Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 623 College St
623 College St is on a 5.8 m by 24.1 m lot on College St in Trinity-Bellwoods. The zoning is CR. A site-specific exception, 900.11.10(2437), changes some of the usual rules for this address. The City lists the property on its Heritage Register. Listing does not stop changes inside, but the City must get 60 days' notice before any demolition.
The City has 9 records on this lot since 2007. That is more than at 99% of Toronto houses. In 2014, a building permit was filed: "To erect and display one wall sign and one projecting sign on the northerly elevation of first storey, in conjunction with a frozen dessert shoppe. **menchies**". Status: closed. In 2014, a building permit was filed: "Interior alterations to retail unit to create "menchies frozen yogurt"". Status: closed. In 2009, a building permit was filed: "Proposal to construct a fourth floor addition over the existing three-storey building and to construct a rear four-storey addition. first floor is retail…". Status: closed. Nothing on file is open right now.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 81 minor variance applications in the last 10 years and approved 98%. The nearest TTC stop is College St at Grace St, a 1-minute walk.
Summary
What the City's records show on this house
- Heritage property: listedModerate
- Site-specific exception 900.11.10(2437)Moderate
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
City files on this lot
9 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-05-07 | By-law investigation26 156412 GRA 00 IR | Graffiti | Notice Issued | |
| 2026-01-20 | By-law investigation26 107219 GRA 00 IR | Graffiti | Closed | |
| 2025-08-07 | By-law investigation25 206519 000 00 IR | Waste | Request Received | |
| 2014-03-05 | Building permit14 114923 | To erect and display one wall sign and one projecting sign on the northerly elevation of first storey, in conjunction with a frozen dessert shoppe. **Menchies** | Closed | |
| 2014-01-20 | Building permit13 282141 | Interior alterations to retail unit to create "Menchies Frozen Yogurt" | Closed | |
| 2009-08-18 | Building permit09 146404 | Proposal to construct a fourth floor addition over the existing three-storey building and to construct a rear four-storey addition. First floor is retail space, second floor is office space, and the third and fourth floors are 2 residential units. See also 08 203607 ZAL, 08 216 973 MV, and Final and Binding A0031/09TEY. | Closed | |
| 2009-01-07 | Minor varianceA0031/09TEY | To construct a fourth floor addition over the existing three-storey building and to construct a rear four-storey addition. | Approved | |
| 2008-09-15 | Zoning review08 203607 ZAL | No description on file | Closed | |
| 2007-08-10 | Zoning review07 252020 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: listed
- Site-specific exception 900.11.10(2437)
What this part means for this house, in plain EnglishUnlock
Heritage property: listed
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(2437)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2437)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 3.0 (c1.0; r2.5) SS2 (x2437)
- Height limit
- —
- Corner lot
- No
- Public lane
- Ln 1 W Clinton N Gore, 5.4 m along it
- House footprint
- 122 m²
- Back yard
- 0.1 m
- Buildings on the lot
- 4
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 0 development applications within 300 m in 10 years, none open
- 69 suite and multiplex permits within 300 m in 10 years
- 81 minor variance decisions within 300 m, 98% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 7 categories
- Break and enter: 2.0 times the Toronto median
- Theft over $5,000: 1.5 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Trinity-Bellwoods neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Christie StationNearest station18 min walk
- College St at Grace StNearest TTC stop1 min walk
- College StNearest cycling route1 min walk
- St Francis of Assisi Catholic Elementary SchoolSchool3 min walk
- Ecole Elementaire Pierre Elliott TrudeauSchool5 min walk
- Clinton Street Jr Public SchoolSchool5 min walk
- Montrose Jr & Delta Alternative SrSchool9 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3946.7
- Robberycity median 69.558.4
- Shootingscity median 10.55.8
- Auto theftcity median 192.676
- Theft over $5,000city median 46.170.1
- Break and entercity median 172.8350.6
- Theft from vehiclescity median 188.1280.5
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist