Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (40% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (38% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 658Building permit open since 2020
Needs a closer lookStill open in the City's records: 20 218916 (Proposed relocating existing office cubicles and the lunchroom, 2020, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (40% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 9Work or applications in progress
Good to knowRecent records on this lot: 25 190191 (Proposal to demolish existing retaining concrete wall along St. Clair Ave E with a leng..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications2 Committee of Adjustment files on this lot
Good to know2 approved. A0361/16SC (Mount Pleasant Group of Cemeteries is proposing to construct a new maintenance building..., 2017); A214/01SC (MULTI-PHASE MAUSOLEUM AT PINE HILLS CEMETERY. TO REDUCE BUILDING SETBACK FROM 25 M TO 18 M, 2001).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
23 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 168939 SIN 00 IRClosed
Signs
May 28, 2026 · 625 BIRCHMOUNT RD - Building permit25 190191Permit Issued
Proposal to demolish existing retaining concrete wall along St. Clair Ave E with a length of 46 m.
Apr 27, 2026 · 625 BIRCHMOUNT RD - Building permit24 134362Closed
Proposal to remove & reinstall one (1) new backflow prevention devicein place of old device that was corroded beyond repair.
Apr 12, 2024 · 625 BIRCHMOUNT RD - Building permit21 184646Closed
Proposal to remove and reinstall one new backflow prevention device in place of old device.
Jul 28, 2021 · 625 BIRCHMOUNT RD - Building permit20 218916Inspection
Proposed relocating existing office cubicles and the lunchroom
Dec 1, 2020 · 625 BIRCHMOUNT RD - Building permit19 110315Closed
Proposed replacement of fire alarm control panel.
Jan 31, 2019 · 625 BIRCHMOUNT RD - Building permit17 226281Cancelled
REV 01: Revision to BLD 17-226281as per bubbled areas. Proposal to revise sanitary connection to suit existing conditions and revised water connection location to suit proposed foundations. Proposed new addition on north side w/ visitation room & servery, new addition on east side w/ public washroom/ storage space including various interior renovations
Aug 3, 2018 · 625 BIRCHMOUNT RD - Building permit18 202891Cancelled
Proposal to erect one temporary tent for - Pine Hills Cemetery & Funeral Centre. Certified # 15-159498Installation date Aug 14/18 to Sept. 28/18
Aug 1, 2018 · 625 BIRCHMOUNT RD
Show 15 older records
- Building permit17 242968Closed
Demolition of existing and construction of a new maintenance building
Oct 23, 2017 · 625 BIRCHMOUNT RD - Building permit17 141044Closed
Demolition of existing and construction of a new maintenance building
Oct 23, 2017 · 625 BIRCHMOUNT RD - Minor varianceA0361/16SCApproved
Mount Pleasant Group of Cemeteries is proposing to construct a new maintenance building to replace the existing one-storey maintenance building on the east side of Pine Hills Cemetery, adjacent to Kennedy Road. The existing building foundation would be partially retained so that the proposed maintenance building maintains the existing side yard setbacks to Kennedy Road.
Feb 16, 2017 · 625 BIRCHMOUNT RD - Zoning review12 271254 ZZUClosedOct 31, 2012 · 625 BIRCHMOUNT RD
- Building permit10 209971Closed
construct addition for mausoleum
Feb 17, 2011 · 625 BIRCHMOUNT RD - Building permit10 196220Closed
HVAC - RENOVATE OFFICE SPACE
Jul 23, 2010 · 625 BIRCHMOUNT RD - Building permit06 158979Closed
Interior alterations and renovations to Administration office
Aug 4, 2006 · 625 BIRCHMOUNT RD - Building permit04 137012Closed
DEMOLITION OF OLD HOUSE ON CEMETERY PROPERTY
Jun 29, 2004 · 570 KENNEDY RD - Building permit02 126117Closed
NEW FREESTANDING 250 CRYPT MAUSOLEUM
Oct 24, 2002 · 625 BIRCHMOUNT RD - Building permit02 160152Closed
PART PERMIT "SUPERSTRUCTURE" FOR PERMIT #02126117
Aug 8, 2002 · 625 BIRCHMOUNT RD - Building permit02 160147Closed
PART PERMIT FOUNDATION FOR PERMIT #02126117
Aug 8, 2002 · 625 BIRCHMOUNT RD - Building permit02 128715Closed
SITE SERVICES
May 13, 2002 · 625 BIRCHMOUNT RD - Zoning review02 115881 PSPClosedJan 16, 2002 · 625 BIRCHMOUNT RD
- Minor varianceA214/01SCApproved
MULTI-PHASE MAUSOLEUM AT PINE HILLS CEMETERY. TO REDUCE BUILDING SETBACK FROM 25 M TO 18 M.
Nov 21, 2001 · 625 BIRCHMOUNT RD - Zoning review01 035915 ZSVClosedOct 24, 2001 · 625 BIRCHMOUNT RD
Lot facts
- Area
- 659,075 m²
- Frontage
- 817.5 m
- Depth
- 820 m
- Street
- Birchmount Rd
- Corner lot
- Yes, also on St Clair Ave E820 m along it
- Public lane
- None
- House footprint
- 2,202 m²roof up to 12.7 m
- Back yard
- 644.4 mhouse to rear lot line
- Side yards
- 348.2 m and 425.2 mhouse to side lot lines
- Buildings on the lot
- 12house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 100%1 of 1 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 0
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Proposal to demolish existing retaining concrete wall along St. Clair Ave E with a length of 46 m.
625 BIRCHMOUNT RD · Apr 27, 2026 · 289 m away - Building permit
Proposal to remove & reinstall one (1) new backflow prevention devicein place of old device that was corroded beyond repair.
625 BIRCHMOUNT RD · Apr 12, 2024 · 289 m away - Building permit
Proposal to remove and reinstall one new backflow prevention device in place of old device.
625 BIRCHMOUNT RD · Jul 28, 2021 · 289 m away - Building permit
Proposed relocating existing office cubicles and the lunchroom
625 BIRCHMOUNT RD · Dec 1, 2020 · 289 m away - Building permit
Proposed replacement of fire alarm control panel.
625 BIRCHMOUNT RD · Jan 31, 2019 · 289 m away - Building permit
REV 01: Revision to BLD 17-226281as per bubbled areas. Proposal to revise sanitary connection to suit existing conditions and revised water connection location to suit proposed foundations. Proposed new addition on north side w/ visitation room & servery, new addition on east side w/ public washroom/ storage space including various interior renovations
625 BIRCHMOUNT RD · Aug 3, 2018 · 289 m away - Building permit
Proposal to erect one temporary tent for - Pine Hills Cemetery & Funeral Centre. Certified # 15-159498Installation date Aug 14/18 to Sept. 28/18
625 BIRCHMOUNT RD · Aug 1, 2018 · 289 m away - Building permit
Demolition of existing and construction of a new maintenance building
625 BIRCHMOUNT RD · Oct 23, 2017 · 289 m away - Building permit
Demolition of existing and construction of a new maintenance building
625 BIRCHMOUNT RD · Oct 23, 2017 · 289 m away - Minor varianceApproved
Mount Pleasant Group of Cemeteries is proposing to construct a new maintenance building to replace the existing one-storey maintenance building on the east side of Pine Hills Cemetery, adjacent to Kennedy Road. The existing building foundation would be partially retained so that the proposed maintenance building maintains the existing side yard setbacks to Kennedy Road.
625 BIRCHMOUNT RD · Feb 16, 2017 · 289 m away
Neighbourhood: Kennedy Park
About the area around the lot, not the lot itself.
- Nearest station
- Scarborough GO Station16 min walk
- Nearest TTC stop
- Birchmount Rd at Anaconda Ave7 min walk
- Nearest cycling route
- Taylor Creek TrlMulti-Use Trail, 10 min walk
- Nearest traffic count
- 7,320 vehicles in 8 hBirchmount Rd / Willowmount Dr, 430 m away, Sep 19, 2016
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
- Parks
- Maywood Tot Lot8 min walk
- Farlinger Ravine8 min walk
- St. Clair Ravine9 min walk
Schools within 1 km
- GENERAL BROCK PUBLIC SCHOOL English Public 9 min walk
- NORMAN COOK JR PUBLIC SCHOOL English Public 13 min walk
- ST JOACHIM CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk
- CORVETTE JR PUBLIC SCHOOL English Public 15 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Kennedy Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,000 | $84,500 |
| Households that own their home | 52% | 54% |
| Population (2021) | 17,110 | 16,813 |
| Homes built in 1960 or before | 34% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Kennedy Park | City median |
|---|---|---|
| Assault | 1521.5 | 636.3 |
| Robbery | 121.5 | 69.5 |
| Homicide | 5.3 | 5.3 |
| Shootings | 15.8 | 10.5 |
| Auto theft | 211.3 | 192.6 |
| Theft over $5,000 | 84.5 | 46.1 |
| Break and enter | 158.5 | 172.8 |
| Theft from vehicles | 401.5 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.