U OF T, BLDG 434 University 7 min walk
  • NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBay-CloverhillMedian neighbourhood
Median household income (2020)$58,400$84,500
Households that own their home30%54%
Population (2021)16,67016,813
Homes built in 1960 or before4%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBay-CloverhillCity median
Assault601.9636.3
Robbery74.769.5
Auto theft16.6192.6
Theft over $5,00087.246.1
Break and enter286.4172.8
Theft from vehicles145.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.