HousePrecheckCheck an address

62 Bartor RdToronto · zoning, lot size and permit records

Also 64 Bartor Rd

Employment · E 1.0129.6 × 98.4 m11,296 m²on Bartor Rd

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 13 237951 (Installation of solar collector system on roof of existing building, 2013, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
129.6 m frontage98.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2013

    Needs a closer look

    Still open in the City's records: 13 237951 (Installation of solar collector system on roof of existing building, 2013, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • By-law investigation25 187281 WST 00 IRClosed

    Waste

    Jul 3, 2025 · 64 BARTOR RD
  • Building permit13 237951Permit Issued

    Installation of solar collector system on roof of existing building.

    Oct 16, 2013 · 62 BARTOR RD
  • Building permit10 181103Closed

    Installation of (1) first party, illuminated, 25'-0" x 4'-0" wall sign for "ASHLEY COOPER".

    Jun 14, 2010 · 64 BARTOR RD

Lot facts

Area
11,296 m²
Frontage
129.6 m
Depth
98.4 m
Street
Bartor Rd
Corner lot
No
Public lane
None
House footprint
5,922 m²roof up to 12.6 m
Back yard
6.9 mhouse to rear lot line
Side yards
4.6 m and 9.2 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
  • 8 City trees in front of this lot. The City's street tree inventory lists 8 trees at this address: kentucky coffeetree (8 cm), maple, silver (8 cm), kentucky coffeetree (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%4 of 4 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new front entrance with a canopy.

    45 TORBARRIE RD · Jul 16, 2026 · 223 m away
  • Minor varianceApproved

    To permit 4 additional loading spaces. A total of 13 loading spaces will be provided.

    100 CLAYSON RD · Jun 11, 2026 · 143 m away
  • Minor varianceApproved

    To construct new mixed-use building.

    9 TORBARRIE RD · Jun 20, 2024 · 497 m away
  • Minor varianceApproved

    To construct a new industrial building.

    150 BARTOR RD · Aug 16, 2018 · 193 m away
  • Minor varianceApproved

    To construct a new four-storey building which will contain a self storage warehouse.

    69 TORBARRIE RD · Mar 22, 2018 · 214 m away

Latest activity nearby

  • Building permit

    Proposal for an Alternate Solution to use Georg Fisher Fuseal polypropylene piping and Spears CPVC for underground process sanitary pipe and fittings outside the building serving areas at risk and exposure to temperatures of 140F and where harsh chemicals are used for process washdown. Mallot Creek Group is confident this Alternate solution is superior to other alternatives in the Ontario Building Code, as it will not experience thermal deformation and it provides superior resistance to degredation from washdown chemicals.

    100 CLAYSON RD · Oct 15, 2026 · 143 m away
  • Building permit

    The `Alternative Solutions¿ application is needed because travel distances from a portion of the existing building (shown in Grey cross-hatching on the Travel Distance Plan) to a relocated exit will exceed 45 m

    100 CLAYSON RD · Sep 28, 2026 · 143 m away
  • Building permit

    Proposed exterior alterations to the existing commercial building, including construction of a new barrier-free entrance with sidewalk, ramp, landing and stairs, installation of new planters, entrance canopy, facade cladding upgrades, replacement glazing and doors, and associated site improvements.

    45 TORBARRIE RD · Sep 23, 2026 · 223 m away
  • Minor varianceApproved

    To construct a new front entrance with a canopy.

    45 TORBARRIE RD · Jul 16, 2026 · 223 m away
  • Building permit

    Part Permit - Proposed construction of the building shell and exterior envelope for the industrial expansion (Phases 1 & 2) at Gay Lea Clayson Rd. Scope includes the primary structural frame, masonry shafts, exterior wall assemblies, roofing systems, and all exterior doors and windows.

    100 CLAYSON RD · Jun 22, 2026 · 143 m away
  • Minor varianceApproved

    To permit 4 additional loading spaces. A total of 13 loading spaces will be provided.

    100 CLAYSON RD · Jun 11, 2026 · 143 m away
  • Zoning review

    Closed

    100 CLAYSON RD · Mar 9, 2026 · 143 m away
  • Zoning review

    Closed

    45 TORBARRIE RD · Feb 12, 2026 · 223 m away
  • Zoning review

    Closed

    54 BARTOR RD · Feb 4, 2026 · 80 m away
  • Consent (lot split)Approved

    To obtain consent to sever a portion of the lot for the purpose of a lot addition and to create a new easement.

    70-80 CLAYSON RD · Dec 4, 2025 · 130 m away

Neighbourhood: Oakdale-Beverley Heights

About the area around the lot, not the lot itself.

Nearest station
Weston GO Station42 min walk
Nearest TTC stop
Clayson Rd at Huxley Rd2 min walk
Nearest cycling route
Black Creek TrlMulti-Use Trail - Entrance, 11 min walk
Nearest traffic count
1,876 vehicles in 8 hClayson Rd / Huxley Rd, 150 m away, Sep 26, 2013
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Chalkfarm Park10 min walk
Strathburn Park10 min walk
Oakdale Village Park12 min walk

Schools within 1 km

  • ST ANDRE CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • ST SIMON CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk
  • ST BASIL THE GREAT COLLEGE SCHOOL English Separate 15 min walk
  • CHALKFARM PUBLIC SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureOakdale-Beverley HeightsMedian neighbourhood
Median household income (2020)$71,500$84,500
Households that own their home43%54%
Population (2021)21,42016,813
Homes built in 1960 or before33%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleOakdale-Beverley HeightsCity median
Assault1162.2636.3
Robbery15969.5
Homicide4.15.3
Shootings16.310.5
Auto theft452.7192.6
Theft over $5,00077.546.1
Break and enter155172.8
Theft from vehicles273.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.