HousePrecheckCheck an address

6199 Steeles Ave WToronto · zoning, lot size and permit records

Commercial residential · CR 1.0 (c1.0; r1.0) SS337.6 × 42.0 m1,480 m²on Islington Avecorner, also on Steeles Ave W

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelStill open in the City's records: 21 146206 (Proposal for interior alterations to add vape store section to "C " store located at ga..., 2021, status Revocation Pending). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N20 m
37.6 m frontage42.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2021

    Needs a closer look

    Still open in the City's records: 21 146206 (Proposal for interior alterations to add vape store section to "C " store located at ga..., 2021, status Revocation Pending).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

11 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit21 146206Revocation Pending

    Proposal for interior alterations to add vape store section to "C " store located at gas stations

    May 18, 2021 · 6199 STEELES AVE W
  • Zoning review21 141485 LTOClosed
    Apr 16, 2021 · 6199 STEELES AVE W
  • Zoning review21 125883 ZPRClosed
    Mar 11, 2021 · 6199 STEELES AVE W
  • Building permit18 257475Closed

    To erect and display one illuminated ground sign.****MOBIL****

    Nov 29, 2018 · 6199 STEELES AVE W
  • Building permit16 255492Closednew building

    Revision 01 - dimensions of building have been changedProposal to construct building for gas bar convenience store.

    Nov 13, 2017 · 6199 STEELES AVE W
  • Building permit17 101560Closeddemolition

    Demolish existing gas bar kiosk & canopy

    Feb 3, 2017 · 6199 STEELES AVE W
  • Building permit16 216022Closed

    Proposal to construct a new canopy within the existing gas station, Husky.

    Oct 13, 2016 · 6199 STEELES AVE W
  • Building permit09 163973Closed

    Install one 1/2-inch backflow prevention device in existing service station.

    Sep 25, 2009 · 6199 STEELES AVE W
Show 3 older records
  • Zoning review06 124551 LTOClosed
    Apr 10, 2006 · 6199 STEELES AVE W
  • Zoning review06 104164 000Closed
    Jan 23, 2006 · 6199 STEELES AVE W
  • Building permit85 251011Closed - Dormant

    ALUM FACINGS ON CAN

    Dec 25, 1985 · 6199 STEELES AVE W

Lot facts

Area
1,480 m²
Frontage
37.6 m
Depth
42 m
Street
Islington Ave
Corner lot
Yes, also on Steeles Ave W42 m along it
Public lane
None
Max height
10.5 m
Max lot coverage
33%
  • Zone CR 1.0 (c1.0; r1.0) SS3 (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Closed

    6123-6125 STEELES AVE W · Oct 26, 2026 · 29 m away
  • Building permit

    Proposed alteration of existing carport to include a Garage door.

    49 PRIMULA CRES · Oct 1, 2026 · 252 m away
  • Building permitsecondary suite

    Propose to legalize the as-built second unit in the basement and a basement walkout

    44 PRIMULA CRES · Aug 5, 2026 · 210 m away
  • Building permit

    install a back water valve on sanitary drain

    18 MADONNA GDNS · Jun 24, 2026 · 291 m away
  • Building permitgarden suite

    Proposal for new garden suite at rear yard

    27 SOMBRERO CRT · Sep 4, 2024 · 99 m away
  • Zoning review

    Closed

    6123-6125 STEELES AVE W · Aug 22, 2023 · 29 m away
  • Building permitsecondary suite

    proposing to legalize existing basement

    206 PLUNKETT RD · Dec 6, 2022 · 259 m away
  • Building permit

    Install back water valve.

    54 PRIMULA CRES · Sep 2, 2021 · 258 m away
  • Building permit

    Proposal for interior alterations to add vape store section to "C " store located at gas stations

    6199 STEELES AVE W · May 18, 2021 · 4 m away
  • Zoning review

    Closed

    6199 STEELES AVE W · Apr 16, 2021 · 4 m away

Neighbourhood: Humber Summit

About the area around the lot, not the lot itself.

Nearest station
Rowntree Mills Station33 min walk
Nearest TTC stop
Steeles Ave West at Islington Ave East Side1 min walk
Nearest cycling route
Humber River Recreational TrlMulti-Use Trail, 12 min walk
Nearest traffic count
27,157 vehicles in 8 hIslington Ave / Steeles Ave W, 60 m away, Dec 10, 2022
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Rowntree Mills Park3 min walk
Plunkett Park3 min walk
Primula Parkette7 min walk

Schools within 1 km

  • VENERABLE JOHN MERLINI CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHumber SummitMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home72%54%
Population (2021)12,18516,813
Homes built in 1960 or before16%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHumber SummitCity median
Assault1031.8636.3
Robbery191.169.5
Shootings30.610.5
Auto theft672.6192.6
Theft over $5,000191.146.1
Break and enter397.4172.8
Theft from vehicles282.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.