HousePrecheckCheck an address

617 Queen St WToronto · zoning, lot size and permit records

Commercial residential · CR 3.0 (c3.0; r3.0) SS2 (x2088)5.5 × 29.9 m159 m²on Queen St Wbacks onto Ln S Queen E Bathurst

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 8 development applications open within 300 m, up to 29 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • 2 open orders or by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 142690 PRS 00 IV (Order Issued Property Standards: Garbage storage facility not provided.; Storage and ke..., 2026, status Order Issued); 26 142674 PRS 00 IR (Property Standards, 2026, status Order Issued).
  • Major Transit Station Area: King-BathurstThe City plans more homes around the station: good for transit, and more building over time.
N10 m
5.5 m frontage29.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: in a Heritage Conservation District (Part V)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 2 open orders or by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 142690 PRS 00 IV (Order Issued Property Standards: Garbage storage facility not provided.; Storage and ke..., 2026, status Order Issued); 26 142674 PRS 00 IR (Property Standards, 2026, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 29 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • By-law investigation26 142690 PRS 00 IVOrder Issued

    Order Issued Property Standards: Garbage storage facility not provided.; Storage and keeping of material in or on any non-residential property is not for lawful use conducted on the property.

    Apr 13, 2026 · 617 QUEEN ST W
  • By-law investigation26 142674 PRS 00 IROrder Issued

    Property Standards

    Apr 13, 2026 · 617 QUEEN ST W
  • By-law investigation26 137642 WST 00 IRClosed

    Waste

    Apr 1, 2026 · 617 QUEEN ST W
  • Building permit20 221708Refusal Notice

    PROPOSED BEER PATIO WITH PREP/BAR CONTAINER

    Nov 23, 2020 · 617 QUEEN ST W
  • Building permit20 220329Cancellednew building

    PROPOSED BEER PATIO WITH PREP/BAR CONTAINER

    Nov 19, 2020 · 617 QUEEN ST W

Check before you build

  • Site-specific exception 900.11.10(2088)

    Needs a closer look

    5 site-specific rules and 5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2088)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot ; and [TO: 438-86; 12 (2) 80]

  2. Rule B

    The angular plane requirements of regulations 40.10.40.70(2)(D) and (E) do not apply to a building or structure that complies with the permitted maximum height as set out in regulation 40.10.40.10(2)

  3. Rule C

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 232 of former City of Toronto By-law 438-86; (B) Section 12(2) 132 of former City of Toronto By-law 438-86; (C) Section 12(2) 203 of former City of Toronto By-law 438-86

  4. Rule D

    Section 12(2) 207 of former City of Toronto By-law 438-86

  5. Rule E

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

  6. Older by-law A

    On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot ; and [TO: 438-86; 12 (2) 80]

  7. Older by-law B

    The angular plane requirements of regulations 40.10.40.70(2)(D) and (E) do not apply to a building or structure that complies with the permitted maximum height as set out in regulation 40.10.40.10(2)

  8. Older by-law C

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 232 of former City of Toronto By-law 438-86; (B) Section 12(2) 132 of former City of Toronto By-law 438-86; (C) Section 12(2) 203 of former City of Toronto By-law 438-86

  9. Older by-law D

    Section 12(2) 207 of former City of Toronto By-law 438-86

  10. Older by-law E

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
159 m²
Frontage
5.5 m
Depth
29.9 m
Street
Queen St W
Corner lot
No
Public lane
Ln S Queen E Bathurst, 5.5 m along it
Max height
16 m
Max lot coverage
—
  • Major Transit Station Area: King-Bathurst. The lot is inside the King-Bathurst Major Transit Station Area approved by the Province (Site and Area Specific Policy 761). Source
  • King-Spadina Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Queen Street West. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 3.0 (c3.0; r3.0) SS2 (x2088) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: honey locust (7 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%27 of 29 decisions
Garden suite permits
1
Laneway suite permits
4
Multiplex permits
6
Development applications
25

Within 300 m, last 10 years. 11 suite and multiplex permits: more than at 77% of Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a one-storey enclosed free-standing hospitality kiosk that will be fully serviced and used as a servery for an existing outdoor patio, on this site.

    497 RICHMOND ST W · Aug 20, 2025 · 268 m away
  • Minor varianceApproved

    To alter the existing 10-storey condominium building by installing a rooftop patio (including a pergola, and swim spa with privacy fencing).

    533 RICHMOND ST W · Jul 30, 2025 · 148 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1305-2023) for a new 19-storey mixed-use building, by increasing height projections of equipment and structures.

    8 CAMDEN ST · Jul 30, 2025 · 485 m away
  • Minor varianceApproved

    To alter the existing three-storey semi-detached building by constructing three residential dwelling units (on the third floor). The existing retail space on the ground floor and the existing office space on the second floor will be maintained and unaltered. There will be no vehicular or bicycle parking spaces provided on-site.

    485 QUEEN ST W · Jan 29, 2025 · 386 m away
  • Minor varianceApproved

    To construct a new three-storey attached mixed-use building, abutting a rear lane, with a rear ground floor patio, a rear second floor partially covered deck with stairs, and a rear third floor deck with stairs. There will be a total of three units within the mixed-use building (one commercial unit on the and basement and first storey, one residential dwelling unit on the second storey, and one residential dwelling unit on the third storey) and no visitor parking spaces will be provided.

    701 QUEEN ST W · Oct 16, 2024 · 242 m away

Latest activity nearby

  • Zoning review

    Not Started

    632 QUEEN ST W · Nov 10, 2026 · 269 m away
  • Zoning review

    Not Started

    474 QUEEN ST W · Nov 9, 2026 · 217 m away
  • Building permit

    1 Wall Sign*****Mark Health Network*****

    575 QUEEN ST W · Nov 5, 2026 · 130 m away
  • Minor varianceApproved

    To construct a new four-storey detached building (houseplex) with a front entrance and stairs, three side (west) covered entrances with stairs, side (west) second storey covered balconies, a second storey corner (northwest) covered balcony and a rear third floor rooftop patio. Also, there will be three vehicular parking spaces in the rear yard, accessed from the abutting laneway (Lane North Carr East Ryerson). There will be a total of six residential dwelling units on this lot.

    42 CARR ST · Nov 4, 2026 · 263 m away
  • Building permit

    INTERIOR ALTERATIONS TO EXISTING GROUND FLOOR & MEZZANINE LEVEL GROUP A-2 EATING ESTABLISHMENT ('DEAR GRAIN')

    511 RICHMOND ST W · Nov 4, 2026 · 225 m away
  • Building permit

    Proposal for interior alteration of existing office for new model suite.

    555 RICHMOND ST W · Nov 3, 2026 · 89 m away
  • Building permit

    INTERIOR ALTERATION OF EXISTING OFFICE FOR NEW MODEL SUITE.

    555 RICHMOND ST W · Nov 2, 2026 · 89 m away
  • Zoning review

    Closed

    588 RICHMOND ST W · Oct 29, 2026 · 41 m away
  • Building permit

    Interior Alterations involving chanage of use from retail to fitness studio, installing male/female change rooms, a universal WC, one new studio room, minor HVAC/Electrical work.

    610 QUEEN ST W · Oct 23, 2026 · 194 m away
  • Building permit

    REV01: Revising the roof parapet and guard.Proposal for fire damage repairs on roof wooden deck on top of the steel frame roof - Roof parapet to be repaired to match pre-loss conditions. Interior Finishes (Second and Third Floors):Localized removal and replacement of smoke/water-damaged finishes. All finishes - Second-floor ceiling below the wooden deck to be rebuilt - Remove and replace the fire-damaged exterior door within the residential unit (leading to the roof deck), matching pre-loss design and function.

    14 MARKHAM ST · Oct 23, 2026 · 247 m away

Neighbourhood: Wellington Place

About the area around the lot, not the lot itself.

Nearest station
Osgoode Station21 min walk
Nearest TTC stop
Queen St West at Bathurst St1 min walk
Nearest cycling route
Richmond St WCycle Track, 1 min walk
Nearest traffic count
8,228 vehicles in 8 hQueen St W / Ryerson Ave, 60 m away, May 8, 2013
Serious collisions within 500 m
112021–2026, killed or seriously injured: 0 fatal, 6 with pedestrians, 2 with cyclists
Parks
Portland Street Parkette2 min walk
ALEX WILSON COMMUNITY GARDEN - Open Green Space2 min walk
Adelaide Place Parkette4 min walk

Schools within 1 km

  • ST MARY CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
  • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 6 min walk
  • RYERSON COMMUNITY SCHOOL & DOWNTOWN VOCAL MUSIC ACADEMY English Public 7 min walk
  • CHARLES G FRASER JR PUBLIC SCHOOL English Public 9 min walk
  • NIAGARA STREET JR PUBLIC SCHOOL English Public 10 min walk
  • OGDEN JR PUBLIC SCHOOL English Public 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWellington PlaceMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home38%54%
Population (2021)25,57016,813
Homes built in 1960 or before2%29%
Homes needing major repairs1%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWellington PlaceCity median
Assault1169.6636.3
Robbery8269.5
Homicide5.35.3
Shootings10.610.5
Auto theft97.9192.6
Theft over $5,00087.346.1
Break and enter293.7172.8
Theft from vehicles211.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.