Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 62 Presteign Ave
62 Presteign Ave is on a 11.6 m by 34.4 m lot on Presteign Ave in O'Connor-Parkview. The zoning is RD.
The City has 7 records on this lot since 2003. That is more than at 97% of Toronto houses. In 2011, a building permit was filed: "Second revision to existing building permit - revision to add roof over existing front porch and change dormers on front elevation. [construct rear ground…". Status: closed. In 2003, a Committee of Adjustment application was filed: "The applicant is seeking relief from the provisions of the zoning by-law to construct a ground floor l shape addition with dimensions of approx. 2.38 by 9.97…". Status: closed. In 2003, a building permit was filed: "Construct second storey addition & rear 2 storey addition". Status: closed. There is 1 open order or by-law investigation on file. Ask the seller what is outstanding and whether it will be fixed before closing.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 34 minor variance applications in the last 10 years and approved 97%. The nearest TTC stop is Hackberry St at Woodbine Heights Blvd, a 2-minute walk.
Summary
What the City's records show on this house
- 1 open by-law investigationModerate
- No permit for a second unit on fileLowFree check
- Minimum frontage 12 mLow
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units · Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 1 open by-law investigation
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
1 open by-law investigation
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
7 records on file, more than at 97% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2024-02-23 | By-law investigation24 118532 FEN 00 IR | Pool Fence | Rescheduled | |
| 2023-11-23 | Zoning review23 229104 ZAP | No description on file | Closed | |
| 2023-04-06 | Building permit23 131851 | New Deck | Cancelled | |
| 2011-08-08 | Building permit04 105851 | SECOND REVISION TO EXISTING BUILDING PERMIT - REVISION TO ADD ROOF OVER EXISTING FRONT PORCH AND CHANGE DORMERS ON FRONT ELEVATION. [Construct rear ground floor addition; construct second floor addition over existing ground floor.] | Closed | |
| 2003-10-22 | Minor varianceA0502/03TEY | The applicant is seeking relief from the provisions of the zoning by-law to construct a ground floor L shape addition with dimensions of approx. 2.38 by 9.97 metres and 7.35 by 3.47 metres to the existing bungalow. Also proposed is a new second floor with dimensions of 15.24 by 9.97 and a ground floor front deck that is in full compliance. | Approved | |
| 2003-07-02 | Zoning review03 151368 ZPR | No description on file | Closed | |
| 2003-07-02 | Building permit03 151365 | CONSTRUCT SECOND STOREY ADDITION & REAR 2 STOREY ADDITION | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: allowed
- Garden suite: likely fits
- Secondary suite: allowed
What this part means for this house, in plain EnglishUnlock
Minimum frontage 12 m
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- RD (f12.0; a370; d0.6)
- Height limit
- 8.5 m
- Lot coverage limit
- 35%
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 103 m²
- Back yard
- 15.3 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 0 development applications within 300 m in 10 years, none open
- 34 minor variance decisions within 300 m, 97% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
O'Connor-Parkview neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Wynford StationNearest station31 min walk
- Hackberry St at Woodbine Heights BlvdNearest TTC stop2 min walk
- Parkview Hill CresNearest cycling route1 min walk
- Presteign Heights Elementary SchoolSchool6 min walk
- St John XXIII Catholic Elementary SchoolSchool14 min walk
- Gateway Public SchoolSchool15 min walk
- Abacus MontessoriSchool15 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3755.6
- Robberycity median 69.543.6
- Shootingscity median 10.54.8
- Auto theftcity median 192.6179.2
- Theft over $5,000city median 46.138.7
- Break and entercity median 172.877.5
- Theft from vehiclescity median 188.1193.7
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist