Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 62 Fennings St
62 Fennings St is on a 4.9 m by 33.3 m lot on Fennings St in Trinity-Bellwoods. The zoning is R. A site-specific exception, 900.2.10(804), changes some of the usual rules for this address. The lot also fronts Humbert St.
The City has 9 records on this lot since 1981. That is more than at 99% of Toronto houses. In 2024, a building permit was filed: "Revision#1: 1. foundation switch to insulated concrete forms2. some window size and location changes3. addition of preparation for potential future internal…". Status: closed. In 2024, a building permit was filed: "Proposal to demolish the existing house and build a new duplex, with a new carport". Status: closed. In 2023, a Committee of Adjustment application was filed: "To construct a new three-storey townhouse dwelling with front and rear basement walkouts, a front covered porch, a rear ground floor deck, and front and rear…". Status: closed. Nothing on file is open right now.
Within 300 m, 1 development application is open. The nearest TTC stop is Queen St West at Dovercourt Rd, a 3-minute walk.
Summary
What the City's records show on this house
- Records mention multiplex, second unitModerateFree check
- Site-specific exception 900.2.10(804)Moderate
- 1 by-law investigation closed in the last two yearsLow
- The back yard may be too tight for a garden suiteLowFree check
- 1 development application open within 300 mLowFree check
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Records mention multiplex, second unit
- 1 by-law investigation closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Records mention multiplex, second unit
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
9 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-04-16 | By-law investigation26 144953 ZON 00 IR | Zoning | Closed | |
| 2024-09-27 | Building permit24 101402 | REVISION#1: 1. Foundation switch to insulated concrete forms2. some window size and location changes3. Addition of preparation for potential future internal stair4. Detailed design of front awning5. Change to roof pitch so water drains to both east and west of building6. Added detail regarding footings and new south wall foundation based on site conditionsProposal to demolish the existing house and build a new duplex, with a new carport. | Closed | |
| 2024-02-29 | Building permit24 101414 | Proposal to demolish the existing house and build a new duplex, with a new carport. | Closed | |
| 2023-12-15 | Zoning review23 236273 ZAP | No description on file | Closed | |
| 2023-11-08 | Minor varianceA0820/23TEY | To construct a new three-storey townhouse dwelling with front and rear basement walkouts, a front covered porch, a rear ground floor deck, and front and rear third storey balconies. There will be one primary unit and one basement secondary suite within this dwelling. Also, to construct a new two-storey ancillary building (detached garage with an office above), in the rear yard, abutting Humbert Street and a private right-of-way. The rear ground floor deck will connect the ancillary building to the rear of the main dwelling. | Approved | |
| 2023-05-17 | Minor varianceA0232/23TEY | To construct a new three-storey semi-detached dwelling with an integral garage, a rear first storey deck, front and rear basement walkouts, and a rear third storey balcony. There will be one secondary suite within the basement. Also, to construct a new two-storey ancillary building (detached garage) with living accommodation within the second storey. A bridge will connect the second storey of this ancillary building to the rear second storey of the main dwelling. | Refused | |
| 2022-12-19 | Zoning review22 240870 ZAP | No description on file | Closed | |
| 1995-11-22 | Zoning review95 025854 LTO | No description on file | Closed | |
| 1981-01-13 | Zoning review81 029810 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(804)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(804)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(804)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex, second unit
- Garden suite: needs a closer look
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
The back yard may be too tight for a garden suite
LowCheck if it appliesSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d1.0) (x804)
- Height limit
- 11 m
- Corner lot
- Yes, also on Humbert St
- Public lane
- None
- New house permit
- 2024
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m
- In the King-Liberty station area
- 80 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 7 categories
- Break and enter: 2.0 times the Toronto median
- Theft over $5,000: 1.5 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Trinity-Bellwoods neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Exhibition GO StationNearest station19 min walk
- Queen St West at Dovercourt RdNearest TTC stop3 min walk
- Argyle StNearest cycling route2 min walk
- Givins Shaw Jr Public SchoolSchool6 min walk
- Alexander Muir Gladstone Ave & the GroveSchool9 min walk
- Pope Francis Catholic Elementary SchoolSchool11 min walk
- The Orchard Montessori SchoolSchool13 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3946.7
- Robberycity median 69.558.4
- Shootingscity median 10.55.8
- Auto theftcity median 192.676
- Theft over $5,000city median 46.170.1
- Break and entercity median 172.8350.6
- Theft from vehiclescity median 188.1280.5
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist